Examples of Transmission Issue in a sentence
A Multi Value Project must address at least one Transmission Issue associated with a projected violation of a NERC or Regional Entity standard and at least one economic-based Transmission Issue that provides economic value across multiple pricing zones.
Topic #4: Multi-TRxP Transmission Issue 4-2-1: For FR1 Intra-band CA, whether or not the same conclusion as intra-band EN-DC can be applied Agreement For FR1 Intra-band CA, RRM MRTD requirement impact due to enabling multi-TRxP transmission in Rel-16: RAN4 apply the same conclusion as intra-band EN-DC.
A Multi-Value Project must address at least one Transmission Issue associated with a projected violation of a NERC or Regional Entity standard and at least one economic-based Transmission Issue that provides economic value across multiple pricing zones.
Life-cycle cost comparisons, including consideration of the period that is required to address the Transmission Issue, which may be less than the life cycle of alternatives, and including the factors described in Section II.G.1.b.
Additional considerations that may support comparative evaluation to other solutions to the Transmission Issue, such as lead-time to develop, right of way or substation impacts, expandability, operational flexibility, or others.
The minimum and maximum Capacity required to address the Transmission Issue to ensure that excess storage Capacity is not treated as a transmission asset.
The Transmission Provider will test the expansion model with and without the SATOA operating in the manner required for the SATOA to address the Transmission Issue identified for the SATOA to resolve.
Cost recovery under transmission rates is limited to the cost of the maximum Capacity determined to be needed to address the Transmission Issue and will be pro-rated on that basis if a SATOA of higher Capacity is proposed, selected for inclusion in Appendix A of MTEP, and installed.
The Transmission Provider will include in this report a date(s) by which state approval(s) to construct must be achieved based upon when construction must begin to timely meet the Transmission Issue to be addressed by the Open Transmission Project(s) and taking into account the project implementation schedule(s) provided by the Selected Transmission Developer in its New Transmission Proposal.
The Market Activity at a SATOA’s Commercial Pricing Node will be limited to the charging and discharging necessary for the SATOA to meet or be ready to mitigate the identified Transmission Issue for which the SATOA was included in the MTEP or selected in the MTEP for purposes of cost allocation.