High performance building definition

High performance building means a building that:
High performance building means a public building that is designed, constructed, and capable of being operated in a manner that:
High performance building means a building designed to achieve integrated systems design and construction so as to significantly reduce or eliminate the negative impact of the built environment.

Examples of High performance building in a sentence

  • High performance building helps to create community assets that contribute to neighborhood revitalization over the long term.

  • High performance building integrates with and optimizes the surrounding environment through architectural and site design, construction techniques and materials, as well as resource use and recovery.

  • The action involves the high-performance Metropolitan Municipality Building of Antalya to reach at least B energy Rating; - High performance building envelope (insulation and glazing), - High performance HVAC systems, - Heat recovery ventilation systems, and; - Occupancy control.

  • High performance building projects that meet or exceed the standards identified in these guidelines will be eligible for consideration under this program.Projects are limited to the construction or renovation of a building for the use of a small business and for construction of a building by an individual for use as a primary residence.

  • High performance building standards and reduction of greenhouse gas emissions wereparamount to lowest life cycle cost.

  • For vacations to be taken during a period which overlaps either of the above two periods, employees shall make vacation selections during the above selection period which corresponds to when the vacation will begin.

  • Need some expertise from utility to help make those decisions.• High performance building pilot examples.

  • High performance building goal for the project is to achieve a LEEDgold rating with features including rainwater treatment through a series of planted infiltration basins.Geometric roadway eesignTimes Square, New York, NY.

  • High performance building inherently more costly to construct- High efficiency boiler cannot be introduced to existing building.

  • Red Team key energy efficiency measures:• High performance building envelope for new buildings (R-30 walls & roof)• High performance windows (heat mirror) for new addition.• Ground source heat pump system providing hydronic heating to existing building and new additions.• Solar hot water heating collectors up south face of building for domestic hot water heating and supplement heating for hydronic heating• Shading elements on south and west facing windows.


More Definitions of High performance building

High performance building means a building that integrates and optimizes all major
High performance building means a building that integrates and optimizes all major high-performance building attributes, including but not limited to:
High performance building means a State government
High performance building means a building that meets or exceeds the current version of the U.S. Green Building Council’s Leadership in Energy and Environmental Design (“LEED”) Green Building Rating System Silver rating.
High performance building means a commercial building that achieves at least a Silver rating according to the U.S. Green Building Council’s LEED (Leadership in Energy and Environmental Design) Green Building rating system.

Related to High performance building

  • Modular building means, but shall not be limited to, single and multifamily houses, apartment

  • Key Performance Indicators or “KPIs” means the performance measurements and targets set out in Part 3 of Schedule 1 (Services) of this Framework Agreement;

  • Building Energy Benchmarking means the process of measuring a building’s Energy use, tracking that use over time, and comparing performance to similar buildings.

  • Expandable condominium means a condominium to which additional land may be added in accordance with the provisions of the declaration and of this chapter.

  • Modular building retailer means any person who purchases or acquires a modular building from a

  • Subproject means a specific development activity under Part 3(c)(ii) of the Project, and included in the Community and Sector Development Plans, to be financed out of the proceeds of a Sub-grant; and “Subprojects” means more than one such Subproject.

  • Nonattainment area means an area so designated by the administrator, acting pursuant to Section 107 of the Act.

  • Energy Performance Score means the numeric rating generated by Portfolio Manager that compares the Energy usage of the building to that of similar buildings.

  • Modular building manufacturer means a person or corporation who owns or operates a

  • Performance Measure means one or more of the following selected by the Committee to measure Company, Affiliate, and/or business unit performance for a Performance Period, whether in absolute or relative terms (including, without limitation, terms relative to a peer group or index): basic, diluted, or adjusted earnings per share; sales or revenue; earnings before interest, taxes, and other adjustments (in total or on a per share basis); basic or adjusted net income; returns on equity, assets, capital, revenue or similar measure; economic value added; working capital; total shareholder return; and product development, product market share, research, licensing, litigation, human resources, information services, mergers, acquisitions, sales of assets of Affiliates or business units. Each such measure shall be, to the extent applicable, determined in accordance with generally accepted accounting principles as consistently applied by the Company (or such other standard applied by the Committee) and, if so determined by the Committee, and in the case of a Performance Compensation Award, to the extent permitted under Code Section 162(m), adjusted to omit the effects of extraordinary items, gain or loss on the disposal of a business segment, unusual or infrequently occurring events and transactions and cumulative effects of changes in accounting principles. Performance Measures may vary from Performance Period to Performance Period and from Participant to Participant, and may be established on a stand-alone basis, in tandem or in the alternative.

  • Condominium Plan means a plan described in Section 4285.

  • Motor-driven cycle means every motorcycle that has a gasoline engine that (i) displaces less than

  • Structural component means a component that supports non-variable forces or weights (dead loads) and variable forces or weights (live loads).

  • Performance Corridor means the acceptable range of results around a Performance Target;

  • Continuous parameter monitoring system (CPMS means all of the equipment necessary to meet the data acquisition and availability requirements of the Prevention of Significant Deterioration program, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, O2 or CO2 concentrations), and to record average operational parameter value(s) on a continuous basis.

  • Sound level meter means an instrument which includes a microphone, amplifier, RMS detector, integrator or time averager, output meter, and weighting networks used to measure sound pressure levels.