Top-Heavy Ratio means the following:
Heavy Vehicle has the meaning given to it in the HNVL.
High voltage bus means the electrical circuit, including the coupling system for charging the REESS that operates on a high voltage.
low voltage means the set of nominal voltage levels that are used for the distribution of electricity and whose upper limit is generally accepted to be an a.c. voltage of 1000V ( or a d.c. voltage of 1500 V). [SANS 1019]
Planned Financed Generation Capacity Resource means a Planned Generation Capacity Resource that, prior to August 7, 2015, has an effective Interconnection Service Agreement and has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close.
high voltage means the classification of an electric component or circuit, if its working voltage is > 60 V and ≤ 1500 V DC or > 30 V and ≤ 1000 V AC root mean square (rms).
Low terrain means any area other than high terrain.
Loop Concentrator/Multiplexer or "LCM" is the Network Element that does one or more of the following: aggregates lower bit rate or bandwidth signals to higher bit rate or bandwidth signals (multiplexing); disaggregates higher bit rate or bandwidth signals to lower bit rate or bandwidth signals (demultiplexing); aggregates a specified number of signals or channels to fewer channels (concentrating); performs signal conversion, including encoding of signals (e.g., analog to digital and digital to analog signal conversion); or in some instances performs electrical to optical (E/O) conversion. LCM includes DLC, and D4 channel banks and may be located in Remote Terminals or Central Offices.
Heavy-duty vehicle means any motor vehicle having a manufacturer’s gross vehicle weight rating greater than 6,000 pounds, except passenger cars.
Potential electrical output capacity means, with regard to a unit, 33 per- cent of the maximum design heat input of the unit.
Generator Forced Outage means an immediate reduction in output or capacity or removal from service, in whole or in part, of a generating unit by reason of an Emergency or threatened Emergency, unanticipated failure, or other cause beyond the control of the owner or operator of the facility, as specified in the relevant portions of the PJM Manuals. A reduction in output or removal from service of a generating unit in response to changes in market conditions shall not constitute a Generator Forced Outage.
Top Heavy Group means an Aggregation Group in which, as of the Determination Date, the sum of:
Geothermal fluid means water in any form at temperatures greater than 120
Generation Capacity Resource shall have the meaning specified in the Reliability Assurance Agreement. Generation Interconnection Customer:
Landing Gear means the installed main and nose landing gear, components and their associated actuators, side braces and parts.
Small quantity generator means a generator who generates less than 1000 kg of hazardous waste in a calendar month.
Motor-driven cycle means every motorcycle that has a gasoline engine that (i) displaces less than
Diatomaceous earth filtration means a process resulting in substantial particulate removal in which a precoat cake of diatomaceous earth filter media is deposited on a support membrane (septum), and while the water is filtered by passing through the cake on the septum, additional filter media known as body feed is continuously added to the feed water to maintain the permeability of the filter cake.
Normal Minimum Generation means the lowest output level of a generating resource under normal operating conditions.
ACP means the "Actual Contribution Percentage" determined pursuant to Section 12.6(d).
Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.
Behind The Meter Generation shall refer to a generation unit that delivers energy to load without using the Transmission System or any distribution facilities (unless the entity that owns or leases the distribution facilities has consented to such use of the distribution facilities and such consent has been demonstrated to the satisfaction of the Office of the Interconnection); provided, however, that Behind The Meter Generation does not include (i) at any time, any portion of such generating unit’s capacity that is designated as a Generation Capacity Resource; or (ii) in an hour, any portion of the output of such generating unit that is sold to another entity for consumption at another electrical location or into the PJM Interchange Energy Market.
Plasma arc incinerator means any enclosed device using a high intensity electrical discharge or arc as a source of heat followed by an afterburner using controlled flame combustion and which is not listed as an industrial furnace.
Non-Retail Behind The Meter Generation means Behind the Meter Generation that is used by municipal electric systems, electric cooperatives, or electric distribution companies to serve load.
EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.
Basic generation service or "BGS" means electric generation