Interruptible Injection Capacity definition

Interruptible Injection Capacity is defined in Article 6.1;
Interruptible Injection Capacity is defined in Article 6.1; “Interruptible Injection Capacity Fee”: is defined in Article 12.4.3; “Interruptible-only Customer”: is defined in Schedule C, Paragraph 1; “Interruptible Space”: is defined in Article 6.3;

Examples of Interruptible Injection Capacity in a sentence

  • Subject to Article 12.4.3 (Interruptible Injection Capacity Fee), Interruption, and pro rate Registered Injection Capacity in accordance with the provisions of Paragraph 3 of Schedule C, GSB shall allocate to and between Storage Customers who have requested Interruptible Injection Capacity, any unused Firm Injection Capacity of other Storage Customers as well as any Injection Capacity that is created by Withdrawal Requests of Storage Customers.

Related to Interruptible Injection Capacity

  • Interruptible Capacity means capacity that may be interrupted by the Operator at any time in order to fulfil shippers’ nominations under a firm capacity reservation.

  • Interruptible means that either party may interrupt its performance at any time for any reason, whether or not caused by an event of Force Majeure, with no liability, except such interrupting party may be responsible for any Imbalance Charges as set forth in Section 4.3 related to its interruption after the nomination is made to the Transporter and until the change in deliveries and/or receipts is confirmed by Transporter.

  • Tank means an enclosed space which is formed by the permanent structure of a ship and which is designed for the carriage of liquid in bulk.

  • Project Capacity means the AC capacity of the project at the generating terminal(s) and to be contracted with MSEDCL for supply from the Solar Power Project.

  • Idle capacity means the unused capacity of partially used facilities. It is the difference between: (a) that which a facility could achieve under 100 percent operating time on a one-shift basis less operating interruptions resulting from time lost for repairs, setups, unsatisfactory materials, and other normal delays; and (b) the extent to which the facility was actually used to meet demands during the accounting period. A multi-shift basis should be used if it can be shown that this amount of usage would normally be expected for the type of facility involved.

  • Customer-generator means a user of a net metering system.

  • Nameplate capacity means the maximum electrical generating output (in MWe) that a generator can sustain over a specified period of time when not restricted by seasonal or other deratings as measured in accordance with the United States Department of Energy standards.

  • Interconnection Customer means a Generation Interconnection Customer and/or a Transmission Interconnection Customer.

  • Load means energy consumed by Customers together with allocated losses and unaccounted for energy;

  • Connection Point means an exit point or an entry point or a bidirectional point identified or to be identified as such in an access contract.

  • Throughput means the measure of production, or factor related to production, used to determine the relationship between the amount of energy used by the target unit and the levels of activity of the target unit, as set out in Schedule 6 to an underlying agreement; “the Tribunal” means the First-tier Tribunal established under the Xxxxxxxx Xxxxxx xxx Xxxxxxxxxxx Xxx 00000;

  • Infiltrative surface means designated interface where effluent moves from distribution media or a distribution product into treatment media or original soil. In standard trench or bed systems this will be the interface of the distribution media or product and in-situ soil. Two separate infiltrative surfaces will exist in a mound system and an unlined sand filter, one at the interface of the distribution media and fill sand, the other at the interface of the fill sand and in-situ soil.

  • Interconnection Point means the point(s) of connection(s) at which the project is connected to the grid i.e. it shall be at 11 / 22 kV bus bar level of substation of MSEDCL.