Initial temperature definition

Initial temperature means the aver- age temperature of the contents of the coldest container to be processed at the time the thermal processing cycle be- gins, as determined after thorough stir- ring or shaking of the filled and sealed container.
Initial temperature means the temperature of the contents of the coldest container to be processed at the time the sterilizing cycle begins, as specified in the scheduled process.

Examples of Initial temperature in a sentence

  • Initial temperature of mixed fluid = 0L, final temperature = T h e n temperature of jacket around observation tube equals temperature of reacted fluid = Of.Average temperature gradient between jacket and the portion of observa-Downloaded from https://royalsocietypublishing.org/ on 17 May 2022Heat Effects inRapid Chemical Chan4g5es9 .tion tube in which reaction takes place = (0L' — 0L) approximately.

  • Gas chromatograph operating conditions Column coating: DB-5 Film thickness: 0.25 µm Column dimension: 60-m x 0.32 mm Injector temperature: 270 EC Splitless valve time: 45 s Interface temperature: Function of the final temperature Temperature program Initial temperature: 200 EC Initial hold time: 2 min 1st temp.

  • Column 1 and Column 2 with cryogenic cooling (example chromatograms are presented in Figures 1 and 2) Carrier gas (He) flow rate: 15 mL/min Initial temperature: 10°C, hold for 5 minutes Temperature program: 6°C/min to 70°C, then 15°C/min to 145°C Final temperature: 145°C, hold until all expected compounds have eluted.

  • This influence can be reflected through the application of priorities on the policies and processes as described in 2.3.1.

  • The following are example conditions which may vary depending on the instrument and column manufacturer’s recommendations: Carrier gas (He) flow rate: 1.0 mL/min Initial temperature: 35EC Temperature program: 35EC for 1 min, 9EC/min to 250EC, hold for 2.5 min Final temperature: 250EC, hold until all expected compounds have eluted.

  • The following are example conditions which may vary depending on the instrument and column manufacturer’s recommendations: Carrier gas (He) flow rate: 4 mL/min Column: J&W DB-624, 70m x 0.53 mm Initial temperature: 40EC, hold for 3 minutes Temperature program: 8EC/min Final temperature: 260EC, hold until all expected compounds have eluted.

  • Carrier gas (helium) flow rate: 15 mL/min Temperature program: Initial temperature: 45 EC, hold for 4 min Program: 45 EC to 220 EC, at 12 EC/min Final temperature: 220 EC, hold for 3 min.

  • Carrier gas (helium) flow rate: 5-7 mL/min Makeup gas (helium) flow rate: 30 mL/min Injector temperature: 200 EC Detector temperature: 340 EC Temperature program: Initial temperature: 45 EC, hold for 1 min 1st Ramp: 45 EC to 100 EC at 5 EC/min 2nd Ramp: 100 EC to 275 EC, at 8 EC/min Final temperature: 275 EC, hold for 5 min.

  • Pa1 = Initial noncondensible gas partial pressure in the vessel, kPa. Pa2 = Final noncondensible gas partial pressure, kPa. T1 = Initial temperature of vessel, K.

  • Carrier gas (helium) flow rate: 40 mL/min Temperature program: Initial temperature: 50 EC, hold for 3 min Program: 50 EC to 170 EC, at 6 EC/min Final temperature: 170 EC, hold for 4 min.

Related to Initial temperature

  • Modular building manufacturer means a person or corporation who owns or operates a

  • technical specification means, with respect to any Software, the document setting forth the technical specifications for such Software and included in the Statement of Work.

  • Technical Specifications means the detailed requirements for the Work furnished by the Architect and set forth in Book 3 of the Contract Documents.

  • Operating pressure means the pressure at which the parts of an irrigation system are designed by the manufacturer to operate.

  • Storage area means any location, facility, or vehicle which is used to store, to transport, or to secure a radiographic exposure device, a storage container, or a sealed source when it is not in use and which is locked or has a physical barrier to prevent accidental exposure, tampering with, or unauthorized removal of the device, container, or source.

  • Standard Specifications means a compilation in book form of specifica- tions approved for general application and repetitive use;

  • parking meter means an apparatus for use on or in the vicinity of a parking place for indicating, as respects a space provided at that parking place for the leaving of vehicles, whether the initial charge has been paid and whether the period for which payment was made by the initial charge has expired;

  • Staging pile means an accumulation of solid, non- flowing remediation waste (as defined in this section) that is not a containment building and that is used only during remedial operations for temporary storage at a facility. Staging piles must be designated by the Director according to the requirements of § 264.554 of this regulation.

  • Temporary clean coal technology demonstration project means a clean coal technology demonstration project that is operated for a period of five years or less and that complies with the SIP and other requirements necessary to attain and maintain the national ambient air quality standards during the project and after the project is terminated.

  • Municipal separate storm sewer system (MS4 means a conveyance or system of conveyances (including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, man-made channels, or storm drains):

  • Small municipal separate storm sewer system or "small MS4" means all separate storm sewers that are (i) owned or operated by the United States, a state, city, town, borough, county, parish, district, association, or other public body (created by or pursuant to state law) having jurisdiction over disposal of sewage, industrial wastes, stormwater, or other wastes, including special districts under state law such as a sewer district, flood control district or drainage district, or similar entity, or an Indian tribe or an authorized Indian tribal organization, or a designated and approved management agency under § 208 of the CWA that discharges to surface waters and (ii) not defined as "large" or "medium" municipal separate storm sewer systems or designated under 4VAC50-60-380 A 1. This term includes systems similar to separate storm sewer systems in municipalities, such as systems at military bases, large hospital or prison complexes, and highway and other thoroughfares. The term does not include separate storm sewers in very discrete areas, such as individual buildings.

  • TENDER SPECIFICATIONS means the Scope of Work, Special Instructions / Conditions, Technical specifications/requirement , Appendices, Site Information and drawings pertaining to the work and any other relevant reference in the Tender Document for which the Bidder are required to submit their offer.

  • Configuration means State-specific changes made to the Software without Source Code or structural data model changes occurring.

  • Signaling System 7 (SS7) means a signaling protocol used by the CCS Network.

  • HVAC System is defined in Section 6.10(a)(v).

  • Storage Space means a space where goods of non-hazardous nature are stored and includes cold storage and banking safe vaults;

  • Installation Site means the site at which the Product is originally installed.

  • Municipal separate storm sewer system means a conveyance or system of conveyances including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, manmade channels, or storm drains.

  • Production Area means that part of the animal feeding operation that includes the animal confinement area, the manure storage area, the raw materials storage area, and the waste containment areas. The animal confinement area includes, but is not limited to, open lots, housed lots, feedlots, confinement houses, stall barns, free stall barns, milkrooms, milking centers, egg washing or egg processing areas, areas used for the storage and disposal/treatment of mortalities, cowyards, barnyards, medication pens, walkers, animal walkways, and stables. The manure storage area includes, but is not limited to, lagoons, runoff ponds, storage sheds, stockpiles, under-house or pit storages, liquid impoundments, static piles, and composting piles. The raw materials storage area includes, but is not limited to, feed silos, and silage bunkers. The waste containment area includes, but is not limited to, settling basins and areas within berms and diversions which separate uncontaminated stormwater.

  • Work area means a room or defined space in a workplace where hazardous chemicals are produced or used, and where employees are present.

  • Large municipal separate storm sewer system means all municipal separate storm sewers that are either:

  • ILUA Area means the geographical area in relation to which the Framework ILUA applies, as specified in Schedule 2 of the Framework ILUA;

  • Customer Premises Equipment or "CPE" means equipment employed on the premises of a Person other than a Carrier to originate, route or terminate Telecommunications (e.g., a telephone, PBX, modem pool, etc.).