Residential construction means construction on single-family or two-family dwellings occupied or used, or intended to be occupied or used, primarily for residential purposes, and includes real property pursuant to chapter 499B.
Caribbean Basin country construction material means a construction material that—
New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.
Uniform application means the current version of the national association of insurance commissioners uniform application for resident and nonresident insurance producer licensing.
WTO GPA country construction material means a construction material that—
Building construction means any physical activity on the site involved in the erection of a structure, cladding, external finish, formwork, fixture, fitting of service installation and the unloading of plant, machinery, materials or the like.
Admin Fax Ext Admin Email: XXXXX@XXXXXXX.XXX Tech ID: 5372811-ERL Tech Name: EXAMPLE REGISTRAR TECHNICAL Tech Organization: EXAMPLE REGISTRAR LLC Tech Street: 000 XXXXXXX XXXXXX Xxxx Xxxx: ANYTOWN Tech State/Province: AP Tech Postal Code: A1A1A1 Tech Country: EX Tech Phone: +1.1235551234 Tech Phone Ext: 1234 Tech Fax: +1.5555551213 Tech Fax Ext: 93 Tech Email: XXXXX@XXXXXXX.XXX Name Server: NS01.EXAMPLEREGISTRAR.TLD Name Server: NS02.EXAMPLEREGISTRAR.TLD DNSSEC: signedDelegation DNSSEC: unsigned >>> Last update of WHOIS database: 2009-05-29T20:15:00Z <<< Query format: whois “registrar Example Registrar, Inc.” Response format: Registrar Name: Example Registrar, Inc. Street: 0000 Xxxxxxxxx Xxx City: Marina del Rey State/Province: CA Postal Code: 90292 Country: US Phone Number: +1.0000000000 Fax Number: +1.3105551213 Email: xxxxxxxxx@xxxxxxx.xxx WHOIS Server: whois.example-registrar.tld Referral URL: xxxx://xxx.xxxxxxx-xxxxxxxxx.xxx Admin Contact: Xxx Registrar Phone Number: +1.3105551213 Fax Number: +1.3105551213 Email: xxxxxxxxxxxx@xxxxxxx-xxxxxxxxx.xxx Admin Contact: Xxxx Registrar Phone Number: +1.3105551214 Fax Number: +1.3105551213 Email: xxxxxxxxxxxxx@xxxxxxx-xxxxxxxxx.xxx Technical Contact: Xxxx Geek Phone Number: +1.3105551215 Fax Number: +1.3105551216 Email: xxxxxxxx@xxxxxxx-xxxxxxxxx.xxx >>> Last update of WHOIS database: 2009-05-29T20:15:00Z <<< Query format: whois “NS1.EXAMPLE.TLD”, whois “nameserver (nameserver name)”, or whois “nameserver (IP Address)” Server Name: NS1.EXAMPLE.TLD IP Address: 192.0.2.123 IP Address: 2001:0DB8::1 Registrar: Example Registrar, Inc. WHOIS Server: whois.example-registrar.tld Referral URL: xxxx://xxx.xxxxxxx-xxxxxxxxx.xxx >>> Last update of WHOIS database: 2009-05-29T20:15:00Z <<< The format of the following data fields: domain status, individual and organizational names, xxxxxxx, xxxxxx, xxxx, xxxxx/xxxxxxxx, postal code, country, telephone and fax numbers (the extension will be provided as a separate field as shown above), email addresses, date and times should conform to the mappings specified in EPP RFCs 5730-5734 so that the display of this information (or values return in WHOIS responses) can be uniformly processed and understood. In order to be compatible with ICANN’s common interface for WHOIS (InterNIC), WHOIS output shall be in the format outline above.
Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.
Commenced Construction means (a) all of the following site preparation work is completed: ingress and egress routes exist; the site on which the Project will be located is cleared and graded; there is power service to the site; footings are prepared; and foundations have been poured consistent with purchased equipment specifications and project design; or (b) the following financial commitments have been made: (i) (A) an engineering, procurement, and construction contract (“EPC”) has been executed by all parties and is effective; or (B) contracts (collectively, “EPC Equivalents”) for all of the following have been executed by all parties and is effective: (1) project engineering, (2) procurement of all major equipment, and (3) construction of the Project, and (ii) the cumulative payments made by the Developer under the EPC or EPC Equivalents to the counterparties to those respective agreements is equal to at least thirty (30) percent of the total costs of the EPC or EPC Equivalents.
Means and Methods of Construction means the labor, materials, temporary structures, tools, plant, and construction equipment, and the manner and time of their use, necessary to accomplish the result intended by this Contract.
Construction Zone shall have the meaning set forth in Clause 8.3 (i);
Interconnection Construction Service Agreement means the agreement entered into by an Interconnection Customer, Interconnected Transmission Owner and the Transmission Provider pursuant to Tariff, Part VI, Subpart B and in the form set forth in Tariff, Attachment P, relating to construction of Attachment Facilities, Network Upgrades, and/or Local Upgrades and coordination of the construction and interconnection of an associated Customer Facility. A separate Interconnection Construction Service Agreement will be executed with each Transmission Owner that is responsible for construction of any Attachment Facilities, Network Upgrades, or Local Upgrades associated with interconnection of a Customer Facility.
State Orig Term Prod Code: Sr Orig Amount: P&&I: Prop Type: Sevicer Loan Address: Rem Term: Occp Code: Appr Value: Note Date: Debt Cr. CITY: Zip Code: Purpose: Curr CLTV: Prin Maturity Lien 3390919 Xxxx CA 181 6 $250,706.00 $92,000.00 $1,009.85 0 000000000000000 00 Xxxxxxx Xxxxx 180 1 $365,000.00 04/05/2000 44 683 Trabuco Canyon 92679 02 10.38 94 $91,785.57 05/01/2015 2 3391024 Xxxxx CA 181 6 $207,000.00 $55,000.00 $664.52 1 000000000000000 0000 Xxxxx Xxxxxxx Xxxx 179 1 $230,000.00 03/30/2000 27 730 Turlock 95380 02 12.13 114 $55,000.00 04/25/2015 2 3391272 Xxxxxxxx NH 181 6 $332,028.00 $50,000.00 $695.52 1 125990000391272 00 Xxxxxxxxxxx Xxxxx 180 1 $356,000.00 04/06/2000 50 662 Bedford 03110 02 14.88 108 $50,000.00 05/01/2015 2 3391924 Xxxxxx WA 301 8 $187,117.00 $64,300.00 $761.74 1 153990000391924 00000 XxxxxXxxx 000xx Xxxxx 300 1 $233,000.00 04/05/2000 34 664 Auburn 98092 02 13.75 108 $64,275.03 05/01/2025 2 3392498 Xxxxxx CA 181 6 $237,188.00 $100,000.00 $1,172.96 RFC0 106990000392498 00000 Xxxxx Xxxxx 179 1 $355,000.00 03/27/2000 42 704 Xxxxxxxxx Ranch 91381 02 11.58 95 $99,791.62 04/01/2015 2 3392701 Xxxxxxx CA 181 7 $252,000.00 $63,000.00 $641.98 0 106990000392701 000 Xxxxx Xxxxxxxxx Xxxxxx 180 1 $315,000.00 04/06/2000 41 741 Redondo Beach 90277 01 11.88 100 $63,000.00 05/01/2015 2 3392753 XXXXXXXXX UT 301 8 $195,221.00 $74,750.00 $857.16 1 149990000392753 0000 XXXX XXX XXXX XXXXX 300 1 $216,000.00 04/14/2000 42 703 SOUTH JORDAN 84095 02 13.25 125 $74,750.00 05/01/2025 2 3392757 FORCE CA 301 8 $208,250.00 $45,900.00 $587.90 1 106990000392757 0000 XXXXXXXXXX XXXXX 300 1 $245,000.00 04/17/2000 50 677 GARDEN GROVE 92841 02 15 125 $45,900.00 05/01/2025 2 3392943 XXXXXXXXX VA 240 9 $238,000.00 $48,000.00 $553.83 0 000000000000000 1 XXXXX COURT 239 1 $251,100.00 04/01/2000 45 741 FREDRICKSBURG 22406 02 12.75 114 $47,956.17 04/10/2020 2 3394792 Mc Xxxxxx CA 241 9 $198,900.00 $65,000.00 $749.98 1 101990000394792 00000 Xxxxxxxx Xxxxxx 240 1 $234,000.00 04/05/2000 43 721 Whittier 90603 02 12.75 113 $64,940.64 05/01/2020 2 3395237 Xxxxxxx VA 180 6 $212,868.00 $39,500.00 $499.52 0 151990000395237 0000 Xxxxx Xxxxx Xxxxx 179 1 $226,000.00 04/20/2000 46 727 Manassas 20110 02 12.99 112 $39,428.07 04/25/2015 2 3395439 Xxxxxxxxxxxxx OK 300 8 $45,000.00 $18,800.00 $249.95 1 140990000395439 Xx 0 Xxx 000 000 0 $52,000.00 05/05/2000 50 678 Salina 74365 02 15.63 123 $18,800.00 05/11/2025 2 3396522 Xxxxxxxxx CA 181 7 $233,200.00 $43,700.00 $399.74 1 106990000396522 0000 Xxxxxxx Xxxxxx 180 1 $291,500.00 04/11/2000 38 771 Simi Valley 93065 01 10.5 95 $43,700.00 05/01/2015 2
Specifications and Standards means the specifications and standards relating to the quality, quantity, capacity and other requirements for the Project Highway, as set forth in Schedule-D, and any modifications thereof, or additions thereto, as included in the design and engineering for the Project Highway submitted by the Contractor to, and expressly approved by, the Authority;
Existing construction means any structure for which the "start of construction" commenced before the effective date of the initial floodplain management code or ordinance adopted by the community as a basis for that community's participation in the NFIP.
State Grid Code means the Grid Code specified by the CERC under Clause (h) of Sub-section (1) of Section 79 of the Electricity Act, as amended from time to time, and/or the State Grid Code as specified by the concerned State Commission, referred under Clause (h) of Sub- section (1) of Section 86 of the Electricity Xxx 0000, as applicable;
Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.
Regulations of the U.S. Department of Transportation means the regulations in 49 CFR Parts 100-189.
Free Trade Agreement country construction material means a construction material that—
Applicable Technical Requirements and Standards means those certain technical requirements and standards applicable to interconnections of generation and/or transmission facilities with the facilities of an Interconnected Transmission Owner or, as the case may be and to the extent applicable, of an Electric Distributor, as published by Transmission Provider in a PJM Manual provided, however, that, with respect to any generation facilities with maximum generating capacity of 2 MW or less (synchronous) or 5 MW or less (inverter-based) for which the Interconnection Customer executes a Construction Service Agreement or Interconnection Service Agreement on or after March 19, 2005, “Applicable Technical Requirements and Standards” shall refer to the “PJM Small Generator Interconnection Applicable Technical Requirements and Standards.” All Applicable Technical Requirements and Standards shall be publicly available through postings on Transmission Provider’s internet website.
Original construction ’ shall mean the first or initial construction
Contract Amendment means a written document signed by the Procurement Officer that is issued for the purpose of making changes in the Contract.
Start of construction means the date the development permit was issued, provided the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of the structure such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation. (Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of buildings appurtenant to the permitted structure, such as garages or sheds not occupied as dwelling units or part of the main structure. (NOTE: accessory structures are NOT exempt from any ordinance requirements) For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.
Commencement of Construction means the commencement of construction of foundation components or elements (such as footings, rafts or piles) for the home.
Uniform Network Code means the uniform network code as defined in Standard Special Condition A11(6) of National Grid’s transporters licence, as such code may be amended from time to time in accordance with the terms thereof.
AT&T-12STATE means the AT&T owned ILEC(s) doing business in Arkansas, California, Illinois, Indiana, Kansas, Michigan, Missouri, Nevada, Ohio, Oklahoma, Texas and Wisconsin.