Schematic Design Document definition

Schematic Design Document shall have the meaning as defined in Paragraph 3.9.5 of this Agreement.
Schematic Design Document shall have the meaning as defined in ARTICLE III.2.5 of this Agreement.

Examples of Schematic Design Document in a sentence

  • The validation of the revised Schematic Design Documents shall appear in the Design Development Documents to reflect the Schematic Design Document changes that bring the project back into compliance with the District’s Construction Budget.

  • The Architect/Engineer shall prepare from the approved Schematic Design Document the Preliminary Documents to fix and describe the size and character of the entire Project as to structural, mechanical, and electrical systems, materials and such other essentials as may be appropriate.

  • Within fourteen (14) Days after Construction Manager receives Design Development Documents, Construction Manager shall deliver, with supporting data, and meet with Owner Parties to discuss, its revised cost estimate incorporating the applicable Design Development Document information, and updating and refining, the applicable reconciled Schematic Design Document cost estimate (from Section 5.9 above).

  • Within twenty-one (21) Days after Construction Manager receives Design Development Documents, and based on the outcome of the cost estimating process in Section 5.5 above, Construction Manager shall meet with Owner Parties to deliver its revised scheduling, phasing, and constructability advice, analysis, and deliverables, updated from its applicable Schematic Design Document phase deliverables set forth in Section 5.9 above.

  • At appropriate times during preconstruction, including the Schematic Design Document phase and the Design Development Documents phase, Construction Manager shall discuss with Owner Parties its expected construction activities, division of Work, and efficient bidding‌ and awarding of Subcontracts.

  • Three copies of the Schematic Design Document shall be submitted to the Project Manager for review All 8 1/2" x 11” format documents shall be bound in a three ring binder with tabs dividing the program elements.

  • Section 2.22 Schematic Design Document Submission‌ 2.22.1 Design Concepts.

  • One hardcopy and one digital copy of the Schematic Design Document submittal shall be submitted to the Project Manager for review.

  • Based upon the approved program (and any revisions made thereto during the Schematic Design Phase), budget requirements and building site considerations, the PA/E shall prepare and submit for approval by the Board the Schematic Design Document Phase I, consisting of drawings and other documents as defined in the PA/E Handbook illustrating the scale and relationship of the Project components, along with a statement of probable construction cost based upon current area, volume or other unit costs.

  • Finally, the Debtors believe a single, consolidated list of the company’s thirty-five (35) largest unsecured, non-insider creditors will aid the Office of the U.S. Trustee in its efforts to communicate with these creditors.

Related to Schematic Design Document

  • Schematic Design Documents means drawings prepared by the Trade Contractor that illustrate the scale and relationship of the various Trade Contractor Work components and which also contain square footage and volume calculations for the building interior spaces, building exterior spaces, and major architectural and interior finishes.

  • Design Documents means, collectively and as applicable, the Conceptual Design Documents, Schematic Design Documents, the Design Development Documents and the Construction Documents prepared by the Trade Contractor.

  • Design Documentation means all schematics and test, assembly and package documentation relating to the Product, including all design, specification and assembly documentation and data files for Materials, which is necessary for the production, manufacture, qualification, testing and delivery of the Product to be attached as Exhibit A.

  • MSAA Indicator Technical Specifications document means, as the context requires, either or both of the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Indicator Technical Specifications November 5, 2018 Version 1.3” and the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Target and Corridor-Setting Guidelines” as they may be amended or replaced from time to time;

  • Design Criteria Package means concise, performance-oriented drawings or specifications for a public construction project. The purpose of the Design Criteria Package is to furnish sufficient information to permit Design-Build Firms to prepare a bid or a response to the District’s Request for Proposals, or to permit the District to enter into a negotiated Design- Build Contract. The Design Criteria Package must specify performance- based criteria for the public construction project, including the legal description of the site, survey information concerning the site, interior space requirements, material quality standards, schematic layouts and conceptual design criteria of the project, cost or budget estimates, design and construction schedules, site development requirements, provisions for utilities, stormwater retention and disposal, and parking requirements applicable to the project. Design Criteria Packages shall require firms to submit information regarding the qualifications, availability, and past work of the firms, including the partners and members thereof.

  • Design Manual means the MOHLTC design manual or manuals in effect and applicable to the development, upgrade, retrofit, renovation or redevelopment of the Home or Beds subject to this Agreement.

  • Design-Build Agreement means the design and construction agreement between Project Co and the Design-Builder, a certified copy of which has been delivered by Project Co to the Authority, as amended, supplemented or replaced from time to time in accordance with this Agreement;

  • technical specification means, with respect to any Software, the document setting forth the technical specifications for such Software and included in the Statement of Work.

  • Technical Specifications means the detailed requirements for the Work furnished by the Architect and set forth in Book 3 of the Contract Documents.

  • Specification Schedule means the Schedule containing details of the Specification.

  • TENDER SPECIFICATIONS means the Scope of Work, Special Instructions / Conditions, Technical specifications/requirement , Appendices, Site Information and drawings pertaining to the work and any other relevant reference in the Tender Document for which the Bidder are required to submit their offer.

  • Acceptance Test Document means a document, which defines procedures for testing the functioning of installed system. The document will be finalized with the contractor within 7 days of issuance of the Letter of Award.

  • TENDER SPECIFICATION means “Specific conditions, technical specifications, appendices, site information and drawing pertaining to the work in which the tenderers are required to submit their offer. Individual specification number will be assigned to each tender specification.

  • Design Criteria means the design criteria set out in the Ministry’s publication “Design Criteria for Sanitary Sewers, Storm Sewers and Forcemains for Alterations Authorized under Environmental Compliance Approval”, (as amended from time to time).

  • Standard Specifications means a compilation in book form of specifica- tions approved for general application and repetitive use;

  • Design Development Documents means the Drawings, Specifications and other documents prepared by the Trade Contractor that establish and describe the size and character of the Trade Contractor Work as to architectural, civil, structural, mechanical and electrical systems, graphics and signage, and other elements, and which include typical construction details, equipment layouts and specifications that identify major materials and systems.

  • Application Software means Software formulated to perform specific business or technical functions and interface with the business or technical users of the System and is identified as such in Appendix4 of the Contract Agreement and such other Software as the parties may agree in writing to be Application Software.

  • E-Auction Process Information Document means this document including all the appendices hereto, for the purposes of setting out the process for submission of a bid and selection of Successful Bid in accordance with the provisions of the IBC and shall include all supplements, modifications, amendments, alterations or clarifications thereto issued in accordance with the terms hereof.

  • piece-work means any work the pay for which is estimated by the amount of work performed irrespective of the time occupied in its performance;

  • Scope of Work means the description of Services and Deliverables specified in the Contract and as may be amended.

  • Functional Specifications means the descriptions of features and functions of the Application as expressly set forth in Quote.

  • Construction Documents means the plans, specifications, approved change orders, revisions, addenda and other information approved by the City, which set forth in detail the Work to be performed for a construction Project.

  • layout plan means a plan of the project depicting the division or proposed division of land into plots, roads, open spaces, amenities, etc. and other details as may be necessary;

  • Class specification means a written description of a class setting forth factors and conditions which are essential characteristics of positions in that class.

  • Design flow means the average annual flow or average daily flow specified in an approved facilities plan or approved plans and specifications, the flow specified in a WPDES permit, or the flow required to meet performance standards.

  • Project Schedule means a document that, with respect to each Phase of the Project, identifies, coordinates and integrates the anticipated design and construction schedules, the Contracting Authority’s and Owner's responsibilities, government authority reviews and other activities as are necessary for the timely completion of the Work.