PMAX definition

PMAX means the maximum generator real power output reported in MWs on a seasonal basis.
PMAX has the meaning set forth in the CAISO Tariff.
PMAX means the applicable CAISO-certified maximum operating level of the Storage Facility.

Examples of PMAX in a sentence

  • Unit Reactive Limits should be modeled at a 95% power factor of the PMAX.

  • The solver can also address partial maximum (PMAX) SAT prob- lems: given a set of clauses S (a ‘maximization set’), find assignments that max- imise the number of satisfied clauses in S.

  • The probability of rebuilding a fish stock by TMAX; a higher PMAX probability is associated with a lower fishing mortality rate.

  • ERCOT will model SODGs in using the “Standard PMCR” project type in MOD.TSPs may model resource and resource equipment not requiring ERCOT registration and not required by the Generation Interconnection process if they desire the resource to be in the SSWG case.ERCOT shall update the PMAX and PMIN values based upon the Resource Registration Data net seasonal sustainable ratings.

  • At all times during a Test, the Storage Unit(s), including all auxillary equipment, shall be operated in compliance with the Test Plan, Prudent Electrical Practices and all operating protocols recommended, required or established by the manufacturer for operation at PMAX and PMIN.


More Definitions of PMAX

PMAX means the applicable CAISO-certified maximum operating level of the Facility. “PMIN” means the applicable CAISO-certified minimum operating level of the Facility. “PNode” has the meaning set forth in the CAISO Tariff.
PMAX means the applicable CAISO-certified maximum operating level of a Generating Unit.
PMAX means the applicable CAISO-certified maximum operating level of the Facility. “PMIN” means the applicable CAISO-certified minimum operating level of the Facility.
PMAX is defined in Appendix A to the CAISO Tariff.
PMAX means the applicable CAISO-certified maximum operating level (in MW) of the Energy Storage System.
PMAX means the applicable CAISO-certified maximum operating level of the Facility.
PMAX means the applicable CAISO-certified maximum operating level of the Facility. “PMin” means the applicable CAISO-certified minimum operating level of the Facility. “PNode” has the meaning set forth in the CAISO Tariff.