Water Use Plan definition

Water Use Plan means a document, in writing or by plans, prepared to the satisfaction of Western Water which governs the use of Water for specified purposes, and for the specified stage of restrictions.
Water Use Plan means a Water Use Plan approved by the City Engineer under Part 4.
Water Use Plan has the meaning given in the Water Act.

Examples of Water Use Plan in a sentence

  • Details regarding this recommendation are provided in the Columbia River Water Use Plan: Consultative Committee Report.

  • The Secretary will annually review the status of implementation of the California Colorado River Water Use Plan during the development of the AOP.

  • For the avoidance of doubt, if an approved Water Use Plan is in place in relation to a use of Water, but the use of Water is not carried out in accordance with the approved Water Use Plan that use of Water is subject to the restrictions for that use contained in Schedule 1.

  • The purpose of the California Colorado River Water Use Plan is to ensure that California limits its use of Colorado River water to no more than4.4 maf in normal years at the end of the fifteen year period for these Guidelines, unless a surplus is determined under the 70R strategy.

  • The Water Use Plan, Chapter 5 of the Harbor Management Plan, is hereby incorporated in the ordinance by reference.

  • In February 2006, the operating constraints were modified based on a recommended flow regime from the Water Use Plan (WUP).

  • Prepared on behalf of the Consultative Committee for the Campbell River Water Use Plan.

  • Report prepared for the Columbia River Water Use Plan Consultative Committee by BC Hydro, Burnaby, BC.

  • Affected Water Users under the Instream Flow Rules are required to have a Conservation Plan and a Water Use Plan as their part of the Water Management Plan.

  • Reservoir woody debris is managed to: (i) minimize damage to Peace Water Use Plan (WUP) project sites; (ii) minimize navigation hazards; (iii) improve fish access to tributaries; and (iv) reduce shoreline erosion and damage to riparian vegetation.

Related to Water Use Plan

  • Land use plan means a plan prepared under former 1921 PA 207, former 1943 PA 184, or a site plan under the Michigan zoning enabling act, 2006 PA 110, MCL 125.3101 to 125.3702.

  • Intended use plan or “IUP” means the program document identifying the intended uses of funds available for loans pursuant to the WPCSRF and the DWSRF.

  • Case plan means a written document developed by the PCSA, PCPA or Title IV-E agency and the family which identifies strengths of the family, concerns to be resolved and supportive services to be provided which will result in ensuring permanence for the child.

  • Adopt a comprehensive land use plan means to enact a new

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • Stormwater Pollution Prevention Plan or "SWPPP" means a document that is prepared in accordance with good engineering practices and that identifies potential sources of pollutants that may reasonably be expected to affect the quality of stormwater discharges from the construction site, and otherwise meets the requirements of this Ordinance. In addition the document shall identify and require the implementation of control measures, and shall include, but not be limited to the inclusion of, or the incorporation by reference of, an approved erosion and sediment control plan, an approved stormwater management plan, and a pollution prevention plan.

  • Spatial Planning and Land Use Management Act means the Spatial Planning and Land Use Management Act, 2013 (Act 16 of 2013);

  • North American Numbering Plan or "NANP" means the basic numbering plan for the Telecommunications networks located in the United States as well as Canada, Bermuda, Puerto Rico, Guam, the Commonwealth of the Xxxxxxxx Islands and certain Caribbean Islands. The NANP format is a 10-digit number that consists of a 3-digit NPA code (commonly referred to as the area code) followed by a 3-digit NXX code and 4-digit line number.

  • Water user means a person, corporation, or other entity having a right to divert water from the Bear River for beneficial use;

  • Source Protection Plan means a drinking water source protection plan prepared under the Clean Water Act, 2006;

  • Conservation Plan means a document that outlines how a project site will be managed using best management practices to avoid potential negative environmental impacts.

  • Reclamation plan means the operator's written proposal, as required and approved by the department, for reclamation of the land that will be disturbed. The proposal must include, to the extent practical at the time of application for an operating permit:

  • Virginia Stormwater Management Program or “VSMP” means a program approved by the State Board after September 13, 2011, that has been established by a locality to manage the quality and quantity of runoff resulting from land-disturbing activities and shall include such items as local ordinances, rules, permit requirements, annual standards and specifications, policies and guidelines, technical materials, and requirements for plan review, inspection, enforcement, where authorized in this article, and evaluation consistent with the requirements of this article and associated regulations.

  • North American Numbering Plan (NANP) means the numbering architecture in which every station in the NANP Area is identified by a unique ten (10)-digit address consisting of a three (3)-digit NPA code, a three (3)-digit central office code of the form NXX, and a four (4)-digit line number of the form XXXX.

  • Emergency Response Plan means the plan constituting the set of procedures developed by the Owner for dealing with an Incident which may impact on the Network or Connecting Infrastructure, including all actions to be taken to minimise or alleviate any threat or danger to any person or property:

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • public service infrastructure means publicly controlled infrastructure of the following kinds:

  • Noncommunity water system means a public water system that is not a community water system.

  • Restricted use pesticide means any pesticide or device which, when used as directed or in accordance with a widespread and commonly recognized practice, the director determines, subsequent to a hearing, requires additional restrictions for that use to prevent unreasonable adverse effects on the environment including people, lands, beneficial insects, animals, crops, and wildlife, other than pests.

  • Service Plan means the Operating Plan and Budget appended as Schedules A and D2a of Schedule D;

  • Community water system means a public water system which serves at least 15 service connections used by year-round residents or regularly serves at least 25 year-round residents.

  • Disabled parking license plate means a license plate that displays the international symbol of access

  • State implementation plan or “SIP” means the plan adopted by the state of Iowa and approved by the Administrator which provides for implementation, maintenance, and enforcement of such primary and secondary ambient air quality standards as they are adopted by the Administrator, pursuant to the Act.

  • Health and Safety Plan means a documented plan which addresses hazards identified and includes safe work procedures to mitigate, reduce or control the hazards identified;

  • Non-U.S. Plan means any plan, fund or other similar program that (a) is established or maintained outside the United States of America by the Company or any Subsidiary primarily for the benefit of employees of the Company or one or more Subsidiaries residing outside the United States of America, which plan, fund or other similar program provides, or results in, retirement income, a deferral of income in contemplation of retirement or payments to be made upon termination of employment, and (b) is not subject to ERISA or the Code.

  • Park Rules means the rules of conduct and practice issued by us from time to time and applicable to the use of the Caravan and other facilities at the Park. A copy of the Park Rules in force at the date of this Licence Agreement is attached.