Examples of Q&A Log in a sentence
The responses given by Seller or on behalf of Seller by Seller’s Representatives in the Q&A Log have been prepared in good faith.
The responses given by Seller or on behalf of Seller by Seller’s Representatives in the Q&A Log have been prepared in good faith.
Data Log means a complete record of all Data Interchanged representing the Messages and their Associated Data between the parties;
QA/QC means quality assurance/quality control.
Beam axis means a line from the source through the centers of the x-ray fields.
Minor source baseline date means the earliest date after the trigger date on which a major stationary source or a major modification subject to 40 CFR 52.21 or to regulations approved pursuant to 40 CFR 51.166 submits a complete application under the relevant regulations. The trigger date is:
Ultra Low Sulfur Diesel Fuel means diesel fuel that has a sulfur content of no more than fifteen parts per
Best available control technology (BACT means an emissions limitation (including a visible emission standard) based on the maximum degree of reduction for each pollutant subject to regulation under CAA which would be emitted from any proposed major stationary source or major modification which the Department, on a case-by-case basis, takes into account energy, environmental, and economic impacts and other costs, determines is achievable for such source or modification through application of production processes or available methods, systems, and techniques, including fuel cleaning or treatment or innovative fuel combustion techniques for control of such pollutant. In no event shall application of best available control technology result in emissions of any pollutant which would exceed the emissions allowed by any applicable standard under 7 DE Admin. Code 1120 and 1121. If the Department determines that technological or economic limitations on the application of measurement methodology to a particular emissions unit would make the imposition of an emissions standard infeasible, a design, equipment, work practice, operational standard, or combination thereof, may be prescribed instead to satisfy the requirement for the application of best available control technology. Such standard shall, to the degree possible, set forth the emissions reduction achievable by implementation of such design, equipment, work practice or operation, and shall provide for compliance by means which achieve equivalent results.
Manual Load Dump Action means an Operating Instruction, as defined by NERC, from PJM to shed firm load when the PJM Region cannot provide adequate capacity to meet the PJM Region’s load and tie schedules, or to alleviate critically overloaded transmission lines or other equipment. Manual Load Dump Warning:
Commercially Sensitive Information Schedule means the Schedule containing a list of the Commercially Sensitive Information.
Planned External Financed Generation Capacity Resource means a Planned External Generation Capacity Resource that, prior to August 7, 2015, has an effective agreement that is the equivalent of an Interconnection Service Agreement, has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close, and has secured at least 50 percent of the MWs of firm transmission service required to qualify such resource under the deliverability requirements of the Reliability Assurance Agreement.
Unpublished Price Sensitive Information (UPSI means any information, relating to a Company or its Securities, directly or indirectly, that is not generally available which upon becoming generally available, is likely to materially affect the price of Securities of the Company and shall, ordinarily include but not be restricted to, information relating to the following:
Erosion and sediment control plan means a comprehensive plan developed to address pollution caused by erosion and sedimentation of soil particles or rock fragments during construction.
UNICEF Supply Website means UNICEF's public access webpage available athttp://www.unicef.org/supply/index_procurement_policies.html, as may be updated from time to time.
Cathode ray tube or “CRT” means a vacuum tube, composed primarily of glass, which is the visual or video display component of an electronic device. A “used, intact CRT” means a CRT whose vacuum has not been released. A “used, broken CRT” means glass removed from its housing or casing whose vacuum has been released.
Filter profile means a graphical representation of individual filter performance, based on continuous turbidity measurements or total particle counts versus time for an entire filter run, from startup to backwash inclusively, that includes an assessment of filter performance while another filter is being backwashed.
Diatomaceous earth filtration means a process resulting in substantial particulate removal in which a precoat cake of diatomaceous earth filter media is deposited on a support membrane (septum), and while the water is filtered by passing through the cake on the septum, additional filter media known as body feed is continuously added to the feed water to maintain the permeability of the filter cake.
Opium poppy means the plant of the species Papaver somniferum L., except its seeds.
Catalog means the available list of tangible personal property or services, in the most current listing, regardless of date, during the life of the contract, that takes the form of a catalog, price list, schedule, shelf price or other form that:
Merit system plan means those regulations adopted by the Board in the development and operation
User Manual means the user guide, Help Guide, documentation provided with the Software, updated agreements provided on the website of Quick Heal (xxx.xxxxxxxxx.xxx), explanatory or other materials as provided from time to time by Quick Heal.
MI Reporting Template means the form of report set out in the Annex to Framework Schedule 8 (Management Information) setting out the information the Supplier is required to supply to the Authority;
Best available control technology or “BACT” means an emissions limitation, including a visible emissions standard, based on the maximum degree of reduction for each regulated NSR pollutant which would be emitted from any proposed major stationary source or major modification which the reviewing authority, on a case-by-case basis, taking into account energy, environmental, and economic impacts and other costs, determines is achievable for such source or modification through application of production processes or available methods, systems, and techniques, including fuel cleaning or treatment or innovative fuel combination techniques for control of such pollutant. In no event shall application of best available control technology result in emissions of any pollutant which would exceed the emissions allowed by any applicable standard under 567—subrules 23.1(2) through 23.1(5) (standards for new stationary sources, federal standards for hazardous air pollutants, and federal emissions guidelines), or federal regulations as set forth in 40 CFR Parts 60, 61 and 63 but not yet adopted by the state. If the department determines that technological or economic limitations on the application of measurement methodology to a particular emissions unit would make the imposition of an emissions standard infeasible, a design, equipment, work practice, operational standard or combination thereof may be prescribed instead to satisfy the requirement for the application of best available control technology. Such standard shall, to the degree possible, set forth the emissions reduction achievable by implementation of such design, equipment, work practice or operation and shall provide for compliance by means which achieve equivalent results.
Spectrum Compatibility means the capability of two (2) copper loop transmission system technologies to coexist in the same cable without service degradation and to operate satisfactorily in the presence of cross talk noise from each other. Spectrum compatibility is defined on a per twisted pair basis for specific well-defined transmission systems. For the purposes of issues regarding Spectrum Compatibility, service degradation means the failure to meet the Bit Error Ratio (BER) and Signal-to-Noise Ratio (SNR) margin requirements defined for the specific transmission system for all Loop lengths, model Loops, or loss values within the requirements for the specific transmission system.
Drug-free workplace means a site for the performance of work done in connection with a specific contract at which the employees of the Contractor are prohibited from engaging in the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance.
Available resources means funds appropriated for the
Access Tandem Switch is a Switch used to connect End Office Switches to interexchange Carrier Switches. Qwest's Access Tandem Switches are also used to connect and switch traffic between and among Central Office Switches within the same LATA and may be used for the exchange of local traffic.
Copper Loop A stand-alone Local Loop comprised entirely of copper wire or copper cable. Copper Loops include two-wire and four-wire analog voice-grade Copper Loops, digital Copper Loops (e.g., DS0s and Integrated Services Digital Network lines), as well as two-wire and four-wire Copper Loops conditioned to transmit the digital signals needed to provide digital subscriber line services, regardless of whether the Copper Loops are in service or held as spares. A Copper Loop includes attached electronics using Time Division Multiplexing (TDM) technology, but does not include packet, cell or frame switching capabilities.