Underground facility easement definition

Underground facility easement means a nonpossessory right to operate, control, bury, install, maintain, or access an underground facility.
Underground facility easement means a nonpossessory right to operate, control, bury, install, maintain, or access an under- ground facility.
Underground facility easement means a nonpossessory right

More Definitions of Underground facility easement

Underground facility easement means a nonpossessory right to op- erate, control, bury, install, maintain, or access an underground facility.
Underground facility easement means a nonpossessory right to
Underground facility easement means a nonpossessory right to op-

Related to Underground facility easement

  • Underground facility means any item which shall be buried or placed below ground for use in connection with the storage or conveyance of water, sewage, electronic, telephone or telegraphic communications, electric energy, oil, gas or other substances, and shall include, but not be limited to pipes, sewers, conduits, cables, valves, lines, wires, manholes, attachments and those portions of poles and their attachments below ground.

  • Utility easement means a right held by a facility operator to install, maintain, and access an underground facility or pipeline.

  • Easement Area means the area of the servient lot marked on the survey-strata plan as being subject to the relevant easement; and

  • Underground area means an underground room, such as a basement, cellar, shaft or vault, providing enough space for physical inspection of the exterior of the tank situated on or above the surface of the floor.

  • Underground storage means storage of gas in a subsurface stratum or formation of the earth.

  • Underground storage tank or “UST” means any one or combination of tanks (including underground pipes connected thereto) that is used to contain an accumulation of regulated substances, and the volume of which (including the volume of underground pipes connected thereto) is 10 percent or more beneath the surface of the ground. This term does not include any:

  • Underground tank means a device meeting the definition of tank whose entire surface area is totally below the surface of and covered by the ground.

  • Easement Agreement means any conditions, covenants, restrictions, easements, declarations, licenses and other agreements listed as Permitted Encumbrances or as may hereafter affect the Leased Premises.

  • Parcel 2 COMMON AREA APPURTENANT TO EACH COMMERCIAL UNIT PARCEL 3: NONEXCLUSIVE EASEMENTS PARCEL C (COMPRISING PARCEL 1, PARCEL 2, AND PARCEL 3,) PARCEL 1;

  • Facility Site means the site described in Schedule B. “FERC” means the Federal Energy Regulatory Commission.

  • Underground storage tank system means an underground storage tank and the connected underground piping, underground ancillary equipment, and containment system, if any.

  • adjacent land means all land that borders a property and all land that would have bordered a property, if they were not separated by a river, road, railway line, power transmission line, pipeline, or a similar feature;

  • Conservation easement means that term as defined in section 2140 of the natural resources and environmental protection act, 1994 PA 451, MCL 324.2140.

  • Project site, where applicable, means the place indicated in bidding documents.

  • Project Site(s) means the place(s) specified in the SCC for the supply and installation of the System.

  • Underground mining means all methods of mining other than surface mining.

  • Drainage area means a geographic area within which stormwater, sediments, or dissolved materials drain to a particular receiving waterbody or to a particular point along a receiving waterbody.

  • Underground injection means the subsurface emplacement of fluids through a bored, drilled or driven well; or through a dug well, where the depth of the dug well is greater than the largest surface dimension. (See also “injection well”.)

  • ILUA Area means the geographical area in relation to which the Framework ILUA applies, as specified in Schedule 2 of the Framework ILUA;

  • Sanitary landfill means a disposal facility for solid waste so located, designed and operated that it

  • Water Surface Elevation (WSE means the height, in relation to NAVD 1988, of floods of various magnitudes and frequencies in the floodplains of riverine areas.

  • Garage shall have the meaning ascribed to it in Recital H;

  • Aboveground storage tank shall have the meaning ascribed to such term in Section 6901 et seq., as amended, of RCRA, or any applicable state or local statute, law, ordinance, code, rule, regulation, order ruling, or decree governing aboveground storage tanks.

  • communal land means land under the jurisdiction of a traditional council determined in terms of section 6 of the Eastern Cape Traditional Leadership and Governance Act, (Act 4 of 2005) and which was at any time vested in -

  • Surface impoundment or "impoundment" means a facility or part of a facility which is a natural topographic depression, man-made excavation, or diked area formed primarily of earthen materials (although it may be lined with man-made materials), which is designed to hold an accumulation of liquid wastes or wastes containing free liquids, and which is not an injection well. Examples of surface impoundments are holding, storage, settling, and aeration pits, ponds, and lagoons.

  • Water surface elevation means the height, in relation to the National Geodetic Vertical Datum (NGVD) of 1929, the North American Vertical Datum (NAVD) of 1988, or other datum, where specified, of floods of various magnitudes and frequencies in the floodplains of riverine areas.