SETTLEMENT OF DISPUTE. All disputes and differences of any kind whatsoever arising of or in connection with the contract whether during or after completion of contract shall be deemed to have arisen at Alwar Region and only court in Alwar shall have jurisdiction to determine the same. SCOPE OF WORK 1. THE ELECTRIC SAFTEY AUDIT SHALL BE CARRIED OUT TO SPECIFICALLY COVER THE FOLLOWING ASPECTS. • Physical inspection of the office premises with reference to applicable Indian standards, Indian Electricity Rules and other relevant codes of Practice & identifying electrical hazards (shocks, fires, etc.). • Review of protection devices / system of the electrical installation including fuses, ELCB, MCB, MCCB, master electrical switch, etc. • Review of adequacy of cables, motors, etc. based on actual load current measurements and cable current carrying capacities. • Review the EPM (Electrical Preventive Maintenance) programme and to examine documentation, checklists, test records, etc. and to suggest recommendations as per applicable standards. • To evaluate the earthing system (installation and maintenance) based on IS 3043 (or latest available IS standards) including availability, upkeep and testing of earth pits and to suggest recommendations. • Display of danger signboard • Use of electrical rubber mats, rubber gloves, etc. • Provision of identification tag of cables, cable glands, sealing of cable entry and unused holes • Upkeep and housekeeping of electrical installations • Provision of indicating lamps on the control panels • Use of 3-pin plug and socket • Fire protection of electrical installations • Arrangement for repair and maintenance of electrical installations, equipment and appliances including qualified maintenance personnel, accessibility, and maintenance practices, etc. • Adequacy of rating of electrical equipment and installation • Adequacy of isolation of current carrying parts • Lightening protection • Weather protection of outdoor electrical equipment and fittings • Cables – dressing, routing, identification tags, glands, lugs, armoured earthing, sealing of cable entry and used holes, adequacy for current carrying capacity, colour coding • DG Set – emergency switch, oil leakage, stack and noise monitoring, • UPS and battery room • Review of the following test records, (if any) evaluating the test results and to suggest recommendations as per applicable standards. • Insulation resistance tests • Earth resistance tests. 2. ACTUAL TESTS/ANALYSIS TO BE PERFORMED DURING T...
SETTLEMENT OF DISPUTE. All disputes and differences of any kind whatsoever arising of or in connection with the contract whether during or after completion of contract shall be deemed to have arisen at Jaipur Region and only court in Jaipur shall have jurisdiction to determine the same.