Removal action work plan definition

Removal action work plan means a work plan prepared or approved by
Removal action work plan means a work plan prepared or approved by the response action agency that is developed to carry out a removal action with an estimated capital cost of less than $1,000,000, in an effective manner, that is protective of the public health and safety and the environment. The removal action work plan shall include a detailed engineering plan for conducting the removal action, a description of the onsite contamination, the goals to be achieved by the removal action, and any alternative removal options that were considered and rejected and the basis for that rejection.

Related to Removal action work plan

  • Remedial Action Plan has the meaning provided in Section 3.9(c)(ii).

  • Demolition works means any physical activity to tear down or break up a structure (or part thereof) or surface, or the like, and includes the loading of demolition waste and the unloading of plant or machinery.

  • Remediation Plan means a report identifying:

  • Excavation work means the making of any man-made cavity, trench, pit or depression formed by cutting, digging or scooping;

  • demolition work means a method to dismantle, wreck, break, pull down or knock down of a structure or part thereof by way of manual labour, machinery, or the use of explosives;

  • Corrective Action Plan has the meaning set forth in Section II.A.2.

  • Work Plan means a plan that describes each individual activity to be conducted to complete eligible activities and the associated costs of each individual activity.

  • Remedial Design or “RD” shall mean those activities to be undertaken by SDs to develop final plans and specifications for the RA as stated in the SOW.

  • Remedial Action means all actions taken to (a) clean up, remove, remediate, contain, treat, monitor, assess, evaluate, or in any way address Hazardous Materials in the indoor or outdoor environment, (b) prevent or minimize a release or threatened release of Hazardous Materials so they do not migrate or endanger or threaten to endanger public health or welfare or the indoor or outdoor environment, (c) restore or reclaim natural resources or the environment, (d) perform any pre-remedial studies, investigations, or post-remedial operation and maintenance activities, or (e) conduct any other actions with respect to Hazardous Materials required by Environmental Laws.

  • Remediation waste means all solid and hazardous wastes, and all media (including groundwater, surface water, soils, and sediments) and debris that are managed for implementing cleanup.

  • construction work permit means a document issued in terms of regulation 3; "contractor" means an employer who performs construction work;

  • Corrective action means action taken to eliminate the cause of a potential or real non- conformity or other undesirable situation;

  • Construction Works means all works and things necessary to complete the Project in accordance with this Agreement;

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Annual Work Plan and Budget means the work plan and budget approved by the Bank and adopted by the Borrower in accordance with the provisions of Section I.C of Schedule 2 of this Agreement, as said work plan and budget may be modified from time to time with the written agreement of the Bank.

  • Phase 1 means the first implementation phase of this section, beginning June 1, 2018 and ending May 31, 2022.