Examples of LNG Train in a sentence
Power failure simulation shutdown will be initiated to ensure a safe, smooth shutdown sequence is achieved during LNG Train operation.
The Turbine Air Humidification System package will be observed under normal operation when the LNG Train is running at a comfortable high capacity prior to the Performance Tests.
The inlet metering system for the LNG Train will be calibrated and tested per the calibration audit manuals for the metering skid, by others.
Emission testing of the gas turbine exhausts will be done by an outside specialist contractor, after the LNG Train is operating normally and will be done prior to each Performance Test.
The CO2 acid gas removal system will be observed under normal operation when the LNG Train is running at a steady high capacity rate prior to the Performance Tests.
Each LNG Train shall have an LNG Production Rate equal to or greater than *** MMbtu HHV (“LNG Production Rate MAC”), over a 72 hour continuous period using the Measurement and Calculation Methods specified in Attachment S; provided that the LNG Production Rate Performance Guarantee Conditions stipulated in Attachment S are met.
Each LNG Train shall have an LNG Production Rate equal to or greater than *** MMbtu HHV (“LNG Production Rate Performance Guarantee”), produced over a 72 hour continuous period using the Measurement and Calculation Methods specified in Attachment S; provided that the LNG Production Rate Performance Guarantee Conditions stipulated in Attachment S are met.
Out of 1,764 samples tested, four samples were found bacteriologically contaminated.
Maintenance and Operations personnel General Operations Training Contractor / Process Licensors All operations personnel Operations Training Contractor Operations personnel On-the-Job Training and Qualification Contractor Operations and Maintenance Personnel Due to staggered start-up and commissioning of LNG Train 3 and LNG Train 4, the training program outlined below will be duplicated prior to each individual LNG Train start-up and commissioning.
The heavies removal unit is to be operated and tested to achieve successful compliance with the LNG Train Specifications.