Commissioning Period has the meaning set forth in Attachment T.
Decommissioning Plan means the document containing detailed information on the proposed decommissioning and covering the following: the selected decommissioning strategy; the schedule, type and sequence of decommissioning activities; the waste management strategy applied, including clearance; the proposed end state; the storage and disposal of the waste from decommissioning; the timeframe for decommissioning; the cost estimates for the completion of decommissioning; and the objectives, expected results, milestones, target dates, as well as the corresponding key performance indicators, including, as appropriate, earned value based indicators. The plan is prepared by the nuclear facility license holder and is reflected in the multiannual work programmes of the Programme;
service delivery and budget implementation plan means a detailed plan approved by the mayor of a municipality in terms of section 53(1) (c) (ii) for implementing the municipality’s delivery of municipal services and its annual budget.
Training program means an NCA-approved Iowa college, the Iowa law enforcement academy or an Iowa hospital approved by the department to conduct emergency medical care training.
the Programme means the programme leading to the Degree of Master of Laws – LL.M – in International Maritime Law;
Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:
Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".
Project Commissioning means the Project will be considered as commissioned if all equipment as per rated project capacity has been installed and energy has flown into grid, in line with the Commissioning procedures defined in the RfS/PPA.
Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.
Project Implementation Manual or “PIM” means the manual setting out the measures required for the implementation of the Project, as the same may be amended from time to time, subject to prior approval of the Association;
Project Implementation Unit or “PIU” means the unit referred to in Section I.A.1 of Schedule 2 to this Agreement.
Development Plan has the meaning set forth in Section 3.2.
Pre-commissioning means the testing, checking, and any other required activity that may be specified in the Technical Requirements that are to be carried out by the Supplier in preparation for Commissioning of the System as provided in GCC Clause 26 (Installation).
Phase 1 means the phase of the ATP comprised of: (1) improvements to the State Street Substation; (2) construction of the Proposed Line; (3) the rebuilding of NYSEG’s existing Lines 971 and 000 xxxxx xx Xxxxxxxx Xxxx xx the NYSEG ROW to allow for construction of the Proposed Line as intended; (4) improvements to the Elbridge Substation to accept the Proposed Line; and (5) National Grid’s conveyance to NYSEG of the NYSEG Acquired ROW and such other land interests as contemplated by the Purchase and Sale Agreement.
Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.
Development Phase means the period before a vehicle type is type approved.
Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.
Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.
Development Program means the implementation of the development plan.
Program Plan means the tobacco settlement program plan dated February 14, 2001, including exhibits to the program plan, submitted by the authority to the legislative council and the executive council, to provide the state with a secure and stable source of funding for the purposes designated by section 12E.3A and other provisions of this chapter.
Development Plans means a coherent set of operations defined and financed exclusively by the OCTs in the framework of their own policies and strategies of development, and those agreed upon between an OCT and the Member State to which it is linked;
Commissioning Date means that date when construction of the contemplated Project is complete, and the Maintenance Term commences;
Utilization review means the prospective (prior to), concurrent (during) or retrospective (after) review of any service to determine whether such service was properly authorized, constitutes a medically necessary service for purposes of benefit payment, and is a covered healthcare service under this plan. WE, US, and OUR means Blue Cross & Blue Shield of Rhode Island. WE, US, or OUR will have the same meaning whether italicized or not. YOU and YOUR means the subscriber or member enrolled for coverage under this agreement. YOU and YOUR will have the same meaning whether italicized or not.
Public works project means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind.
Utilization review plan or "plan" means a written procedure for performing review.
Programme shall have the meaning set forth in Clause 10.1 (iii);