Lost Output Workbook definition

Lost Output Workbook has the meaning set forth in Exhibit K.
Lost Output Workbook has the meaning set forth in Exhibit M.
Lost Output Workbook has the meaning set forth in EXHIBIT L.

Examples of Lost Output Workbook in a sentence

  • Seller shall update the Lost Output Workbook each month and shall include the latest revision of the Lost Output Workbook with its monthly Lost Output Report.

  • Seller shall (i) collect the measurement data and perform the engineering calculations specified below in one (1) or more Microsoft Excel Workbooks (the “Lost Output Workbook”) provided in a form and naming convention approved by SCE and (ii) electronically send the Lost Output Workbook to an address provided by SCE.

  • Lost Output as a consequence of Lost Output Events described in Subsection (c) of the definition of Lost Output Event shall be determined by SCE in accordance with the definition of Curtailment Lost Output and shall not be included in the Lost Output Workbook defined in this Exhibit K.

  • Seller shall record Settlement Interval plane of array insolation, in watt-hours per square meter, and Metered Amounts in the Settlement Interval in the Lost Output Workbook on individual Term Year worksheets.

  • Each parameter shall be input into a dedicated worksheet in the Lost Output Workbook which shall be arranged with one (1) column for each Term Year and one (1) row for each hour.

  • In the first research question, findings indicated that inadequate storage facilities affect milk distribution, poor storage affects quality of milk, poor storage facilities brings trouble with handling fresh supply chain, poor storage facilities reduce the number of supplies, and poor storage affects quantity of milk.

  • Seller shall record all hourly Metered Amounts, during the Term, in the Lost Output Workbook on a single worksheet labeled “Metered Amounts”.

  • Seller shall (1) collect the measurement data and perform the engineering calculations specified below in one (1) or more Microsoft Excel Workbooks (the “Lost Output Workbook”) provided in a form and naming convention approved by Anaheim and (2) electronically send the Lost Output Workbook to an address provided by Anaheim.

  • The log shall be kept on a single Worksheet in the Lost Output Workbook.

  • The Log shall be kept on a single Worksheet in the Lost Output Workbook.

Related to Lost Output Workbook

  • Output means the exposure rate, dose rate, or a quantity related in a known manner to these rates from a brachytherapy source or a teletherapy, remote afterloader, or gamma stereotactic radiosurgery unit for a specified set of exposure conditions.

  • piece-work means any system by which earnings are calculated upon the quantity or output of work performed;

  • Outputs means the goods or services that are produced by an entity or other person;

  • Downtime means the Total Minutes in the Month during which the Cloud Service (or Servers for Server Provisioning) does not respond to a request from SAP’s Point of Demarcation for the data center providing the Cloud Service (or Server for Server Provisioning), excluding Excluded Downtime.

  • Net Output means all energy and capacity produced by the Facility, less station use and less transformation and transmission losses and other adjustments (e.g., Seller's load other than station use), if any. For purposes of calculating payment under this Agreement, Net Output of energy shall be the amount of energy flowing through the Point of Delivery.

  • Application Software means Software formulated to perform specific business or technical functions and interface with the business or technical users of the System and is identified as such in Appendix4 of the Contract Agreement and such other Software as the parties may agree in writing to be Application Software.

  • Interface means the mixture occurring in pipeline operations between adjoining batches having similar or dissimilar physical characteristics.

  • Extra Work means any work which is determined by City to be necessary for the proper completion of the Project, but which the Parties did not reasonably anticipate would be necessary at the execution of this Agreement. Consultant shall not perform, nor be compensated for, Extra Work without written authorization from City’s Representative.

  • Connectivity means the provision of a Permanent Separated Bicycle Lane system that reflects desired routes between all major origins and destinations in the city.

  • The Works/Project means the works to be executed or done under this contract.

  • voltage ride through as used herein shall mean the ability of a Small Generating Facility to stay connected to and synchronized with the system or equipment of the Transmission Owner and any Affected Systems during system disturbances within a range of under-voltage and over-voltage conditions, in accordance with Good Utility Practice and consistent with any standards and guidelines that are applied to other generating facilities in the Balancing Authority Area on a comparable basis.

  • medium voltage means the set of nominal voltage levels that lie above low voltage and below high voltage in the range of 1 kV < Un 44 kV. [SANS 1019]

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • Fabrication means making up data or results and recording or reporting them.

  • Punch List Items means such items (i) as are reasonably necessary or appropriate to fully complete the construction, equipping and furnishing of the Hotel in accordance with this Contract and (ii) that, unless otherwise agreed by Buyer in its sole discretion, (a) individually and in the aggregate do not and will not prohibit, cause a delay in or otherwise adversely affect, under applicable Legal Requirements, the Franchise Agreement or otherwise, the opening of the Hotel for business to the public or the continued occupancy and operation of the Hotel as contemplated under the Brand and (b) may be corrected or completed, subject to delays caused by Force Majeure, within not more than sixty (60) days.

  • Design flow means the average annual flow or average daily flow specified in an approved facilities plan or approved plans and specifications, the flow specified in a WPDES permit, or the flow required to meet performance standards.

  • Network Interface Device or "NID" is a Network Element (including all of its features, functions and capabilities) that includes any means of Interconnection of End User Customer premises wiring to Qwest's distribution plant, such as a cross connect device used for that purpose. "New Service Provider" means the Party to which an End User Customer switches its local Exchange Service or the Party to which an End User Customer is porting its telephone number(s).

  • drainage work means any watercourse and includes any land which is expected to provide flood storage capacity for any watercourse and any bank, wall, embankment or other structure, or any appliance, constructed or used for land drainage or flood defence;

  • Custom Local Area Signaling Service Features (CLASS) means certain call-management service features that are currently available from SBC-13STATE’s local networks. These could include: Automatic Call Back; Automatic Recall; Call Trace; Caller Identification and related blocking features; Calling Number Delivery; Customer Originated Trace; Distinctive Ringing/Call Waiting; Selective Call Forward; and Selective Call Rejection.

  • Working voltage means the highest value of an electrical circuit voltage root-mean-square (rms), specified by the manufacturer, which may occur between any conductive parts in open circuit conditions or under normal operating conditions. If the electrical circuit is divided by galvanic isolation, the working voltage is defined for each divided circuit, respectively.

  • Catalogue means the catalogue of IT Products available for Order under the provisions of the Framework Agreement.

  • Operating Software means those routines, whether or not identified as Program Products, that reside in the Equipment and are required for the Equipment to perform its intended function(s), and which interface the operator, other Contractor-supplied programs, and user programs to the Equipment.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.

  • Satellite means any satellite owned by the Issuer or any of its Restricted Subsidiaries and any satellite purchased by the Issuer or any of its Restricted Subsidiaries pursuant to the terms of a Satellite Purchase Agreement, whether such satellite is in the process of manufacture, has been delivered for launch or is in orbit (whether or not in operational service).

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Programming means the process of organisation, decision-making and allocation of financial resources in several stages, with the involvement of partners in accordance with Article 5, intended to implement, on a multi-annual basis, joint action by the Union and the Member States to achieve the objectives of the Union strategy for smart, sustainable and inclusive growth;