Debt service extension base means an amount equal to that
Project Year means the twelve-month period beginning from the Effective Date and ending twelve months thereafter (the First Project Year), and any twelve-month period beginning at the end of the First Project Year, or the end of subsequent Project Years;
PJM Region Installed Reserve Margin means the percent installed reserve margin for the PJM Region required pursuant to RAA, Schedule 4.1, as approved by the PJM Board.
Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.
Maximum Annual Debt Service Requirement means, at any given time of determination, the greatest amount of principal, interest and Amortization Installments coming due in any current or future Bond Year with regard to the Series of Bonds for which such calculation is made; provided, the amount of interest coming due in any Bond Year shall be reduced to the extent moneys derived from the proceeds of Bonds are used to pay interest in such Bond Year.
project completion period means the period of sixty (60) months commencing from and expiring on for the construction and obtaining of Temporary Occupation Permit or Permits for the whole of the Development as provided in clause 3.3;
Incremental Auction Revenue Rights means the additional Auction Revenue Rights, not previously feasible, created by the addition of Incremental Rights-Eligible Required Transmission Enhancements, Merchant Transmission Facilities, or of one or more Customer- Funded Upgrades.
Lateral expansion means a horizontal expansion of the waste boundaries of an existing MSW landfill. A lateral expansion is not a modification unless it results in an increase in the design capacity of the landfill.
Phase 1 means the phase of the ATP comprised of: (1) improvements to the State Street Substation; (2) construction of the Proposed Line; (3) the rebuilding of NYSEG’s existing Lines 971 and 000 xxxxx xx Xxxxxxxx Xxxx xx the NYSEG ROW to allow for construction of the Proposed Line as intended; (4) improvements to the Elbridge Substation to accept the Proposed Line; and (5) National Grid’s conveyance to NYSEG of the NYSEG Acquired ROW and such other land interests as contemplated by the Purchase and Sale Agreement.
Subproject means a specific project to be carried out by an existing BE utilizing the proceeds of a Sub-loan or Investment, as hereinafter defined, fulfilling the conditions set forth in Part A of Schedule 4 to this Agreement;
Incremental Available Transfer Capability Revenue Rights means the rights to revenues that are derived from incremental Available Transfer Capability created by the addition of Merchant Transmission Facilities or of one of more Customer-Funded Upgrades.
Expansion Project has the meaning set forth in Section IV.3.a of this Agreement.
Project Completion Date means the date on which the Completion Certificate is issued;
Generator Maintenance Outage means the scheduled removal from service, in whole or in part, of a generating unit in order to perform necessary repairs on specific components of the facility, if removal of the facility meets the guidelines specified in the PJM Manuals.
Phase III means human clinical trials, the principal purpose of which is to establish substantial evidence of both safety and efficacy in patients with the disease or condition being studied, as more fully defined in 21 C.F.R. §312.21(c) or similar clinical study in a country other than the United States. Phase III shall also include any other human clinical trial intended to serve as a pivotal trial to support the submission of an application for regulatory approval.
Required Reserve Factor Floor means, for any Calculation Period, the sum (expressed as a percentage) of (a) 28.00% plus (b) the product of the Adjusted Dilution Ratio and the Dilution Horizon Ratio, in each case, as of the immediately preceding Cut-Off Date.
Final Completion Date means the date on which Final Completion occurs.
Phase 2 means the phase of the ATP comprised of: (1) improvements to the State Street Substation to receive Rebuilt Line 972; (2) the rebuilding of NYSEG’s existing Line 972 not performed in Phase 1; (3) construction of Relocated Line 15; (4) the construction of Bused Line 5; (5) improvements to the Elbridge Substation to receive Relocated Line 15; and (6) improvements to the Elbridge Substation to receive Bused Line 5.
Construction Completion Date means the Completion Date of the Construction as specified in the Statutory Declaration of Completion for the Project;
Minimum Weighted Average Spread Test means a test that will be satisfied on any date of determination if the Weighted Average Spread of all Eligible Collateral Obligations included in the Collateral on such date is equal to or greater than 5.00%.
Non-Availability Charges has the meaning set forth in the CAISO Tariff.
AMPS Basic Maintenance Amount, as of any Valuation Date, means the dollar amount equal to (i) the sum of (A) the product of the number of shares of AMPS and Other AMPS Outstanding on such Valuation Date multiplied by the sum of (a) $25,000 and (b) any applicable redemption premium attributable to the designation of a Premium Call Period; (B) the aggregate amount of cash dividends (whether or not earned or declared) that will have accumulated for each share of AMPS and Other AMPS Outstanding, in each case, to (but not including) the end of the current Dividend Period that follows such Valuation Date in the event the then current Dividend Period will end within 49 calendar days of such Valuation Date or
Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.
Initial compliance period means the three-year compliance period that begins January 1, 1993, except for the MCLs for dichloromethane, 1,2,4-trichlorobenzene, 1,1,2-trichloroethane, benzo(a)pyrene, dalapon, di(2-ethylhexyl)adipate, di(2-ethyl- hexyl)phthalate, dinoseb, diquat, endothall, endrin, glyphosate, hexachlorobenzene, hexachlorocyclopentadiene, oxamyl, picloram, simazine, 2,3,7,8-TCDD, antimony, beryllium, cyanide, nickel, and thallium, as they apply to a supplier whose system has fewer than 150 service connections, for which it means the three-year compliance period that began on January 1, 1996.
Minimum Weighted Average Coupon Test means a test that will be satisfied on any Measurement Date if the Weighted Average Coupon equals or exceeds 7.0%.
Maximum Concentration Level Assessment means the Maximum Concentration Level Assessment for the purposes of a Basic Comprehensive Certificate of Approval, described in the Basic Comprehensive User Guide, prepared by a Toxicologist using currently available toxicological information, that demonstrates that the concentration at any Point of Impingement for a Compound of Concern that does not have a Ministry Point of Impingement Limit is not likely to cause an adverse effect as defined by the EPA. The concentration at Point of Impingement for a Compound of Concern must be calculated in accordance with O. Reg. 419/05.