Nonproject Water definition

Nonproject Water means water made available for delivery to Contractors that is not Project Water as defined in Article 1(ah).
Nonproject Water means all water that meets all of the following specifications: (i) water that is not defined as Project Water herein; (ii) water that was included in meeting the demands of the SDS Participants and was analyzed pursuant to the National Environmental Policy Act of 1969 (NEPA) (P.L. 91-190; 42 U.S.C § 4321) in the Final Environmental Impact Statement (FEIS) Numbered 08-63 and Record of Decision (ROD) Numbered GP-2009-01; and (iii) water that is listed on the table attached as Exhibit E and made a part of this Contract.
Nonproject Water means water made available for delivery to contractors that is not project water as defined in Article 1(j). 15 Amended: Amendment Xx. 00 00 Xxxxxxx: Xxxxxxxxx Xx. 00 00 Amended: Amendment No. 16

Examples of Nonproject Water in a sentence

  • If requested by the Contracting Officer, the District shall submit and revise, if necessary, a written schedule of the anticipated monthly demands for Excess Capacity in Pueblo Reservoir for the storage of Nonproject Water and Project Return Flows pursuant to this Master Contract.

  • The United States is not responsible for the control, carriage, transportation losses, handling, use, disposal, or distribution of any Nonproject Water or Project Water Return Flows stored in Excess Capacity at Pueblo Reservoir beyond Pueblo Reservoir.

  • The District shall be charged annually for each acre-foot of Excess Capacity in Pueblo Reservoir which is made available to it for the storage of Nonproject Water and Project Water Return Flows.

  • Subject to the District’s compliance with Article 6, beginning January 1, 2017, the District is authorized to annually utilize up to 29,938 acre-feet of Excess Capacity in Pueblo Reservoir, if and when available, by subcontracting with Master Contract Participants for the storage of Nonproject Water and Project Water Return Flows in such Excess Capacity in accordance with Article 9 herein and subject to the terms and conditions of this Master Contract and to Federal Reclamation law.

  • If requested by the Contracting Officer, the Contractor shall submit and revise, if necessary, a written schedule of the anticipated monthly demands for the Excess Capacity of the Contractor’s Nonproject Water and Project Return Flows.

  • The purpose of this Contract is to provide for the use of Excess Capacity in Project facilities to store and exchange the Contractor’s Nonproject Water and Project Water Return Flows for the Contractor’s subsequent use and exchange pursuant to the terms and conditions of this Contract.

  • The purpose of this Contract is to provide for the use of Excess Capacity in Project facilities to store the Contractor’s Nonproject Water and Project Water Return Flows for the Contractor’s subsequent use pursuant to the terms and conditions of this Contract.

  • At the request of the District, Participant shall submit and revise, if necessary, a written schedule of the anticipated monthly demands for the Excess Capacity storage of Participant’s Nonproject Water and Project Water Return Flows pursuant to this Subcontract.

  • If at any time during the term of this Contract, Colorado Springs Utilities fails to implement or comply with the environmental commitments, the Contracting Officer may immediately cease storage and conveyance of Nonproject Water and Project Water Return Flows until the commitments are implemented and fulfilled to the satisfaction of the Contracting Officer.

  • Water stored pursuant to Articles 12(e) and 14(b) and Nonproject Water shall not be transferred or exchanged.


More Definitions of Nonproject Water

Nonproject Water means water that: (i) is not defined as Project Water herein; and (ii) was included in meeting the demands of the Master Contract Participants and was analyzed pursuant to NEPA.
Nonproject Water means water made available for delivery to Contractors that is not Project Water as defined in Article 1(ah). (ab) “Project Facilities” shall mean those facilities of the System which will, in whole or in part, serve the purposes of this contract by conserving water and making it available for use in and above the Delta and for export from the Delta and from such additional facilities as are defined in Article 1(a)(2), and by conveying water to the [District]. Such Project Facilities shall consist specifically of “Project Conservation Facilities” and “Project Transportation Facilities”, as hereinafter defined. (ac) “Project Conservation Facilities” shall mean such Project Facilities as are presently included, or as may be added in the future, under 1(a) and 1(t). (ad) “Project Interest Rate” shall mean the following:
Nonproject Water means the Contractor’s Arkansas River water rights under Colorado decrees numbered 84CW62, 84CW63, 84CW64 (Colorado Canal decrees) 83CW18, 87CW63 (Rocky Ford I decrees), 99CW169 and 99CW170 (Xxxxx Xxxx XX decrees) and the Contractor’s leased Arkansas River water rights pursuant to the laws of the State of Colorado that were analyzed in the National Environmental Policy Act of 1969 (NEPA) (P.L. 91-190; 42 USC §4321) compliance document.

Related to Nonproject Water

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Wastewater System means a system of wastewater collection, treatment,

  • Contractor System means the information and communications technology system used by the Contractor in performing the Services including the Software, the Contractor Equipment and related cabling (but excluding the Authority System).

  • Storm water or wastewater collection system means piping, pumps, conduits, and any other equipment necessary to collect and transport the flow of surface water run-off resulting from precipitation, or domestic, commercial, or industrial wastewater to and from retention areas or any areas where treatment is designated to occur. The collection of storm water and wastewater does not include treatment except where incidental to conveyance.

  • The Project Site, where applicable, means the place or places named in the SCC.

  • Project site, where applicable, means the place indicated in bidding documents.

  • Wastewater facilities means the structures, equipment, and processes required to collect, carry away, and treat domestic and industrial wastes and dispose of the effluent.

  • Permit area means the area constituted by the blocks that are the subject of a permit;

  • Water System means the plants, structures and other

  • Potable water means water that is fit for human consumption;

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Transportation project or "project" means any or the

  • Infrastructure Improvements means a street, road, sidewalk, parking facility, pedestrian mall, alley, bridge, sewer, sewage treatment plant, property designed to reduce, eliminate, or prevent the spread of identified soil or groundwater contamination, drainage system, waterway, waterline, water storage facility, rail line, utility line or pipeline, transit-oriented development, transit-oriented property, or other similar or related structure or improvement, together with necessary easements for the structure or improvement, owned or used by a public agency or functionally connected to similar or supporting property owned or used by a public agency, or designed and dedicated to use by, for the benefit of, or for the protection of the health, welfare, or safety of the public generally, whether or not used by a single business entity, provided that any road, street, or bridge shall be continuously open to public access and that other property shall be located in public easements or rights-of-way and sized to accommodate reasonably foreseeable development of eligible property in adjoining areas. Infrastructure improvements also include 1 or more of the following whether publicly or privately owned or operated or located on public or private property:

  • Generation Interconnection Facilities Study means a Facilities Study related to a Generation Interconnection Request.

  • Community water system means a public water system which serves at least 15 service connections used by year-round residents or regularly serves at least 25 year-round residents.

  • Water Surface Elevation (WSE means the height, in relation to NAVD 1988, of floods of various magnitudes and frequencies in the floodplains of riverine areas.

  • Project Area means land or lands located within the incentive

  • Decommissioning means the measures taken at the end of a facility's operating life to assure the continued protection of the public from any residual radioactivity or other potential hazards present at a facility.

  • Electrical Interconnection Facilities means the equipment and facilities required to safely and reliably interconnect a Facility to the transmission system of the Transmitting Utility, including the collection system between each Bloom System, transformers and all switching, metering, communications, control and safety equipment, including the facilities described in any applicable Interconnection Agreement.

  • Surface water means all water which is open to the atmosphere and subject to surface runoff.

  • Project Improvements means site improvements and facilities that are: