Open space means undeveloped land, a naturally landscaped area, or a formal or man-made landscaped area that provides a connective link or a buffer between other resources.
public open space means the securing of an area of a site at grade or street level which is acceptable to the City and is appropriately landscaped for the use and enjoyment of the public during reasonable hours.
Construction Commencement Date means the date set out in the Addendum, if applicable, by which you must commence construction of the Hotel. For the Hotel to be considered under construction, youmust have begun to pour concrete foundations for the Hotel or otherwise satisfied any site-specific criteria for “under construction” set out in the Addendum.
Change Management means the add-on module to the Programs that enables engineers to define network changes through one or more configuration templates. Those network changes can be applied to multiple devices and executed/rolled back automatically. The Change Management module enables engineers to verify the impact of the changes across the network to help ensure a safer change process.
Project Start Date means the first Milestone Start Date specified in Schedule B;
Security Management Plan means the Supplier's security management plan prepared pursuant to paragraph 3 of schedule 2 an outline of which is set out in paragraph 2.7 of the Order Form as updated from time to time;
Project Management Plan means the portion of the Project Development Plan providing the information requested in Section 4.2 of Exhibit B to the ITP.
Construction Start Date means the later to occur of the date on which Seller delivers to Buyer (a) a copy of the Notice to Proceed that Seller has delivered to the EPC Contractor for the Project, and (b) a written Certification substantially in the form attached hereto as Appendix IV-1.
Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.
Construction Completion means physical construction of a cleanup action component is complete.
Construction-manager-at-risk means a project delivery method in which:
Collocation Space means an area of space located in a Building to be used by CLEC to house telecommunications equipment. Additionally, roof or wall space used for wireless interconnection shall be included in the definition where applicable.
Adaptive management means reliance on scientific methods to test the results of actions taken so that the management and related policy can be changed promptly and appropriately.
New Building ’ means a new construction to house a complete motor vehicle as- sembly process, where that construction includes the pouring or construction of a new foundation and floor, the erection of a new frame and roof, and the instal- lation of new plumbing and electrical and other utilities;
Customer Premises Equipment or "CPE" means equipment employed on the premises of a Person other than a Carrier to originate, route or terminate Telecommunications (e.g., a telephone, PBX, modem pool, etc.).
Grave space means a space of ground in a cemetery that is used or intended to be used for an in-ground burial.
construction site means a workplace where construction work is being performed;
On-premise banquet license means a license issued in accordance with
Improvement completion assurance means a surety bond, letter of credit,