Schooner Cove Public Open Space Phasing Plan definition

Schooner Cove Public Open Space Phasing Plan means that certain plan that identifies publicly accessible open space transfers of interest, and pathway and trail improvements, to each Phase of the development of Schooner Cove Land, that is attached at Schedule “I”;

Related to Schooner Cove Public Open Space Phasing Plan

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Basic Comprehensive User Guide means the Ministry document titled Basic Comprehensive Certificates of Approval (Air) User Guide” dated April 2004 as amended.

  • Construction Completion Date means the date by which the overall development of the Project is completed in accordance with the provisions of this Agreement and when the Construction Completion Certificate is issued by the Independent Engineer as per Article 14.1.

  • Construction, panel, and floor covering adhesive means any one-component adhesive that is designed exclusively for the installation, remodeling, maintenance, or repair of:

  • Improvement completion assurance means a surety bond, letter of credit,

  • Construction Commencement Date means the date set out in the Addendum, if applicable, by which you must commence construction of the Hotel. For the Hotel to be considered under construction, youmust have begun to pour concrete foundations for the Hotel or otherwise satisfied any site-specific criteria for “under construction” set out in the Addendum.

  • Adopt a comprehensive land use plan means to enact a new

  • main phase employment and support allowance means an employment and support allowance where the calculation of the amount payable in respect of the applicant includes a component under section 2(1)(b) or 4(2)(b) of the Welfare Reform Act 2007 except in Part 1 of Schedule 1;

  • Phase 1 means the first implementation phase of this section, beginning June 1, 2018 and ending May 31, 2022.

  • Pre-Construction Phase Services means the participation, documentation and execution of Contractor’s Pre-Construction Phase deliverables as required by this Agreement and further defined in Article 5.

  • Tenant Improvements Defined in Exhibit B, if any.

  • Construction Start Date means the later to occur of the date on which Seller delivers to Buyer (a) a copy of the Notice to Proceed that Seller has delivered to the EPC Contractor for the Project, and (b) a written Certification substantially in the form attached hereto as Appendix IV-1.

  • Building Plans mean the general building plans and specifications in respect of the Development or in respect of any part or parts of the Development prepared by the Authorized Person and approved by the Building Authority and include any approved amendments thereto;

  • Construction Completion means physical construction of a cleanup action component is complete.

  • Tenant Improvement Work means the construction of the Tenant Improvements, together with any related work (including demolition) that is necessary to construct the Tenant Improvements.

  • Public work means public work as defined in section 2 of P.L.1963, c.150 (C. 34:11-56.26) and which is subject to the provisions of P.L.1963, c.150 (C. 34:11-56.25 et seq.). Public work shall not include the provision of goods or products.

  • Improvement warranty period means a period:

  • Commissioning Period means, with respect to each Subproject, the period commencing upon the first delivery of Feed Gas to the Subproject in accordance with Sections 4.8 and 11.1 of the Agreement continuing through achievement of RFSU, commissioning, Start Up, Performance Testing and achievement of Substantial Completion for such Subproject.

  • Airport Ground Support Equipment means vehicles and equipment used at an airport to service aircraft between flights.

  • Municipal Separate Storm Sewer System Management Program means a management program covering the duration of a state permit for a municipal separate storm sewer system that includes a comprehensive planning process that involves public participation and intergovernmental coordination, to reduce the discharge of pollutants to the maximum extent practicable, to protect water quality, and to satisfy the appropriate water quality requirements of the CWA and regulations, and this article and its attendant regulations, using management practices, control techniques, and system, design, and engineering methods, and such other provisions that are appropriate.

  • Modular building manufacturer means a person or corporation who owns or operates a

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Services Commencement Date means the date delivery of the Services shall commence as specified in the Key Provisions. If no date is specified in the Key Provisions this date shall be the Commencement Date;

  • Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.

  • Construction Period means the period commencing from the Appointed Date and ending on the date of the Completion Certificate;

  • Application Review Start Date means the later date of either the date on which the District issues its written notice that the Applicant has submitted a completed Application or the date on which the Comptroller issues its written notice that the Applicant has submitted a completed Application and as further identified in Section 2.3.A of this Agreement.