Operational Environmental Management Plan definition

Operational Environmental Management Plan means the plan of that name prepared in accordance with this Agreement, including Section F.7.9 of Schedule 8 (Services Specifications). Operational Handover Plan means the plan of that name prepared by Project Co in accordance with the Project Agreement and provided to the Operator by the State.
Operational Environmental Management Plan. (OEMP) means the environmental management plan setting out measures for the ongoing environmental protection of the Property, as amended or varied with the approval of Council from time to time, and which the HOA is obliged to enforce and Owners are obliged to comply with.
Operational Environmental Management Plan or “OEMP” has the meaning given in Section 14.4(a) [Operational Environmental Management Plan] of Schedule 8 [Environmental Obligations];

Examples of Operational Environmental Management Plan in a sentence

  • Additional information can be found in the document “Environmental Management Plans: Policy and Guidelines”.Where minor, short-term works are assessed as posing low or negligible environmental risk, the CEMP requirement may be waived by JAH.Prior to a lessee occupying and commencing operations, a tenant Operational Environmental Management Plan (OEMP) is required unless the lessee is assessed as having a ‘Low’ environmental risk profile and JAH have issued an OEMP exemption.

  • The Operational Environmental Management Plan (OEMP) has been prepared by Stolthaven Australia for the operation and maintenance of the Stolthaven Newcastle Terminal.

  • Bidders need to adhere to the Operational Environmental Management Plan of working within the Tsitsikamma Section of Garden Route National Park where particular caution is taken onto consideration to ensure that there is limited or no impact on the environment.

  • In accordance with the Transmission Licence, Basslink reports on the compliance components of the Operational Environmental Management Plan, these are independently audited and reported to the regulator in accordance with the licence requirements which at present is every two years.

  • Condition C4 of SSD 7267 requires SUEZ prepare an Operational Environmental Management Plan (this plan) to the satisfaction of the Secretary.

  • Condition ResponseC4The Applicant must prepare an Operational Environmental Management Plan (OEMP) to the satisfaction of the Secretary.

  • The Applicant must prepare an Operational Environmental Management Plan (OEMP) in accordance with the requirements of condition C1 and submit it to the Planning Secretary for approval.C6.

  • This Operational Environmental Management Plan was generated by staff members permanently employed by NamPower within the Safety, Health, Environmental and Wellness (SHEW) Section.

  • Bidders need to adhere to the Operational Environmental Management Plan of working within the forest location where particular caution is taken onto consideration to ensure that there is limited or no impact on the environment.

  • This Operational Environmental Management Plan has been prepared for the major bulk liquids storage facility owned and operated by Stolthaven Terminals at the Port of Newcastle, New South Wales, Australia.The bulk diesel storage facility is located on property leased from The Port of Newcastle at the Mayfield Precinct previously occupied by the BHP Billiton steelmaking facility.


More Definitions of Operational Environmental Management Plan

Operational Environmental Management Plan means the plan of that name prepared in accordance with this Agreement, including Schedule 19 (Plans). means the plan of that name to be prepared by Project Co in accordance with this Agreement, including Schedule 19 (Plans). means the operational agreement for the cooperation and coordination of activities in relation to the operation and maintenance of the Stadium and Sports Precinct between the State, the Stadium Operator and Project Co, to be entered into once the Stadium Operator is appointed. has the meaning given in Clause 36.4(a).
Operational Environmental Management Plan means the document prepared to describe the operational arrangements required to minimise impacts on key environmental assets and fish species for Third Reedy Lake;
Operational Environmental Management Plan means the plan of that name prepared in accordance with this Agreement, including Schedule 19 (Plans).

Related to Operational Environmental Management Plan

  • Environmental Management Plan or “EMP” means the environmental management plan for the Project, including any update thereto, incorporated in the IEE;

  • Environmental Management System means an environmental management system or plan of management to address all environmental risks and to ensure compliance with all Environmental Laws and licences;

  • Environmental Management Framework or “EMF” means the policy framework for environmental management, approved by the Project Implementing Entity’s Board of Directors on July 21, 2009, which sets forth the environmental policies and procedures that shall apply to the carrying out of the Project.

  • Environmental and Social Management Plan or “ESMP” means a site-specific environmental and social management plan to be prepared in accordance with the parameters laid down in the ESMF and acceptable to the Association, setting forth a set of mitigation, monitoring, and institutional measures to be taken during the implementation and operation of the Project activities to eliminate adverse environmental and social impacts, offset them, or reduce them to acceptable levels, and including the actions needed to implement these measures.

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • Environmentally-Limited Resource means a resource which has a limit on its run hours imposed by a federal, state, or other governmental agency that will significantly limit its availability, on either a temporary or long-term basis. This includes a resource that is limited by a governmental authority to operating only during declared PJM capacity emergencies.

  • Project Management Plan means the portion of the Project Development Plan providing the information requested in Section 4.2 of Exhibit B to the ITP.

  • Safety Management System means a systematic approach to managing safety, including the necessary organisational structures, accountabilities, policies and procedures;

  • Hazardous Waste Management Facility means, as defined in NCGS 130A, Article 9, a facility for the collection, storage, processing, treatment, recycling, recovery, or disposal of hazardous waste.

  • Quality Management Plan means the portion of the Project Development Plan providing the information requested in Section 4.3 of Exhibit B to the ITP.

  • Transportation Company means any organization which provides its own or its leased vehicles for transportation or which provides freight forwarding or air express services.

  • Solid waste management facility means the same as that term is defined in Section 19-6-502.

  • Virginia Stormwater Management Program authority or "VSMP authority" means an authority approved by the State Board after September 13, 2011, to operate a Virginia Stormwater Management Program.

  • Stormwater management system means any equipment, plants,

  • Environmental Infrastructure System means the Environmental Infrastructure Facilities of the Borrower, including the Project, for which the Borrower is receiving the Loan.

  • Nutrient management plan means a plan developed or approved by the Department of Conservation and Recreation that requires proper storage, treatment and management of poultry waste, including dry litter, and limits accumulation of excess nutrients in soils and leaching or discharge of nutrients into state waters.

  • Management Plan means a plan to manage the activities and protect the special value or values in an Antarctic Specially Protected Area or an Antarctic Specially Managed Area.

  • Environmental, Health and Safety Liabilities means any cost, damages, expense, liability, obligation or other responsibility arising from or under any Environmental Law.

  • Asset Management Plan means a strategic document that states how a group of assets are to be managed over a period of time. The plan describes the characteristics and condition of infrastructure assets, the levels of service expected from them, planned actions to ensure the assets are providing the expected level of service, and financing strategies to implement the planned actions. The plan may use any appropriate format, as long as it includes the information and analysis required to be in a plan as described in Ontario’s Building Together: Guide for Asset Management Plans.

  • Environmental and Social Management Framework or “ESMF” means the framework included in the EA setting out modalities to be followed in assessing the potential adverse environmental and social impact associated with activities to be implemented under the Project, and the measures to be taken to offset, reduce, or mitigate such adverse impact.

  • Virginia Stormwater Management Program or “VSMP” means a program approved by the State Board after September 13, 2011, that has been established by a locality to manage the quality and quantity of runoff resulting from land-disturbing activities and shall include such items as local ordinances, rules, permit requirements, annual standards and specifications, policies and guidelines, technical materials, and requirements for plan review, inspection, enforcement, where authorized in this article, and evaluation consistent with the requirements of this article and associated regulations.

  • Environmental Site Assessment means a Phase I environmental report meeting the requirements of the American Society for Testing and Materials, and, if in accordance with customary industry standards a reasonable lender would require it, a Phase II environmental report, each prepared by a licensed third party professional experienced in environmental matters.

  • energy management system means a set of interrelated or interacting elements of a plan which sets an energy efficiency objective and a strategy to achieve that objective;

  • Procurement Plan means the Recipient’s procurement plan for the Project, dated April 2, 2010, and referred to in paragraph 1.16 of the Procurement Guidelines and paragraph 1.24 of the Consultant Guidelines, as the same shall be updated from time to time in accordance with the provisions of said paragraphs.

  • New Jersey Stormwater Best Management Practices (BMP) Manual or “BMP Manual” means the manual maintained by the Department providing, in part, design specifications, removal rates, calculation methods, and soil testing procedures approved by the Department as being capable of contributing to the achievement of the stormwater management standards specified in this chapter. The BMP Manual is periodically amended by the Department as necessary to provide design specifications on additional best management practices and new information on already included practices reflecting the best available current information regarding the particular practice and the Department’s determination as to the ability of that best management practice to contribute to compliance with the standards contained in this chapter. Alternative stormwater management measures, removal rates, or calculation methods may be utilized, subject to any limitations specified in this chapter, provided the design engineer demonstrates to the municipality, in accordance with Section IV.F. of this ordinance and N.J.A.C. 7:8-5.2(g), that the proposed measure and its design will contribute to achievement of the design and performance standards established by this chapter.

  • Stormwater management BMP means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management BMP may either be normally dry (that is, a detention basin or infiltration system), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).