Examples of Vent shaft in a sentence
The following additional Mogul shafts have been identified:• Vent shaft above the Waeltz Plant, Ballygown (capped);• Two vent shafts to the east of the Magcobar pit (to be located during the topographical survey);• Two vent shafts to east of subsidence zone, Gorteenadiha (to be located during the topographical survey);• Vent shaft to west of subsidence zone, Gorteenadiha (capped).
Vent shaft No. 9 :Exterior view and cross-sectional view of the structure.
Air QualityRestriction #1: Vent shaft setback, monitoring porthole, and closureVent shafts shall be no closer (setback) than 1,500 ft to any adjoining property line, unless the owner of said location agrees to a lesser setback distance.
The lateral pipe connecting manhole to Vent shaft, should be of HDPE material.2. The PN (Pressure Nominal) rating of the HDPE pipe should be minimum 2.5.
A 30-inch (minimum) wide walkway at 10 inches above top of rail (TOR) is provided on the inside (left side) of each tunnel bore for routine maintenance access and emergency egress.The standpipe system has fill points at the Washington Park Station head house and the West Vent shaft building, which can be filled locally or remotely from the Washington Park or the Ruby Junction Command Center.
Air QualityRestriction #1: Vent shaft setback, monitoring porthole, and closureVent shafts shall be no closer (setback) than 1,500 ft to any residences, farmsteads, feedlots, confined animal feeding operations (CAFOs), or places of public assembly, unless the owner of said location agrees to a lesser setback distance.
Therefore, the Department has proposed the “Supply, Installation, Testing & Commissioning of Vent shaft with Odour control arrangement in City & Suburbs with allied works”The contractor shall do the work of Supply, Installation, Testing & Commissioning of Vent shaft with Odour control arrangement in City & Suburbs with allied works as per technical specifications of the tender.
Vent shaft No. 9 (Figure 9) is particularly complex as it serves six underground levels and hosts the control centre of the urban motorways network of Montréal.
Vent shaft noise reductions shall be achieved by absorption treatment in the shafts applied to the walls and ceilings.