Preoperational Tests definition

Preoperational Tests means the tests conducted as provided in Section 11.3.
Preoperational Tests means the tests conducted as provided in Section 11.3. "Price Adjustment Provisions" means the terms set forth in Article 7 and Exhibit J.
Preoperational Tests means the tests conducted as provided in Section 11.3. “Price Adjustment Provisions” means the terms set forth in Article 7 and Exhibit J.

Examples of Preoperational Tests in a sentence

  • Preoperational Tests at elevated pressure and temperature are referred to as hot functional tests.

  • Activities during the Preoperational Tests are conducted in accordance with a Startup Administrative Manual as provided in the Project Execution Plan.

  • The testing that shall be performed on-Site consists of Construction and Installation Tests, Preoperational Tests, Startup Tests and the Performance Test, each as described in this Article 11.

  • The Preoperational Test Group is responsible for conducting the Preoperational Tests in accordance with the Project Schedule.

  • Abstracts for the Preoperational Tests for portions of systems/components that perform safety-related functions; perform defense-in-depth functions; contain, transport, or isolate radioactive material; and for other applicable systems are specified in Chapter 14 of the Design Control Document.

  • Contractor shall provide on a [**] the assistance to Owner during the Preoperational Tests, the Startup Tests and the Performance Test (including without limitation Technical Support) required hereunder.

  • A copy of all Preoperational Tests, Acceptance Tests, Startup Tests, Special Test Procedures, and all relevant data recorded during the conduct of the tests will be maintained for the life of the station in accordance with station procedures for record retention.

  • For all PRMD names which are not involved in the Pre- operational Tests, a default routing to a "Dummy MTA direction" shall be defined in order to handle exceptional situations within the Pre-operational Tests as well as for future operations.

  • Per Reference 5.3-15, Figure 5.3-4 is applicable at the MUR power uprate condition.5.3.2.1.2 Temperature Limit for Preoperational Tests and Inservice Inspection Based on the NRC general revision to 10CFR50, Appendix G, Document No. [7590-1], paragraph IV.A.4, the preoperational system hydrostatic test at 1563 psig prior to fuel loading was performed at a minimum temperature of 100F for Unit 1 without fuel in the reactor, and 100F for Unit 2.

  • Acceptance Testing was divided into five phases: (1) Pre-operational Tests, (2) System Startup Tests, (3) Hot Functional Tests, (4) Nuclear Startup Tests, and (5) Power Ascension Tests.

Related to Preoperational Tests

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".

  • Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • Test means such test as is prescribed by the particulars or considered necessary by the Inspecting Officer whether performed or made by the Inspecting Officer or any agency acting under the direction of the Inspecting Officer;

  • Testing means that element of inspection that determines the properties or elements, including functional operation of materials, equipment, or their components, by the application of established scientific principles and procedures.

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Project Requirements means the statement included in the Request for Proposal detailing the technical and other requirements of Canada which are to be met by the successful Bidder, and which are to be addressed in the Bid;

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • S&P CDO Monitor Test A test that will be satisfied on any date of determination (following receipt, at any time on or after the S&P CDO Monitor Election Date, by the Issuer and the Collateral Administrator of the Class Break-even Default Rates for each S&P CDO Monitor input file (in accordance with the definition of “Class Break-even Default Rate”)) if, after giving effect to a proposed sale or purchase of an additional Collateral Obligation, the Class Default Differential of the Highest Ranking Class of the Proposed Portfolio is positive. The S&P CDO Monitor Test will be considered to be improved if the Class Default Differential of the Proposed Portfolio that is not positive is greater than the corresponding Class Default Differential of the Current Portfolio.

  • DNS test Means one non-­‐recursive DNS query sent to a particular “IP address” (via UDP or TCP). If DNSSEC is offered in the queried DNS zone, for a query to be considered answered, the signatures must be positively verified against a corresponding DS record published in the parent zone or, if the parent is not signed, against a statically configured Trust Anchor. The answer to the query must contain the corresponding information from the Registry System, otherwise the query will be considered unanswered. A query with a “DNS resolution RTT” 5 times higher than the corresponding SLR, will be considered unanswered. The possible results to a DNS test are: a number in milliseconds corresponding to the “DNS resolution RTT” or, undefined/unanswered.

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • Penetration Testing means security testing in which assessors mimic real-world attacks to identify methods for circumventing the security features of an application, system, or network. (NIST SP 800-115)

  • Drug test means a test designed to detect the illegal use of a controlled substance.

  • Marijuana testing facility means an entity licensed to analyze and certify the safety and potency of marijuana.

  • Commissioning Period has the meaning set forth in Attachment T.

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • Phase 1 means the phase of the ATP comprised of: (1) improvements to the State Street Substation; (2) construction of the Proposed Line; (3) the rebuilding of NYSEG’s existing Lines 971 and 000 xxxxx xx Xxxxxxxx Xxxx xx the NYSEG ROW to allow for construction of the Proposed Line as intended; (4) improvements to the Elbridge Substation to accept the Proposed Line; and (5) National Grid’s conveyance to NYSEG of the NYSEG Acquired ROW and such other land interests as contemplated by the Purchase and Sale Agreement.

  • Project Scope means the description or activity of work to be accomplished on the project.

  • Cannabis testing facility means an entity registered by