Examples of Well rehabilitation in a sentence
NR 812.20 Grouting and sealing.NR 812.21 Liners.NR 812.22 Well rehabilitation and batch chlorination.
Well rehabilitation by noncontinuous chemical treatment shall be conducted using methods and materials approved by the Department based on a demonstration that the materials and methods used will not create a violation of groundwater standards in 15A NCAC 02L, including rendering the groundwater unsuitable for its intended best use after completion of the rehabilitation.
Well rehabilitation has been estimated to cost in the vicinity of $3,000 to $12,000 per well (depending on well diameter, depth, and degree of fouling), when subcontractor, contractor oversight, decontamination and purge water treatment costs are included (Smith, 1995).
Mr. Van Wyck stated that the Casper 10 Well rehabilitation work has been completed and is back in service.
Well rehabilitation is allowable if (1) the well was inundated, and (2) damage can be reasonably judged to have been caused by the flood event, and not by an improperly functioning flap.
Well rehabilitation is employed in response to significant biofouling and most commonly involves physical swabbing and pumping procedures, coupled with the use of aggressive and potentially hazardous chemicals.
Well rehabilitation by noncontinuous chemical treatment shall be conducted using methods and materials approved by the Department based on a demonstration that the materials and methods used will not create a violation of groundwater standards in 15A NCAC 02L or otherwise render the groundwater unsuitable for its intended best usage after completion of the rehabilitation.
Well rehabilitation methods which include surging by use of compressed air, backwashing or surging by alternately starting or stopping a pump, water jetting, sonic cleaning, or combinations of these, must obtain prior approval from the Director.
All Ranney Well rehabilitation work shall be coordinated with the Motor Control Center (MCC) electrical work performed by the Electrical Contractor It shall be the Ranney Col- lector Well Contractor’s responsibility to meet the completion deadline as specified in the Proposal.
Gains and losses from derivatives related to the Fair Value Hedging Program are not designated as hedging instruments.