We use cookies on our site to analyze traffic, enhance your experience, and provide you with tailored content.

For more information visit our privacy policy.

Integrated Test definition

Integrated Test means a test of the interconnections between fire protection and Life Safety Systems as per CAN/ULC-S1001 “Integrated Systems Testing of Fire Protection and Life Safety Systems”.
Integrated Test to determine whether the Statement of Work components interface and integrate with the Gap IT Environment, and whether each such Statement of Work components operate in the approved operating configuration and in accordance with applicable specifications; and
Integrated Test to determine whether the components of each Deliverable interface and integrate properly with the County System, and whether the components of each such Deliverable operate in the Approved operating configuration and in accordance with applicable specifications.

Examples of Integrated Test in a sentence

  • Where new solutions are needed, requirements processes may have to be followed again to develop URD, SRD, Integrated Test Evaluation & Acceptance Plan (ITEAP) and Through-Life Management Plan (TLMP), as well as the new DSAT training design and delivery documentation.

  • The PM ensures the Chief Developmental Tester or Test Manager establishes an Integrated Test Team after Materiel Development Decision, develops and documents test planning and the level of test support required for the life cycle of the system, and conducts readiness reviews in accordance with AFI 99-103 and AFMAN 63-119, Certification of Systems Readiness for Dedicated Operational Testing.

  • The PM ensures the Chief Developmental Tester or Test Manager and the Integrated Test Team prepares a Test and Evaluation Master Plan prior to Milestone A for applicable programs in accordance with AFI 99-103.

  • The Integrated Test Team forwards the final draft Test and Evaluation Master Plan to the PM and the Chief Engineer for review and for approval by the PM and assists with subsequent coordination to all required organizations below the Air Staff level.

  • The CEDR Asia Pacific Mediation Rules cover termination provisions under Clause 9.

  • The detailed requirement of operational and pre-FAT tests as well as FAT test (Integrated Test) is given in this Section.

  • Tests are expected to last four (4) days, with platform setup on the first day and a test debrief at the end by the Government Team member executing the Integrated Test and Development task.

  • Exercises are expected to last 3.5 days, with platform setup on the first day and an exercise debrief at the end by the Government Team member executing the Integrated Test and Development task.

  • They are often prepared by the OEM and are distributed to COMNAVAIRSYSCOM Program Office, NAVAIR engineering competencies, and Integrated Test Team personnel.

  • The Phase 0 development platform is a modified GVR-BOT Gen 2.0. Details on the modifications may be found in the section on Integrated Test and Development.


More Definitions of Integrated Test

Integrated Test shall have the meaning set forth in Section 19.2(B) (Additional Testing) of the Agreement. 194. INTEGRATION AND TESTING SERVICES‌

Related to Integrated Test

  • integrated circuit means a product, in its final or an intermediate form, in which the elements, at least one of which is an active element, and some or all of the interconnections are integrally formed in and on, or in or on, a piece of material and which is intended to perform an electronic function;

  • Integrated Digital Loop Carrier means a subscriber loop carrier system that is twenty-four (24) local Loop transmission paths combined into a 1.544 Mbps digital signal which integrates within the switch at a DS1 level.

  • Integrated Development Plan means a plan formulated and approved as envisaged in Section 25 of the Municipal Systems Act 2000, as amended.

  • Integrated Services Digital Network (ISDN) means a switched network service that provides end-to-end digital connectivity for the simultaneous transmission of voice and data. Basic Rate Interface-ISDN (BRI-ISDN) provides for a digital transmission of two (2) 64 Kbps bearer channels and one (1) 16 Kbps data channel (2B+D).

  • Integrated pest management means careful consideration of all available plant protection methods and subsequent integration of appropriate measures that discourage the development of populations of harmful organisms and keep the use of plant protection products and other forms of intervention to levels that are economically and ecologically justified and reduce or minimise risks to human health and the environment. ‘Integrated pest management’ emphasises the growth of a healthy crop with the least possible disruption to agro-ecosystems and encourages natural pest control mechanisms;

  • integrated tax means the integrated goods and services tax levied under the Integrated Goods and Services Tax Act;

  • Integrated Software refers to any software or programmable code that is embedded or integrated in a Hardware Device and enables the functionality of the Hardware Device. Integrated Software does not include and You do not have rights to (a) code or functionality for diagnostic, maintenance, repair or technical support services; or (b) separately licensed applications, development tools, or system management software or other code that is separately licensed by us or a third party. You have the limited, non-exclusive right to use Integrated Software delivered with a Hardware Device (and any updates acquired through our technical support services) only as incorporated in, and as part of, the Hardware Device and subject to any terms delivered with or on the Hardware Device and/or in the applicable documentation.

  • Integrated Services Digital Network (ISDN) means a switched network service that provides end-to-end digital connectivity for the simultaneous transmission of voice and data. Basic Rate Interface-ISDN (BRI-ISDN) provides for a digital transmission of two 64 Kbps bearer channels and one 16 Kbps data channel (2B+D).

  • Cannabis testing facility means an entity registered by

  • Combined sewer system means a system for conveying both sanitary sewage and storm water runoff.

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • Integrated resource plan means a plan which contains the demand and energy forecast for at least a fifteen-year period, contains the supplier's or producer's program for meeting the requirements shown in its forecast in an economic and reliable manner, including both demand-side and supply-side options, with a brief description and summary cost-benefit analysis, if available, of each option which was considered, including those not selected, sets forth the supplier's or producer's assumptions and conclusions with respect to the effect of the plan on the cost and reliability of energy service, and describes the external environmental and economic consequences of the plan to the extent practicable. For electrical utilities subject to the jurisdiction of the South Carolina Public Service Commission, this definition must be interpreted in a manner consistent with the integrated resource planning requirements pursuant to Section 58‑37‑40 and any process adopted by the commission. For electric cooperatives subject to the regulations of the Rural Electrification AdministrationUtilities Service, this definition must be interpreted in a manner consistent with any integrated resource planning process prescribed by Rural Electrification Administration Utilities Service regulations.

  • Integrated means classroom and behind-the-wheel instruction scheduled to include a mix of classroom and behind-the-wheel instruction throughout the duration of the driver education course, except as otherwise provided in this section.

  • Fit test means the use of a protocol to qualitatively or quantitatively evaluate the fit of a respirator on an individual.

  • DNS test Means one non-­‐recursive DNS query sent to a particular “IP address” (via UDP or TCP). If DNSSEC is offered in the queried DNS zone, for a query to be considered answered, the signatures must be positively verified against a corresponding DS record published in the parent zone or, if the parent is not signed, against a statically configured Trust Anchor. The answer to the query must contain the corresponding information from the Registry System, otherwise the query will be considered unanswered. A query with a “DNS resolution RTT” 5 times higher than the corresponding SLR, will be considered unanswered. The possible results to a DNS test are: a number in milliseconds corresponding to the “DNS resolution RTT” or, undefined/unanswered.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.

  • Screening Test Technician (STT) means anyone who instructs and assists individuals in the alcohol testing process and operates an ASD.

  • Screening Test means a drug or alcohol test which uses a method of analysis allowed by the Minnesota Drug and Alcohol Testing in the Workplace Act to be used for such purposes.

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Stack means any point in a source designed to emit solids, liquids, or gases into the air, including a pipe or duct but not including flares.

  • Genetic testing means an analysis of genetic markers to exclude or identify a man as the father or a woman as the mother of a child. The term includes an analysis of one or a combination of the following:

  • Penetration Testing means security testing in which assessors mimic real-world attacks to identify methods for circumventing the security features of an application, system, or network. (NIST SP 800-115)