Specific Requirement definition

Specific Requirement has the meaning given to it in paragraph 3.1.2 of Schedule 5 (Approval Process for New Projects);
Specific Requirement means the specific service requirements set out in Column 2 of each paragraph of the Service Specification;

Examples of Specific Requirement in a sentence

  • Cover Page [Name of Offeror][Address of Offeror][Phone Number and Email Address of Offeror] DUNS #: [DUNS #]CAGE code: [CAGE code] [Title of Enhanced White Paper] [Specific Requirement addressed in Enhanced White Paper] [Offeror] certifies that, if selected for award, the Offeror will abide by the terms and conditions of the MTEC Base Agreement.

  • All documents and/or revisions of documents referred to by the Purchaser of the CSR- Customer Specific Requirement - type, must be sent to the Supplier by email.

  • Specific Requirement for Claims-Made Form: Required period of coverage will be determined by the following formula: Continuous coverage for life of the contract, plus one (1) year (to provide coverage for the warranty period), and an extended discovery period for a minimum of five (5) years which shall begin at the end of the warranty period.

  • SACC Manual clause G1005C (2016-01-28), Insurance – No Specific Requirement.

  • A for- mal declaration is not necessary.3 Finally, a colony is considered disolved once control by a European power vanished.4 According to this definition, mandated territories, which 2 COLDAT remains incomplete in so far as coloni- zation of certain territories are not mentioned in any of the sources.

  • Outstanding business loans registered modest growth due to slower loans disbursed for working capital purposes.

  • Product Specific Requirement Status and Registrant's Response Forms (Form B inserts) and Instructions 94Attachment 4.

  • As mentioned above, the proposed parking lot does not meet the Specific Requirement of 6.2.5.k.2.b that specifies “the minimum side parking setback equals 2 times the minimum side setback required for the detached house.” The side setback requirement for a detached house in the RE-1 Zone is 17 feet and therefore, the minimum side parking setback for the proposed Conditional Use is 34 feet.

  • SACC Manual clause G1005C (2016-01-28), Insurance - No Specific Requirement ORInsurance - Specific Requirements(Note to Bidders: the selected proposal(s) may necessitate specific insurance requirements in lieu of or in addition to G1005C.

  • SACC Manual clause G1005C (2016-01-28), Insurance - No Specific Requirement.

Related to Specific Requirement

  • Program Requirements means certain minimum program entry requirements as well as ongoing program requirements, to be fulfilled by Partner, some of which are general PartnerEdge requirements, some of which are specific for the “Sell Engagement” and some of which are specific for the different “Cloud” Product Families, including, without limitation payment of the Program Fee(s), meeting certain minimum annual revenue requirements, upholding a Sell Authorization for at least one “Cloud” Product Family and other requirements as set out in detail in the PartnerEdge Program Guide and the RSPI.

  • Reporting Requirement By January 31, 2017, the District will provide for OCR’s review and approval the Web Accessibility Policy drafted consistent with Item 1.

  • Design requirements means the written description of the infrastructure facility to be procured pursuant to this article, including:

  • Minimum Requirements means the minimum requirements for available commercial structures. The minimum requirements may be found at this link: https://portlandgeneral.com/energy- choices/renewable-power/green-future-impact The minimum requirements may be updated from time to time to reflect PGE’s criteria from its latest Commission accepted renewable request for proposals.

  • Rebate Requirement means the amount of arbitrage profits earned from the investment of gross proceeds of Tax-exempt Bonds in nonpurpose investments described in Section 148(f)(2) of the Code and defined as “Rebate Amount” in Section 1.148-3 of the Treasury Regulations, which is payable to the United States at the times and in the amounts specified in such provisions.

  • Minimum Hourly Work Requirement means the work hours over a given time period that are required of you by your Employer in order to be eligible for coverage. Your Minimum Hourly Work Requirement is specified in the Schedule of Benefits.

  • MREL Requirement means the minimum requirement for own funds and eligible liabilities which is or, as the case may be, will be applicable to the Issuer;

  • Applicable Technical Requirements and Standards means those certain technical requirements and standards applicable to interconnections of generation and/or transmission facilities with the facilities of an Interconnected Transmission Owner or, as the case may be and to the extent applicable, of an Electric Distributor, as published by Transmission Provider in a PJM Manual provided, however, that, with respect to any generation facilities with maximum generating capacity of 2 MW or less (synchronous) or 5 MW or less (inverter-based) for which the Interconnection Customer executes a Construction Service Agreement or Interconnection Service Agreement on or after March 19, 2005, “Applicable Technical Requirements and Standards” shall refer to the “PJM Small Generator Interconnection Applicable Technical Requirements and Standards.” All Applicable Technical Requirements and Standards shall be publicly available through postings on Transmission Provider’s internet website.

  • performance requirement means a requirement that:

  • Technical Requirements means the Technical Requirements in Section VII of the tendering documents.

  • Default Requirement means the amount specified as being applicable to the Reference Entity in the Standard, or its equivalent in the relevant Obligation Currency (or, if no such amount is specified, U.S.$ 10,000,000 or its equivalent in the relevant Obligation Currency) in either case, as of the occurrence of the relevant Credit Event.

  • Applicable requirement means all of the following as they apply to emission units in a source requiring an air quality operating permit (including requirements that have been promulgated or approved by the Department or the administrator through rule making at the time of issuance of the air quality operating permit, but have future-effective compliance dates, provided that such requirements apply to sources covered under the operating permit):

  • Pretreatment requirements means any substantive or procedural requirement related to pretreatment, other than a pretreatment standard, imposed on an industrial user.

  • Monitoring Requirements Schedule means the Schedule containing details of the monitoring arrangements.

  • Minimum Balance Requirements The minimum balance to open the account is $5.00. If the balance falls below $5 at any time, the account may be closed. See Balance Computation Method above. Fees and Charges; Other Requirements: See our Schedule of Fees at xxxxxxx.xxx/xxxx. Dividends: See Disclosures Concerning Dividends above. Current rates are disclosed on the Credit Union’s website.

  • PJM Region Reliability Requirement means, for purposes of the Base Residual Auction, the Forecast Pool Requirement multiplied by the Preliminary PJM Region Peak Load Forecast, less the sum of all Preliminary Unforced Capacity Obligations of FRR Entities in the PJM Region; and, for purposes of the Incremental Auctions, the Forecast Pool Requirement multiplied by the updated PJM Region Peak Load Forecast, less the sum of all updated Unforced Capacity Obligations of FRR Entities in the PJM Region.

  • Minimum Extended Summer Resource Requirement means, for Delivery Years through May 31, 2017, the minimum amount of capacity that PJM will seek to procure from Extended Summer Demand Resources and Annual Resources for the PJM Region and for each Locational Deliverability Area for which the Office of the Interconnection is required under Tariff, Attachment DD, section 5.10(a) to establish a separate VRR Curve for such Delivery Year. For the PJM Region, the Minimum Extended Summer Resource Requirement shall be equal to the RTO Reliability Requirement minus [the Limited Demand Resource Reliability Target for the PJM Region in Unforced Capacity]. For an LDA, the Minimum Extended Summer Resource Requirement shall be equal to the LDA Reliability Requirement minus [the LDA CETL] minus [the Limited Demand Resource Reliability Target for such LDA in Unforced Capacity]. The LDA CETL may be adjusted pro rata for the amount of load served under the FRR Alternative.

  • technical specification means a document that prescribes technical requirements to be fulfilled by a product, process or service;

  • Maintenance Requirements shall have the meaning set forth in Clause 14.2;

  • Web Site Accessibility Standards/Specifications means standards contained in Title 1 Texas Administrative Code Chapter 206.

  • The Specification means the Specification annexed to or issued with G.T.C.C. and shall include the schedules & drawings attached thereto as well as all samples and pattern, if any.

  • health and safety specification means a site, activity or project specific document prepared by the client pertaining to all health and safety requirements related to construction work;

  • Specifications and Standards means the specifications and standards relating to the quality, quantity, capacity and other requirements for the Project Highway, as set forth in Schedule-D, and any modifications thereof, or additions thereto, as included in the design and engineering for the Project Highway submitted by the Contractor to, and expressly approved by, the Authority;

  • Compliance schedule means a schedule of events, by date, which will result in compliance with these regulations.

  • Periodic Billing Requirement means, for any Remittance Period, the aggregate amount of Charges calculated by the Servicer as necessary to be billed during such period in order to collect the Periodic Payment Requirement on a timely basis.

  • Project Requirements means the statement included in the Request for Proposal detailing the technical and other requirements of Canada which are to be met by the successful Bidder, and which are to be addressed in the Bid;