Examples of Solar collector system in a sentence
The time at which a Large-Scale Solar collector system shall be deemed abandoned may be extended by the Planning Board for one additional period of one year, provided the system owner presents to the Planning Board a viable plan outlining the steps and schedules for placing the system in service or back in service, at no less than eighty percent (80%) of its rated capacity, within the time period of the extension.
Removal of a Large-Scale Solar collector system shall be in accordance with a decommissioning plan approved by the Planning Board.
The Applicant for a special use permit for a Large-Scale Solar collector system shall be responsible for reimbursing the Town for the cost of the engineering review by the Town Designated Engineer.
Extenuating circumstances as to why the Large-Scale Solar collector system has not been operating or why construction has not been completed may be considered by the Planning Board in determining whether to grant an extension.
If a Large-Scale or Small-Scale Solar collector system owner and/or landowner fails to decommission and remove an abandoned facility in accordance with the requirements of this Section, the Town may enter upon the property to decommission and remove the system at the cost of the landowner.
Any Large-Scale Solar collector system or Small-Scale Solar collection system which has been abandoned shall be decommissioned and removed.
Solar collector system installations for which a valid building permit has been properly issued, or for which installation has commenced before the effective date of this section, shall not be required to meet the requirements of this section, except in accordance with Subsection D, Safety, found here in this section.
Solar collector system installations for which a valid building permit has been properly issued, or for which installation has commenced before the effective date of this section, shall not be required to meet the requirements of this section, except in accordance with Section V.
Flat Plate Collectors (FPC) with liquid as the working fluid 3300 3 Flat Plate Collectors with air as the working fluid 24004 Solar collector system for direct heating applications 3600 5 Concentrator with manual tracking 2100 6 Non- imaging concentrators 3600 7 Concentrator with single axis tracking 5400 8 Concentrator with double axis tracking 60001.
Solar collector system installations for which a valid building permit has been properly issued, or for which installation has commenced before the effective date of this section, shall not be required to meet the requirements of this section, except in accordance with 111-2Subsection D, Safety, found herein this section.