Mission Bay Park Improvement Zone definition

Mission Bay Park Improvement Zone means those areas encompassed within the boundaries of Mission Bay Park, Oceanfront Walk from the Mission Bay jetty to Crystal Pier and the adjoining seawall, coastal parks and ocean beaches contiguous thereto, Rose Creek from its terminus in Mission Bay to the southern end of the Santa Fe Road flood control channel, Tecolote Creek from its terminus in Mission Bay to the western end of the Tecolote Creek flood control channel and the San Diego River as it passes through the boundaries of Mission Bay Park as described herein. The boundaries of the San Diego River, Rose Creek and Tecolote Creek shall be the width of those waterways to the nearest property line.

Examples of Mission Bay Park Improvement Zone in a sentence

  • The City of San Diego is encouraged to seek other sources of funding for the purposes of improving the Mission Bay Park Improvement Zone and the San Diego Regional Parks, including but not limited to grant funding from other governmental agencies, private individuals, or foundations.

  • The annual budgets allocated for park operations and maintenance in the Mission Bay Park Improvement Zone and the San Diego Regional Parks shall not be reduced at a greater rate or increased at a lesser rate relative to the overall annual budget of park and recreation as a result of monies available hereunder.

  • Nothing contained herein shall prevent the City of San Diego from spending funds in excess of the Mission Bay Park Improvement Fund or San Diego Regional Parks Fund for the purposes of improving the Mission Bay Park Improvement Zone or the San Diego Regional Parks.

  • Given the results of Step 1A and Step 2A, a mitigation plan for covered facilities is not applicable.

  • Completion of bicycle and pedestrian paths and bridges as identified in the Mission Bay Park Master Plan, installation of sustainable lighting in the Mission Bay Park Improvement Zone, installation of signage and landscaping at points of entry to Mission Bay Park and the South Shores, and the repair, resurfacing and restriping of parking lots within the Mission Bay Park Improvement Zone.

  • We learnt that the dynamic response of the system could be construed as being the sum of contributions from a set of uncoupled modes of the system.

  • A subsequent transfer was made to each fund for Mission Bay RV Resort Revenue Less Campland revenue previously recorded and subsequently determined to be outside the Mission Bay Park Improvement Zone Boundary.

  • Completion of bicycle and pedestrian paths and bridges as identified in the Mission Bay Park Master Plan, installation of sustainable lightingin the Mission Bay Park Improvement Zone, installation of signage and landscaping at points of entry to Mission Bay Park and the South Shores, and the repair, resurfacing and restriping of parking lots within the Mission Bay Park Improvement Zone.

  • Allocations to this fund are used to improve the conditions of the Mission Bay Park Improvement Zone for the benefit and enjoyment of residents and visitors, consistent with the Mission Bay Park Master Plan.

Related to Mission Bay Park Improvement Zone

  • Infrastructure improvement means permanent infrastructure that is essential for the public health and safety or that:

  • Site Improvements means any construction work on, or improvement to, streets, roads, parking facilities, sidewalks, drainage structures and utilities.

  • Infrastructure Improvements means a street, road, sidewalk, parking facility, pedestrian mall, alley, bridge, sewer, sewage treatment plant, property designed to reduce, eliminate, or prevent the spread of identified soil or groundwater contamination, drainage system, waterway, waterline, water storage facility, rail line, utility line or pipeline, transit-oriented development, transit-oriented property, or other similar or related structure or improvement, together with necessary easements for the structure or improvement, owned or used by a public agency or functionally connected to similar or supporting property owned or used by a public agency, or designed and dedicated to use by, for the benefit of, or for the protection of the health, welfare, or safety of the public generally, whether or not used by a single business entity, provided that any road, street, or bridge shall be continuously open to public access and that other property shall be located in public easements or rights-of-way and sized to accommodate reasonably foreseeable development of eligible property in adjoining areas. Infrastructure improvements also include 1 or more of the following whether publicly or privately owned or operated or located on public or private property:

  • Project Improvements means site improvements and facilities that are:

  • apartment building means a residential use building, or the residential use portion of a mixed-use building, other than a townhouse or stacked townhouse containing four or more dwelling units each of which shall have access to above grade common halls, stairs, elevators, and yards;

  • Development Site means any parcel or lot on which exists or which is intended for building development other than the following:

  • Clean coal technology demonstration project means a project using funds appropriated under the heading “Department of Energy—Clean Coal Technology,” up to a total amount of $2,500,000,000 for commercial demonstration of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency. The federal contribution for a qualifying project shall be at least 20 percent of the total cost of the demonstration project.

  • Expansion Project has the meaning set forth in Section IV.3.a of this Agreement.

  • Green building strategies means those strategies that minimize the impact of development on the environment, and enhance the health, safety and well-being of residents by producing durable, low-maintenance, resource-efficient housing while making optimum use of existing infrastructure and community services.

  • Energy efficiency improvement means equipment, devices, or materials intended to decrease energy consumption, including, but not limited to, all of the following:

  • Redevelopment Project Area means an area designated by the municipality, which is not less in the aggregate than 1 1/2 acres and in respect to which the municipality has made a finding that there exist conditions which cause the area to be classified as an industrial park conservation area or a blighted area or a conservation area, or a combination of both blighted areas and conservation areas.

  • Water Surface Elevation (WSE means the height, in relation to mean sea level, of floods of various magnitudes and frequencies in the floodplains of coastal or riverine areas.

  • Redevelopment Area means the community redevelopment area described, defined or otherwise identified or referred to in the Redevelopment Plan.

  • Underground facility means any item which shall be buried or placed below ground for use in connection with the storage or conveyance of water, sewage, electronic, telephone or telegraphic communications, electric energy, oil, gas or other substances, and shall include, but not be limited to pipes, sewers, conduits, cables, valves, lines, wires, manholes, attachments and those portions of poles and their attachments below ground.

  • Cogeneration facility means a power plant in which the heat or steam is also used for industrial or commercial heating or cooling purposes and that meets Federal Energy Regulatory Commission standards for qualifying facilities under the Public Utility Regulatory Policies Act of 1978 (16

  • Home improvement contract means an oral or written

  • Generation Interconnection Facilities Study means a Facilities Study related to a Generation Interconnection Request.

  • Needs Improvement the Educator’s performance on a standard or overall is below the requirements of a standard or overall, but is not considered to be unsatisfactory at this time. Improvement is necessary and expected.  Unsatisfactory: the Educator’s performance on a standard or overall has not significantly improved following a rating of needs improvement, or the Educator’s performance is consistently below the requirements of a standard or overall and is considered inadequate, or both.

  • Home improvement means the remodeling, altering,

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Tourism destination project means a qualified non-gaming

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Improvement Plan means the plan required by the Authority from the Supplier which shall detail how the Supplier will improve the provision of the Goods and/or Services pursuant to Clause 29.1.1 (Authority Remedies);

  • Site Plan means a document or map that may be required by a county during a preliminary review preceding the issuance of a building permit to demonstrate that an owner's or developer's proposed development activity meets a land use requirement.

  • Project Site(s) means the place(s) specified in the SCC for the supply and installation of the System.

  • Access Road means a road that leads from a Provincial Trunk Highway, Provincial Road, or a municipal road;