Restoration means the repair and restoration of the Property after a Casualty or Condemnation as nearly as possible to the condition the Property was in immediately prior to such Casualty or Condemnation, with such alterations as may be reasonably approved by Lender.
Restoration Plan means all technical and organisational measures necessary for the restoration of the system back to normal state;
Restoration Threshold means an amount equal to 5% of the outstanding principal amount of the Loan.
Period of restoration means the period of time that:
Restoration Retainage as used in this Subsection 7.4(b) shall mean an amount equal to 10% of the costs actually incurred for work in place as part of the Restoration, as certified by the Casualty Consultant, until such time as the Casualty Consultant certifies to Lender that Net Proceeds representing 50% of the required Restoration have been disbursed. There shall be no Restoration Retainage with respect to costs actually incurred by Borrower for work in place in completing the last 50% of the required Restoration. The Restoration Retainage shall in no event, and notwithstanding anything to the contrary set forth above in this Subsection 7.4(b), be less than the amount actually held back by Borrower from contractors, subcontractors and materialmen engaged in the Restoration. The Restoration Retainage shall not be released until the Casualty Consultant certifies to Lender that the Restoration has been completed in accordance with the provisions of this Subsection 7.4(b) and that all approvals necessary for the re-occupancy and use of the Property have been obtained from all appropriate governmental and quasi-governmental authorities, and Lender receives evidence satisfactory to Lender that the costs of the Restoration have been paid in full or will be paid in full out of the Restoration Retainage, provided, however, that Lender will release the portion of the Restoration Retainage being held with respect to any contractor, subcontractor or materialman engaged in the Restoration as of the date upon which the Casualty Consultant certifies to Lender that the contractor, subcontractor or materialman has satisfactorily completed all work and has supplied all materials in accordance with the provisions of the contractor’s, subcontractor’s or materialman’s contract, and the contractor, subcontractor or materialman delivers the lien waivers and evidence of payment in full of all sums due to the contractor, subcontractor or materialman as may be reasonably requested by Lender or by the title company insuring the lien of the Security Instrument. If required by Lender, the release of any such portion of the Restoration Retainage shall be approved by the surety company, if any, which has issued a payment or performance bond with respect to the contractor, subcontractor or materialman.
Improvement Plan means the plan required by the Authority from the Supplier which shall detail how the Supplier will improve the provision of the Goods and/or Services pursuant to Clause 29.1.1 (Authority Remedies);
Improvement Fund means the Improvement Fund for General Obligation Temporary Notes, Series 2017-1 created pursuant to Section 501 hereof.
Remediation Plan means a report identifying:
Decommissioning means the measures taken at the end of a facility's operating life to assure the continued protection of the public from any residual radioactivity or other potential hazards present at a facility.
Adopt a comprehensive land use plan means to enact a new
Minimum Generation Emergency means an Emergency declared by the Office of the Interconnection in which the Office of the Interconnection anticipates requesting one or more generating resources to operate at or below Normal Minimum Generation, in order to manage, alleviate, or end the Emergency.
Continuous Improvement Plan means a plan for improving the provision of the Goods and/or Services and/or reducing the Charges produced by the Supplier pursuant to Framework Schedule 12 (Continuous Improvement and Benchmarking);
Access Compensation is the compensation paid by one Party to the other Party for the origination/termination of intraLATA toll calls to/from its End User. Access compensation is in accordance with the LEC’s tariffed access rates.
Infrastructure improvement means permanent infrastructure that is essential for the public health and safety or that:
Defined Contribution Plan A retirement plan which provides for an individual account for each participant and for benefits based solely on the amount contributed to the participant's account, and any income, expenses, gains and losses, and any forfeitures of accounts of other participants which the plan may allocate to such participant's account. The Advisory Committee must treat all defined contribution plans (whether or not terminated) maintained by the Employer as a single plan. Solely for purposes of the limitations of Part 2 of this Article III, the Advisory Committee will treat employee contributions made to a defined benefit plan maintained by the Employer as a separate defined contribution plan. The Advisory Committee also will treat as a defined contribution plan an individual medical account (as defined in Code Section 415(l)(2)) included as part of a defined benefit plan maintained by the Employer and, for taxable years ending after December 31, 1985, a welfare benefit fund under Code Section 419(e) maintained by the Employer to the extent there are post-retirement medical benefits allocated to the separate account of a key employee (as defined in Code Section 419A(d)(3)).
Infrastructure Improvements means a street, road, sidewalk, parking facility, pedestrian mall, alley, bridge, sewer, sewage treatment plant, property designed to reduce, eliminate, or prevent the spread of identified soil or groundwater contamination, drainage system, waterway, waterline, water storage facility, rail line, utility line or pipeline, transit-oriented development, transit-oriented property, or other similar or related structure or improvement, together with necessary easements for the structure or improvement, owned or used by a public agency or functionally connected to similar or supporting property owned or used by a public agency, or designed and dedicated to use by, for the benefit of, or for the protection of the health, welfare, or safety of the public generally, whether or not used by a single business entity, provided that any road, street, or bridge shall be continuously open to public access and that other property shall be located in public easements or rights-of-way and sized to accommodate reasonably foreseeable development of eligible property in adjoining areas. Infrastructure improvements also include 1 or more of the following whether publicly or privately owned or operated or located on public or private property:
Capital Improvement Project means the acquisition, construction, reconstruction, improvement, planning and equipping of roads and bridges, appurtenances to roads and bridges to enhance the safety of animal-drawn vehicles, pedestrians, and bicycles, wastewater treatment facilities, water supply systems, solid waste disposal facilities, and storm water and sanitary collection, storage and treatment facilities including real property, interests in real property, facilities, and equipment related or incidental to those facilities.
Maximum Generation Emergency Alert means an alert issued by the Office of the Interconnection to notify PJM Members, Transmission Owners, resource owners and operators, customers, and regulators that a Maximum Generation Emergency may be declared, for any Operating Day in either, as applicable, the Day-ahead Energy Market or the Real-time Energy Market, for all or any part of such Operating Day.
Remediation Period has the meaning specified in Section 8.2(a);
Defined Contribution Plan Fraction means a fraction, the numerator of which is the sum of the annual additions to a Participant’s accounts under all Defined Contribution Plans maintained by one or more Affiliated Companies, and the denominator of which is the sum of the lesser of (i) or (ii) for such Plan Year and for each prior Plan Year of Service with one or more Related Companies, where (i) is the product of 1.25 multiplied by the dollar limitation in effect under Section 415(c)(1)(A) of the Code for the Plan Year (determined without regard to Section 415(c)(6) of the Code), and (ii) is the product of 1.4 multiplied by the amount which may be taken into account under Section 415(c)(1)(B) of the Code (or Section 415(c)(7) of the Code, if applicable) with respect to the Participant for the Plan Year. Solely for purposes of this definition, contributions made directly by an Employee to a Defined Benefit Plan which maintains a qualified cost-of-living arrangement as such term is defined in Section 415(k)(2) shall be treated as Annual Additions. Notwithstanding the foregoing, the numerator of the Defined Contribution Plan Fraction shall be adjusted pursuant to Treasury Regulations 1.415-7(d)(1) and Questions T-6 and T-7 of Internal Revenue Service Notice 83-10.
Decommissioning Plan means the document containing detailed information on the proposed decommissioning and covering the following: the selected decommissioning strategy; the schedule, type and sequence of decommissioning activities; the waste management strategy applied, including clearance; the proposed end state; the storage and disposal of the waste from decommissioning; the timeframe for decommissioning; the cost estimates for the completion of decommissioning; and the objectives, expected results, milestones, target dates, as well as the corresponding key performance indicators, including, as appropriate, earned value based indicators. The plan is prepared by the nuclear facility license holder and is reflected in the multiannual work programmes of the Programme;
Reclamation plan means the operator's written proposal, as required and approved by the department, for reclamation of the land that will be disturbed. The proposal must include, to the extent practical at the time of application for an operating permit:
Maximum Generation Emergency means an Emergency declared by the Office of the Interconnection to address either a generation or transmission emergency in which the Office of the Interconnection anticipates requesting one or more Generation Capacity Resources, or Non- Retail Behind The Meter Generation resources to operate at its maximum net or gross electrical power output, subject to the equipment stress limits for such Generation Capacity Resource or Non-Retail Behind The Meter resource in order to manage, alleviate, or end the Emergency.
Cost allocation plan means central service cost allocation plan, public assistance cost allocation plan, and indirect cost rate proposal. Each of these terms are further defined in this section.
the We Love Manchester Emergency Fund means the registered charity of that name (number 1173260) established on 30th May 2017;
Penetration Testing means security testing in which assessors mimic real-world attacks to identify methods for circumventing the security features of an application, system, or network. (NIST SP 800-115)