Phase or “Phases” in respect of the Project shall mean that the components of the Project are placed in service during more than one year during the Investment Period, and the word “Phase” shall therefore refer to the applicable portion of the Project placed in service in a given year during the Investment Period.
Phase 1 means the phase of the ATP comprised of: (1) improvements to the State Street Substation; (2) construction of the Proposed Line; (3) the rebuilding of NYSEG’s existing Lines 971 and 000 xxxxx xx Xxxxxxxx Xxxx xx the NYSEG ROW to allow for construction of the Proposed Line as intended; (4) improvements to the Elbridge Substation to accept the Proposed Line; and (5) National Grid’s conveyance to NYSEG of the NYSEG Acquired ROW and such other land interests as contemplated by the Purchase and Sale Agreement.
Phase 2 means the phase of the ATP comprised of: (1) improvements to the State Street Substation to receive Rebuilt Line 972; (2) the rebuilding of NYSEG’s existing Line 972 not performed in Phase 1; (3) construction of Relocated Line 15; (4) the construction of Bused Line 5; (5) improvements to the Elbridge Substation to receive Relocated Line 15; and (6) improvements to the Elbridge Substation to receive Bused Line 5.
Tests on Completion means the tests which are specified in the Contract or agreed by both Parties or instructed as a Variation, and which are carried out under Clause 9 [Tests on Completion] before the Works or a Section (as the case may be) are taken over by the Procuring Entity.
Study Completion means the database for the Study has been locked and all Essential Documents have been provided to the Sponsor, including a copy of the letter from the Reviewing HREC acknowledging receipt of the final report and/or closure letter from the Principal Investigator.
Tests after Completion means the tests (if any) which are specified in the Contract and which are carried out in accordance with the Specification after the Works or a Section (as the case may be) are taken over by the Procuring Entity.
Phase III means human clinical trials, the principal purpose of which is to establish substantial evidence of both safety and efficacy in patients with the disease or condition being studied, as more fully defined in 21 C.F.R. §312.21(c) or similar clinical study in a country other than the United States. Phase III shall also include any other human clinical trial intended to serve as a pivotal trial to support the submission of an application for regulatory approval.
Design Criteria Package means concise, performance-oriented drawings or specifications for a public construction project. The purpose of the Design Criteria Package is to furnish sufficient information to permit Design-Build Firms to prepare a bid or a response to the District’s Request for Proposals, or to permit the District to enter into a negotiated Design- Build Contract. The Design Criteria Package must specify performance- based criteria for the public construction project, including the legal description of the site, survey information concerning the site, interior space requirements, material quality standards, schematic layouts and conceptual design criteria of the project, cost or budget estimates, design and construction schedules, site development requirements, provisions for utilities, stormwater retention and disposal, and parking requirements applicable to the project. Design Criteria Packages shall require firms to submit information regarding the qualifications, availability, and past work of the firms, including the partners and members thereof.
Construction Completion means physical construction of a cleanup action component is complete.
Timeline means the list of critical dates and actions included in the Introductory Materials.
Turbidity means the cloudy condition of water due to the presence of extremely fine particulate materials in suspension that interfere with the passage of light.
Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.
Impact surface means an interior or exterior surface that is subject to damage by repeated sudden force such as certain parts of door frames.
Testson Completion means the tests which are specified in the Contractor agreed by both Parties or instructed as a Variation, and which are carried out under Clause 9 [Tests on Completion] before the Works or a Section (as the case may be) are taken over by the Procuring Entity.
Construction Completion Date means the Completion Date of the Construction as specified in the Statutory Declaration of Completion for the Project;
Project Completion means the date, as determined by the Division after consultation with the Recipient, that operation of the Project is initiated or is capable of being initiated, whichever comes first.
Design flow means the average annual flow or average daily flow specified in an approved facilities plan or approved plans and specifications, the flow specified in a WPDES permit, or the flow required to meet performance standards.
Cost Estimate means the detailed projected expenditure, including material costs and overhead, equipment costs and overhead, labor costs and overhead, and all taxes associated with each major material and service component, required for a line extension. It shall also separately identify any incremental costs associated with providing premium services. The Company may, for the purpose of standardization, establish standard construction cost estimates, for basic or premium service plans, which shall not exceed, in any event, the average cost of constructing such line extensions in the area involved, in which case the term “cost estimate” as used in this section will be understood to mean the standard estimate thus established.
Space Plan means the space plan to be prepared by Tenant in accordance with paragraph 2 below and approved by Landlord and Tenant, and showing the general configuration of the Tenant Improvements.
Phase II means the second part of the tuition incentive assistance program which provides assistance in the third and fourth year of 4-year degree programs.
Preliminary assessment means the first phase in the process of identifying areas of concern and determining whether contaminants are or were present at a site or have migrated or are migrating from a site, and shall include the initial search for and evaluation of, existing site specific operational and environmental information, both current and historic, to determine if further investigation concerning the documented, alleged, suspected or latent discharge of any contaminant is required. The evaluation of historic information shall be conducted from 1932 to the present, except that the department may require the search for and evaluation of additional information relating to ownership and use of the site prior to 1932 if such information is available through diligent inquiry of the public records.
Yearly (1/Year) sampling frequency means the sampling shall be done in the month of September, unless specifically identified otherwise in the effluent limitations and monitoring requirements table.
Completion Schedule means the fulfilment of the Related Services by the Supplier in accordance with the terms and conditions set forth in the Contract;
Energy efficiency improvement means equipment, devices, or materials intended to decrease energy consumption, including, but not limited to, all of the following:
Project Scope means the description or activity of work to be accomplished on the project.
Construction Schedule means a construction schedule indicating the planned start and completion dates of the major activities of the Work as set out in Appendix [ ], a future Appendix;