Examples of Solar Ready in a sentence
Projects must meet the Energy Trust of Oregon’s Solar Ready Commercial Design and Construction Requirements.
All new construction shall be developed to be Solar- Ready, allowing for the immediate installation of solar voltaic units or provisions of building systems to allow future solar installation.
A Solar Feasibility Study must be completed by a qualified professional per the guidelines of the Energy Trust of Oregon and, if a solar energy system is determined to be feasible per those guidelines, the project must be constructed to include either a solar energy system or be Solar Ready construction.
For an overview of the multiple options for siting PV and buildings in the same footprint, see the Solar Ready Buildings Planning Guide, NREL, 2009.
Procedures for verifying compliance are described in Reference Residential Appendix RA4.6. The installer is required to fill out this form for all newly installed Photovoltaic Systems (PV) when the PV system is being used to claim an exception to the Solar Ready requirements of Section 110.10, specifically Exception 1 to Section 110.10(b)1A for single family residences or Exception 1 to Section 110.10(b)1B for low‐rise multifamily buildings.