Examples of Paving operation in a sentence
This is illustrated in figure 5.1.4b above, which shows the acyclic directed case.
Paving operation shall ensure that the new basin location is low point along the shoulder.
This is illustrated in figure 5.1.4b above, which shows the acyclic directed case.
Paving operation shall ensure that the new basin location is low point along the shoulder.
Project means the goods or Services described in the Signature Document or a Work Order of this Contract.
Stormwater management BMP means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management BMP may either be normally dry (that is, a detention basin or infiltration system), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).
Salvage operation means any business, trade or industry engaged in whole or in part in salvaging or reclaiming any product or material, including but not limited to metals, chemicals, shipping containers or drums.
Parking Facilities means parking lots or other off-street areas for the parking of vehicles, including areas below or above the surface of streets.
parking bay means any area of a parking place which is provided for the leaving of a vehicle and indicated by markings on the surface of the parking place;
Parking Facility means a parking area or structure having
Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.
Landfill means a disposal facility or part of a facility where hazardous waste is placed in or on land and which is not a pile, a land treatment facility, a surface impoundment, an underground injection well, a salt dome formation, a salt bed formation, an underground mine, a cave, or a corrective action management unit.