Successfully Operating Transponder definition

Successfully Operating Transponder. A Successfully Operating Transponder is a Transponder which meets either or both of the following two criteria: (a) The Transponder meets or exceeds the performance specifications set forth in Exhibit B. For the avoidance of doubt, if the Spacecraft is placed into inclined orbit, then the Transponders shall be deemed not to meet the criteria stated in this Paragraph 6.3.1.3 (a) at such time as the Spacecraft would have ceased to have a Useful Commercial Life, (as mutually determined by the Parties) had it not been placed in such an orbit. (b) The Transponder, while not meeting or exceeding the performance specifications, provides Buyer with no material loss in its commercial value. A Transponder shall also be deemed to be a Successfully Operating Transponder if it meets the performance specifications through use of any redundant or spare equipment.
Successfully Operating Transponder means a transponder which is operational and fully meets and satisfies the technical specifications as per Exhibit — A hereto.
Successfully Operating Transponder means a transponder which is operational and fully meets and satisfies the technical specifications as per Exhibit – A hereto. “Transponder Failure” means, with respect to any Transponder, such Transponder fails to provide Capacity (or part thereof) that meets the technical specifications as per Exhibit A in any material respect for any period of three (3) consecutive days. For purposes of this definition, measurement of periods of failure shall commence when the signal has been vacated to permit verification of the existence of the failure by DOS/Singtel.

Examples of Successfully Operating Transponder in a sentence

  • A Transponder shall also be deemed to be a Successfully Operating Transponder if it meets the performance specifications through use of any redundant or spare equipment not already in use by another Transponder.

  • There is no mechanism to force]a country to set a specific target by a specific date, but each target should go beyond previously set targets.


More Definitions of Successfully Operating Transponder

Successfully Operating Transponder means a transponder which is operational and fully meets and satisfies the technical specifications as per Exhibit – A hereto. ANTRIX CORPORATION LTD. BANGALORE DEPARTMENT OF SPACE GOVT. OF INDIA VIDEOCON d2h LIMITED MUMBAI Page 4 of 4
Successfully Operating Transponder means a Transponder in the Satellite which meets any one of the following criteria: 1) The Transponder is performing in compliance with the communications requirements of Exhibit B. 2) The Transponder, while not performing in compliance with Exhibit B, is performing in compliance with the material specifications in Exhibit B relevant to the Transponder's intended use and is capable of generating revenue from such intended use at substantially the same level of revenues as if it were operating as specified in Exhibit B. 3) The Transponder is not performing in compliance with Exhibit B due to the Satellite not being a Properly Operated Satellite. 4) The Transponder is turned off but would otherwise be capable of meeting one of the above three criteria. 5) The Transponder is on the Satellite which is placed in a storage orbit, rather than being placed at the Specified Orbital Location, at the request of or by AsiaSat, provided that Contractor does not otherwise know that the Transponder is not a Successfully Operating Transponder and provided further that the placement of the Satellite in an orbital location other than the Specified Orbital Location solely for the purpose of testing the Satellite in accordance with the IOT as defined in the test plan shall not be considered placement in a storage orbit. Any failure of a Transponder which is corrected by switching to a redundancy in the system immediately after the failure is discovered shall not be deemed as nonconformance to Exhibit B, and shall not cause the Transponder to be considered anything other than a Successfully Operating Transponder.

Related to Successfully Operating Transponder

  • Signaling Transfer Point (“STP”) means a signaling point that performs message routing functions and provides information for the routing of messages between signaling points within or between CCIS networks. A STP transmits, receives and processes CCIS messages.

  • Qualifying Transmission Upgrade means a proposed enhancement or addition to the Transmission System that: (a) will increase the Capacity Emergency Transfer Limit into an LDA by a megawatt quantity certified by the Office of the Interconnection; (b) the Office of the Interconnection has determined will be in service on or before the commencement of the first Delivery Year for which such upgrade is the subject of a Sell Offer in the Base Residual Auction; (c) is the subject of a Facilities Study Agreement executed before the conduct of the Base Residual Auction for such Delivery Year and (d) a New Service Customer is obligated to fund through a rate or charge specific to such facility or upgrade.

  • Network Integration Transmission Service means the transmission service provided under Tariff, Part III.

  • Regional Transmission Expansion Plan means the plan prepared by the Office of the Interconnection pursuant to Operating Agreement, Schedule 6 for the enhancement and expansion of the Transmission System in order to meet the demands for firm transmission service in the PJM Region.

  • Interregional Transmission Project means transmission facilities that would be located within two or more neighboring transmission planning regions and are determined by each of those regions to be a more efficient or cost effective solution to regional transmission needs.

  • Firm Transmission Feasibility Study means a study conducted by the Transmission Provider in accordance with Tariff, Part II, section 19.3 and Tariff, Part III, section 32.3.

  • Capacity Transmission Injection Rights means the rights to schedule energy and capacity deliveries at a Point of Interconnection of a Merchant Transmission Facility with the Transmission System. Capacity Transmission Injection Rights may be awarded only to a Merchant D.C. Transmission Facility and/or Controllable A.C. Merchant Transmission Facilities that connects the Transmission System to another control area. Deliveries scheduled using Capacity Transmission Injection Rights have rights similar to those under Firm Point-to-Point Transmission Service or, if coupled with a generating unit external to the PJM Region that satisfies all applicable criteria specified in the PJM Manuals, similar to Capacity Interconnection Rights.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Participating Transmission Owner or “Participating TO” means an entity that (a) owns, operates and maintains transmission lines and associated facilities and/or has entitlements to use certain transmission lines and associated facilities and (b) has transferred to the CAISO operational control of such facilities and/or entitlements to be made part of the CAISO Grid.

  • Cannabis testing facility means an entity registered by

  • Basic generation service or "BGS" means electric generation

  • Interconnection Study means any of the studies defined in the CAISO Tariff or, if applicable, any distribution provider’s tariff that reflect the methodology and costs to interconnect the Project to the Participating Transmission Owner’s electric grid.

  • Continuous parameter monitoring system (CPMS means all of the equipment necessary to meet the data acquisition and availability requirements of the Prevention of Significant Deterioration program, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, O2 or CO2 concentrations), and to record average operational parameter value(s) on a continuous basis.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.

  • Basic generation service provider or "provider" means a

  • Incremental Rights-Eligible Required Transmission Enhancements means Regional Facilities and Necessary Lower Voltage Facilities or Lower Voltage Facilities (as defined in Tariff, Schedule 12) and meet one of the following criteria: (1) cost responsibility is assigned to non-contiguous Zones that are not directly electrically connected; or (2) cost responsibility is assigned to Merchant Transmission Providers that are Responsible Customers.

  • Generation Service means the sale of electricity, including ancillary services such as the provision of reserves, to a Customer by a Competitive Supplier.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Continuous parameter monitoring system or "CPMS" means all of the equipment necessary to meet the data acquisition and availability requirements of this chapter, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, oxygen or carbon dioxide concentrations), and to record average operational parameter value on a continuous basis.

  • Modular building retailer means any person who purchases or acquires a modular building from a

  • Penetration Testing means security testing in which assessors mimic real-world attacks to identify methods for circumventing the security features of an application, system, or network. (NIST SP 800-115)

  • Interconnection Studies means the Interconnection Feasibility Study, the System Impact Study, and the Facilities Study described in Tariff, Part IV and Tariff, Part VI.

  • Net metering period means the 12-month period following the date of final interconnection of the

  • Energy Transmission Injection Rights means the rights to schedule energy deliveries at a specified point on the Transmission System. Energy Transmission Injection Rights may be awarded only to a Merchant D.C. Transmission Facility that connects the Transmission System to another control area. Deliveries scheduled using Energy Transmission Injection Rights have rights similar to those under Non-Firm Point-to-Point Transmission Service.

  • Optional Interconnection Study means a sensitivity analysis of an Interconnection Request based on assumptions specified by the Interconnection Customer in the Optional Interconnection Study Agreement.

  • Network Transmission Service means transmission service provided pursuant to the rates, terms and conditions set forth in Tariff, Part III, or transmission service comparable to such service that is provided to a Load Serving Entity that is also a Transmission Owner.