Examples of Tail Gas Unit in a sentence
Kapolei Refinery Sulfur Recovery Plant” or “Kapolei SRP” shall mean the SRP at the Kapolei Refinery and includes, but is not limited to SRU 2 (BR1371), SRU 2 Sulfur Pit, SRU 3 (BR1381), SRU 3 Sulfur Pit, Tail Gas Unit (BR1393), Tail Gas Incinerator H1353, and Tail Gas Incinerator H1391.
Consent Decree, CountryMark shall submit to EPA and IDEM, a Plan for Maintenance and Operation (“PMO”) of its SRP, the associated Tail Gas Unit (“TGU”), any supplemental control devices, and the Upstream Process Units for the Refinery.
No later than 45 days following the end of an Acid Gas Flaring Incident, a Tail Gas Unit shutdown, bypass of a Tail Gas Unit, or other event resulting in a Tail Gas Incident, including scheduled and unscheduled Shutdowns of a Sulfur Recovery Plant, occurring after the Date of Entry, Shell shall conduct an investigation to identify the Root Cause(s) of the Flaring Incident and record the findings of the investigations in a report (“Root Cause Failure Analysis”).
TG”) shall mean exhaust from a Claus train and/or the Tail Gas Unit section of an SRP.
SO2 - 250]i [0.169 x 10-6] [(20.9 - % O2)/20.9]ii = 1Where:ERTGI = Emissions in excess of the 250 ppm limit from the Tail Gas Unit at the SRP incinerator, pounds of SO2 over a 24-hour periodTDTGI = Hours when the incinerator CEM was exceeding 250 ppmvd SO2 on a rolling twelve hour average, corrected to 0% O2, in each 24- hour period of the Incidenti = Each hour within TDTGIFRInc.
Each Claus train has its own SCOT Tail Gas Unit (“TGU”) that serves as that train’s control device.
On and after the date of NSPS applicability for the Refinery’s SRP, CountryMark shall, for all periods of operation of the SRP, comply with 40 C.F.R. § 60.102a(f)(2)(i), except during periods of Startup, Shutdown or Malfunction of the SRP or Malfunction of the Tail Gas Unit.
SO2 – 250]i [0.169 x 10-6] [[20.9 - % O2]/[20.9]]ii = 1Where:ERTGI = Emissions from Tail Gas Unit at the SRP incinerator, pounds of SO2 over a 24 hour periodTDTGI = Hours when the incinerator CEM was exceeding 250 ppmvd SO2 on a rolling twelve hour average, corrected to 0% O2, in each 24 hour period of the Incidenti = Each hour within TDTGIFRInc.
We call this message structural and refers to the defense of the stablished order, specifically, the New World Order that originates, as immediate root, from 1991, when George Bush, father, “officially inaugurated it.”We call the other type of message, conjunctural.
No. 3 Sulfur Recovery Unit (SRU)/No. 3 SCOT Tail Gas Unit (March 27, 2002 Application) The permit amendment allows for the installation of the No. 3 SRU/No. 3 SCOT tail gas unit (EU 083).