Task 11 definition

Task 11. Preconstruction Field Work (as applicable) The preconstruction field work, if any, shall be at the direction of the Department, in its sole discretion, and may include, without limitation, design and/or Project-related activities, such as: Utility Relocation Potholing Preliminary soil and geotech studies Right of Way Demolition Preliminary Survey Installation of best management practices (BMP) Public outreach Other design-related activities All such activities shall be consistent with the NEPA process.
Task 11. Preconstruction Field Work (as applicable) The preconstruction field work, if any, shall be at the direction of the Department, in its sole discretion, and may include, without limitation, design and/or Project-related activities, such as: Utility Relocation Potholing Preliminary soil and geotech studies Right of Way Demolition Preliminary Survey Installation of best management practices (BMP) Public outreach Other design-related activities Preconstruction Environmental Surveys Hazardous Waste Remediation Monument Preservation, Location and Record of Survey All such activities shall be consistent with the NEPA and CEQA processes.
Task 11. Preconstruction Field Work (as applicable) The preconstruction field work, if any, shall be at the direction of the Department, in its sole discretion, and may include, without limitation, design and/or Project-related activities, such as:

Examples of Task 11 in a sentence

  • Deliverables: • DWR Certificate of Project Completion • Record Drawings Task 11: Construction Construction activities are outlined below.

  • Task 1.1 Kick-off Meeting The goal of this task is to establish the lines of communication and procedures for implementing this Agreement.

  • Task 1.1 - Project Coordination and Management The Design/Builder will provide project management including project set-up and initiation, budget control, and coordination with the project team.

  • Deliverables: • DWR Certificate of Project Completion • Record Drawings Task 11: Construction Construction activities are outlined below and will adhere to construction standards, health and safety standards, laboratory analysis protocols, and acceptable standard methods.

  • Work Package 1 “Stakeholder Engagement” (Task 1.1) states that the LEARN Project will organise five Workshops to be organised in Europe and Chile.

  • Overview of Project Tasks • Task 1.1: Sequestering uranium at the Hanford 200 Area by in situ subsurface pH manipulation using NH3 gas – Evaluates the role of major pore water constituents (Si, Al, Ca, Mg, HCO3 ions) on the U(VI) sequestration – studies the solubility of uranium‐bearing precipitates created after NH3 gas injection.

  • Refer to Task 11 herein for further information regarding the Construction GMP bid and the fixed price bid.

  • The plan and costs will need to be further refined by the Contractor in the Comprehensive Evaluation Plan (Task 11), once the specifics of the Smart Columbus Program deployment, performance measurement, and evaluation support strategies become clearer.

  • DWR IRWM grant funding under this agreement will support Phase 3 of the project and will be directed to construction for the North and South Reaches (Task 11).

  • Task 11: Assign service recipients to support levels based on assessment.


More Definitions of Task 11

Task 11. Prepare Phase I and Phase II Environmental Assessments as required for projects. Task 11 Deliverables: • Phase I and Phase II Environmental Assessments.
Task 11. DEVELOPMENT OF NANOCOMPOSITE LAYER-1 The Contractor shall develop [*** Redacted] nanocrystal nanocomposite films for Phase 1 devices by 9MAC.
Task 11. Meetings: Consultant shall attend up to four staff coordination meetings and two City Council meetings. Deliverables: Attend in person meetings as required by staff.

Related to Task 11

  • lb means pound.

  • SOQ means Statement of Qualifications.

  • Helpdesk Support means the 24x7x365 centre which shall handle Fault reporting, Trouble Ticketing and related enquiries during this contract.

  • Technical Support Services means the technical support and maintenance Services provided by us according to our then-current technical support policy and procedure listed at xxxxxxxxxxxxx.xxx (“Technical Support Policy”) when the Services are purchased.

  • Commercial Development Plan means the written commercialization plan attached as Appendix E.

  • Clinical categories means the groups into which hospital treatments are categorised by type, e.g., brain and nervous system, kidney and bladder, and digestive system. At the time of writing there were 38 categories in the Medicare clinical categories system.

  • IPPF means the indigenous peoples planning framework for the Investment Program, including any update thereto, agreed between the Borrower and ADB and incorporated by reference in the FFA;

  • Statement of Work means the description of activities performed in completing the Project, as specified in the Contract and as may be amended.

  • UMDAP means the Uniform Method of Determining Ability to Pay and refers to the 2 method used for determining the annual Client liability for Mental Health Services received from the 3 COUNTY mental health system and is set by the State of California.

  • Technology Transfer has the meaning set forth in Section 5.2.

  • PCT means the Patent Cooperation Treaty;

  • municipal spatial development framework means a municipal spatial development framework adopted by the Municipality in terms of Chapter 5 of the Municipal Systems Act;

  • Basic Comprehensive User Guide means the Ministry document titled Basic Comprehensive Certificates of Approval (Air) User Guide” dated April 2004 as amended.

  • Clinical evaluation means a systematic and planned process to continuously generate, collect, analyse and assess the clinical data pertaining to a device in order to verify the safety and performance, including clinical benefits, of the device when used as intended by the manufacturer;

  • Basic research means any original investigation for the advancement of scientific or technological knowledge that will enhance the research capacity of this state in a way that increases the ability to attract to or develop companies, jobs, researchers, or students in this state.

  • CMC means Comprehensive maintenance Contract (labour, spare and preventive maintenance)

  • site development plan means a dimensioned plan drawn to scale that indicates details of the proposed land development, including the site layout, positioning of buildings and structures, property access, building designs and landscaping;

  • Clinical nurse specialist means a registered nurse with relevant post-basic qualifications and 12 months’ experience working in the clinical area of his/her specified post-basic qualification, or a minimum of four years’ post-basic registration experience, including three years’ experience in the relevant specialist field and who satisfies the local criteria.

  • scientific research means any activity in the field of natural or applied science for the extension of knowledge;

  • Project Management Plan means the management plan that (i) sets out a high level workplan to describe the manner in which the Design-Builder will manage the Project, including to address related matters such as traffic management and communications, and (ii) is prepared by or for the Design-Builder and submitted to the Owner;

  • Technology Transfer Plan will have the meaning set forth in Section 4.1.

  • Design-build team means an entity that consists of:

  • Mining Xxx 0000 means (unless the context otherwise requires) the Mining Xxx 0000 and the amendments thereto and the regulations made thereunder as in force on 31st December, 1981;

  • Quality Assurance Plan or “QAP” shall have the meaning set forth in Clause 11.2;

  • Project Number means a unique number assigned to the project by the department or the city, village, town or county that is undertaking the project.

  • Waste Framework Directive or “WFD” means Waste Framework Directive 2008/98/EC of the European Parliament and of the Council on waste