Mine Reclamation definition

Mine Reclamation. Coordinators shall mean those persons serving in the positions of Uranium Mine Reclamation Coordinator at NMED and at the New Mexico Energy, Minerals and Natural Resources Department, respectively, pursuant to 2022 N.M. Laws, ch. 26, § 1 and 2.
Mine Reclamation means the removal of any unwanted structures and equipment used during the operation, stabilization of dumps or impound- ments and restoration of the surface of the affected area by miningoperation so that it is returned to natural or economically usable state.The reclama- tion may include, where viable, constructing useful amenities.
Mine Reclamation means the removal of any unwanted structures, equip- ment used during the operation, and stabilization of dumps or impoundments and restoration of the surface of the affected area by mining operation so that it is returned to natural or economically usable state. The reclamation may include, where viable, constructing useful amenities.

Examples of Mine Reclamation in a sentence

  • Imported borrow or aggregate material must come from a surface mine permitted under the Surface Mining and Reclamation Act of 1975 (SMARA), Pub Res Code § 2710, et seq., or from an exempt site.The Department of Conservation, Office of Mine Reclamation maintains a list of permitted mine sites.

  • The AB3098 List is maintained by the Department of Conservation’s Office of Mine Reclamation (OMR) and can be viewed at: www.conservation.ca.gov/OMR/ab_3098_list/index.htm.

  • The restricted cash and investments balance consists of: U.S. Mill and Mine Reclamation The Company has cash, cash equivalents and fixed income securities as collateral for various bonds posted in favour of the State of Utah, the applicable state regulatory agencies in Colorado and Arizona and the U.S. Bureau of Land Management for estimated reclamation costs associated with the White Mesa mill and U.S. mining properties.

  • Per Individual Utility (#) x (#) x $ 250 = $ GP-6Agricultural Crossings and Ramps Per Crossing / Ramp (#) x $ 50 = $ GP-7Minor Road Crossings2 Per Crossing (#) x $ 350 = $ GP-8Temporary Road Crossings2 Per Crossing (#) x $ 175 = $ GP-9Agricultural Activities Per Project $ 50 = $ GP-10 Abandoned Mine Reclamation Per Project $ 500 = $ GP-11 Maintenance, Testing, Repair, Rehabilitation, orReplacement of Water Obstructions and Encroachments1 ........................

  • The 3098 List can be viewed at the Department of Conservation’s Office of Mine Reclamation (OMR) website: www.conservation.ca.gov/OMR/ab_3098_list/index.htm To confirm whether or not a specific operator is on or off the list at any time, contact the Office of Mine Reclamation at (916) 323-9198.

  • The evaluation shall include final documentation of coordination with the Pennsylvania Bureau of Abandoned Mine Reclamation, along with the results of the geotechnical investigation to confirm the final design.

  • The Department of Conservation, Office of Mine Reclamation maintains a list of permitted mine sites.

  • If a Surface Mine Reclamation Permit is needed for this pit - do not include it on this chart - instead put the amount of timber that will be removed for the project in Question 19.

  • First, several of the funds entrusted to the Commissioner are expressly denominated as "trust funds," including: • The Public School Trust Fund;• The Investment Loss Trust Fund;• The Illinois Creek Mine Reclamation Trust Fund; and• The Alaska Heritage Trust Fund.

  • Additionally, when specified in the Contract, the Department will apply a penalty.Report all blasting accidents to the Division of Mine Reclamation and Enforcement, Explosives and Blasting Branch at 502-564-2340.


More Definitions of Mine Reclamation

Mine Reclamation means the removal of any unwanted structures and equipment used during the operation, stabilization of dumps or impound- ments and restoration of the surface of the affected area by mining operation
Mine Reclamation means the removal of any unwanted structures, equipments used during the operation, and stabilization of dumps or im- poundments and restoration of the surface of the lease area so that it is re- turned to natural or economically usable state in line with the Final Mine Closure and Reclamation Plan.

Related to Mine Reclamation

  • Reclamation means the United States Bureau of Reclamation.

  • Reclamation plan means the operator's written proposal, as required and approved by the department, for reclamation of the land that will be disturbed. The proposal must include, to the extent practical at the time of application for an operating permit:

  • Stormwater means water resulting from precipitation (including rain and snow) that runs off the land’s surface, is transmitted to the subsurface, or is captured by separate storm sewers or other sewage or drainage facilities, or conveyed by snow removal equipment.

  • Transportation project or "project" means any or the

  • Mine means to carry on an operation with a view to, or for the purpose of—

  • Mining means the mining, extracting, producing, handling, milling or other processing of Products.

  • Dismantle means to take apart or remove any component, device, or piece of equipment that is bolted, screwed, or fastened by other means and that would not be disassembled by a homeowner in the course of routine household maintenance

  • Water conservation means the preservation and careful management of water resources.

  • Mines means those devices defined in Article 2, Paragraphs 1, 4 and 5 of Protocol II annexed to the Convention on Prohibitions and Restrictions on the Use of Certain Conventional Weapons Which May Be Deemed to Be Excessively Injurious or to Have Indiscriminate Effects of 1980.

  • Soil means all unconsolidated mineral and organic material of any origin.

  • Stormwater Pollution Prevention Plan or "SWPPP" means a document that is prepared in accordance with good engineering practices and that identifies potential sources of pollutants that may reasonably be expected to affect the quality of stormwater discharges from the construction site, and otherwise meets the requirements of this Ordinance. In addition the document shall identify and require the implementation of control measures, and shall include, but not be limited to the inclusion of, or the incorporation by reference of, an approved erosion and sediment control plan, an approved stormwater management plan, and a pollution prevention plan.

  • Groundwater means all water, which is below the surface of the ground in the saturation zone and in direct contact with the ground or subsoil.

  • Stormwater runoff means water flow on the surface of the ground or in storm sewers, resulting from precipitation.

  • Ex-situ conservation means the conservation of components of biological diversity outside their natural habitats.

  • Resource conservation means the reduction in the use of water, energy, and raw materials. (Minn. Stat. § 115A.03, Subd. 26a)

  • Operating Environment means, collectively, the platform, environment and conditions on, in or under which the Software is intended to be installed and operate, as set forth in the Statement of Work, including such structural, functional and other features, conditions and components as hardware, operating software and system architecture and configuration.

  • Wastewater Facilities means the structures, equipment, and processes required to collect, carry away, and treat domestic and industrial wastes and dispose of the effluent.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Remediation waste means all solid and hazardous wastes, and all media (including groundwater, surface water, soils, and sediments) and debris that are managed for implementing cleanup.

  • Pipelines has the meaning set forth in the Recitals.

  • Wastewater means the spent water of a community. From the standpoint of source, it may be a combination of the liquid and water-carried wastes from residences, commercial buildings, industrial plants, and institutions, together with any groundwater, surface water, and storm water that may be present.

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • Brownfield site means an abandoned, idled, or underutilized industrial or commercial facility where expansion or redevelopment is complicated by real or perceived environmental contamination. A brownfield site includes property contiguous with the property on which the individual or commercial facility is located. A brownfield site shall not include property which has been placed, or is proposed for placement, on the national priorities list established pursuant to the federal Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), 42 U.S.C. 9601 et seq.

  • Stormwater management facility means a control measure that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow.

  • conservation area means the areas of the mineral lease within the solid black boundaries on Plan E being respectively the reserves known as ‘Xxxx’ ‘Serpentine’ and ‘Monadnock’, and parts of the reserve known as ‘Lane‑Xxxxx’;

  • Conservation means any reduction in electric power