Examples of Shoulder Peak in a sentence
Transmission Period Repeat Fee as percentage of Fee Narrative Repeat as percentage of Fee Peak (18.00 – 22.30) First peak repeat – 75% Second and subsequent - 100% 56.25% / 75% Shoulder Peak (22.30- 23.30) 40% 30% Daytime (09.25-18.00) 25% 18.75% Night-time (23.30- 09.25) 10% 7.5% If a repeat is transmitted over more than one time band as described above, then the higher value percentage payment shall apply.
Shoulder Peak: 3 of 3 units online • West Marinette Generation i.
Summer Shoulder Peak Load (yyyySSH) — is defined as 70% to 80% of summer peak load conditions.
Calls overlapping these periods will be rated as specified in paragraph C.2.c. Shoulder Peak discount does not apply to Business Operator Assisted Band C Usage.
Discount period rates are applicable as follows:- Shoulder Peak for calls between 8:00 a.m. and /1/9:00 a.m., 11:00 a.m. and /1/2:00 p.m., 8:00 p.m. and /1/9:00 p.m., Monday through Friday- Off Peak for calls between 9:00 p.m. and /1/8:00 a.m., Monday through Friday, and 9:00 p.m. Friday through /1/8:00 a.m. Monday.
MONTHLY RATE:Monthly Service Charge:$13.00 Plus On Peak Charge: 20.079 cents per on peak KWH Plus Shoulder Peak Charge:9.524 cents per shoulder KWH Plus Off Peak Charge all other KWH: First 1000 KWH:5.292 cents per KWH Next 2000 KWH:4.659 cents per KWH Remaining KWH:4.237 cents per KWH On peak KWH's are the KWH's used in excess of the allowed maximum on peak KWH's in the five summer months of May, June, July, August, and September between 5:00 p.m. and 7:00 p.m. on weekdays.
Corresponding to the anticipated Retirement of Presque Isle Units 5, 6, 7, 8, & 9 the following power system analysis models were used for the study: 2015 Summer Peak 2015 Shoulder Peak 2015 Shoulder Peak with future Mackinac VSC (flow control device)The Attachment Y study models were created from the MTEP13 SCED reliability analysis models.
MONTHLY RATE:Monthly Service Charge:$12.00 Plus On Peak Charge:20.417 cents per on peak KWH Plus Shoulder Peak Charge:9.862 cents per shoulder KWH Plus Off Peak Charge:4.849 cents per all other KWH On peak KWH's are the KWH's used in excess of the allowed maximum on peak KWH's in the five summer months of May, June, July, August, and September between 5:00 p.m. and 7:00 p.m. on weekdays.
For storage, a 100% Summer Peak dispatch and 100% Shoulder Peak dispatch (and 100% Shoulder Peak charging) is assumed.In these examples, the study cases for combustion turbines and combined cycle plants contain implicit assumptions regarding the expected economic behavior of those generators during certain system conditions.
Summer Peak 10 MW hybrid (solar, wind, and storage) Summer Peak and Shoulder Peak 8.3.1.2Transmission Owner ScreeningWhen an EDC approaches a TO with information on potential DER Transmission System impacts, the TO shall perform a screen for DER Net Injections exceeding one megawatt (1 MW) using the screening assumptions outlined in Section 8.2.1.1. DER Net Injection screening shall use the applicable model(s) load and assume full injection of all DER at the DER Substation.