ABRIL S Sample Clauses

ABRIL S. A., a corporation with head office in the City of Sao Paulo, State of Sao Paulo, Brazil, at Xx. Xxxxxx Xxxxxx, 52, registered as Corporate Taxpayer under no. 44.597.052/0001-62, hereinafter simply called Abril; and
ABRIL S. A. of Xx. Xxxxxxxx Xxxxx xx Xxxx, No. 4400, 02909-900 Sao Paulo, SP, Brazil ("Lender")
ABRIL S. A., or any of their respective controlled Affiliates.
ABRIL S. A., a corporation [SOCIEDAD ANONIMA] duly organized and validly existing under the laws of the Republic of Chile, engaged in radio broadcasting, Individual Tax Payer Number ninety-six million eight hundred and four thousand seven hundred and seventy - one, hereinafter also called "Abril", all the aforementioned companies domiciled to these effects in this city at Eliodoro Yanez number one thousand seven hundred and eighty-three, Prxxxxxxxxx, Xxxtiago; and k)
ABRIL S. A. as Lender --------------------------------------- REVOLVING CREDIT FACILITY --------------------------------------- Index 1. Definition 2. Available Credit and Funding Options 3. Drawdown 4. Interest 5. Repayment and Prepayment 6. Representations and Warranties 7. Conditions Precedent 8. Events of Default 9. Fees 10. Miscellaneous 11. Notices 12.

Related to ABRIL S

  • Conhecimento da Lingua O Contratado, pelo presente instrumento, declara expressamente que tem pleno conhecimento da língua inglesa e que leu, compreendeu e livremente aceitou e concordou com os termos e condições estabelecidas no Plano e no Acordo de Atribuição (“Agreement” xx xxxxxx).

  • Unbundled Copper Loop – Designed (UCL-D) 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters). 2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance. 2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Telepak Networks. 2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Telepak Networks to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire. 2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Telepak Networks or BellSouth provides ninety

  • Securities Activities A. Neither Company nor any of its Subsidiaries is engaged principally, or as one of its important activities, in the business of extending credit for the purpose of purchasing or carrying any Margin Stock. B. Following application of the proceeds of each Loan, not more than 25% of the value of the assets (either of Company only or of Company and its Subsidiaries on a consolidated basis) subject to the provisions of subsection 7.2 or 7.7 or subject to any restriction contained in any agreement or instrument, between Company and any Lender or any Affiliate of any Lender, relating to Indebtedness and within the scope of subsection 8.2, will be Margin Stock.

  • Public Posting of Approved Users’ Research Use Statement The PI agrees that information about themselves and the approved research use will be posted publicly on the dbGaP website. The information includes the PI’s name and Requester, project name, Research Use Statement, and a Non-Technical Summary of the Research Use Statement. In addition, and if applicable, this information may include the Cloud Computing Use Statement and name of the CSP or PCS. Citations of publications resulting from the use of controlled-access datasets obtained through this DAR may also be posted on the dbGaP website.

  • TECHNOLOGY/KNOWLEDGE TRANSFER ACTIVITIES The goal of this task is to develop a plan to make the knowledge gained, experimental results, and lessons learned available to the public and key decision makers. • Prepare an Initial Fact Sheet at start of the project that describes the project. Use the format provided by the CAM. • Prepare a Final Project Fact Sheet at the project’s conclusion that discusses results. Use the format provided by the CAM. • Prepare a Technology/Knowledge Transfer Plan that includes: o An explanation of how the knowledge gained from the project will be made available to the public, including the targeted market sector and potential outreach to end users, utilities, regulatory agencies, and others. o A description of the intended use(s) for and users of the project results. o Published documents, including date, title, and periodical name. o Copies of documents, fact sheets, journal articles, press releases, and other documents prepared for public dissemination. These documents must include the Legal Notice required in the terms and conditions. Indicate where and when the documents were disseminated. o A discussion of policy development. State if project has been or will be cited in government policy publications, or used to inform regulatory bodies. o The number of website downloads or public requests for project results. o Additional areas as determined by the CAM. • Conduct technology transfer activities in accordance with the Technology/Knowledge Transfer Plan. These activities will be reported in the Progress Reports. • When directed by the CAM, develop Presentation Materials for an Energy Commission- sponsored conference/workshop(s) on the project. • When directed by the CAM, participate in annual EPIC symposium(s) sponsored by the California Energy Commission. • Provide at least (6) six High Quality Digital Photographs (minimum resolution of 1300x500 pixels in landscape ratio) of pre and post technology installation at the project sites or related project photographs. • Prepare a Technology/Knowledge Transfer Report on technology transfer activities conducted during the project. • Initial Fact Sheet (draft and final) • Final Project Fact Sheet (draft and final) • Presentation Materials (draft and final) • High Quality Digital Photographs • Technology/Knowledge Transfer Plan (draft and final) • Technology/Knowledge Transfer Report (draft and final)

  • WSIB & LTD An Employee who is receiving benefits under the Workplace Safety and Insurance Act, or under an LTD plan, is not entitled to benefits under a school board’s sick leave and short-term disability plan for the same condition unless the employee is on a graduated return to work program then WSIB/LTD remains the first payor. For clarity, where an employee is receiving partial benefits under WSIB/LTD, they may be entitled to receive benefits under the sick leave plan, subject to the circumstances of the specific situation. During the interim period from the date of the injury/incident or illness to the date of the approval by the WSIB/LTD of the claim, the employee may access sick leave and short-term leave and disability coverage. A reconciliation of sick leave deductions made and payments provided, will be undertaken by the school board once the WSIB/LTD has adjudicated and approved the claim. In the event that the WSIB/LTD does not approve the claim, the school board shall deal with the absence consistent with the terms of the sick leave and short-term leave and disability plans.

  • AT&T-21STATE communicates official information to CLECs via its Accessible Letter, or other applicable, notification processes. These processes involve electronic transmission and/or posting to the AT&T CLEC Online website, inclusive of a variety of subjects including declaration of a force majeure, changes on business processes and policies, and other product/service related notices not requiring an amendment to this Agreement.

  • meminta nasihat daripada Pihak Xxxxxx dalam semua perkara berkenaan dengan jualan lelongan, termasuk Syarat-syarat Jualan (iii) membuat carian Hakmilik Xxxxx xxxxxx rasmi di Pejabat Tanah xxx/atau xxxx-xxxx Pihak-pihak Berkuasa yang berkenaan xxx (iv) membuat pertanyaan dengan Pihak Berkuasa yang berkenaan samada jualan ini terbuka kepada semua bangsa atau kaum Bumiputra Warganegara Malaysia sahaja atau melayu sahaja xxx juga mengenai persetujuan untuk jualan ini sebelum jualan lelong.Penawar yang berjaya ("Pembeli") dikehendaki dengan segera memohon xxx mendapatkan kebenaran pindahmilik (jika ada) daripada Pihak Pemaju xxx/atau Pihak Tuanpunya xxx/atau Pihak Berkuasa Negeri atau badan-badan berkenaan (v) memeriksa xxx memastikan samada jualan ini dikenakan cukai. HAKMILIK : Hakmilik strata bagi hartanah ini masih belum dikeluarkan HAKMILIK INDUK / NO. LOT : Pajakan Negeri 35263, Lot No.29096 MUKIM/DAERAH/NEGERI : Setapak / Kuala Lumpur / Wilayah Persekutuan Kuala Lumpur PEGANGAN : Pajakan selama 82-tahun berakhir pada 08/08/2085 KELUASAN LANTAI : 81.104 meter persegi ( 873 kaki persegi ) PEMAJU/PENJUAL : Mega Planner Jaya Sdn Bhd (326287-W)(Dalam Likuidasi) TUANPUNYA : Datuk Bandar Kuala Lumpur PEMBELI : Xxxxxxxx Bin Xxxxx @ Xxxx BEBANAN : Diserahhak kepada RHB Bank Berhad [196501000373 (6171-M)] Hartanah tersebut terletak di tingkat 9 pada bangunan apartment 14-tingkat terletak di Melati Impian Apartment, Setapak Fasa 1, Kuala Lumpur. Hartanah tersebut adalah sebuah unit apartment 3 xxxxx dikenali sebaga Xxxxx Pemaju No. 9, Tingkat No.9, Pembangunan dikenali sebagai Melati Impian Apartment Setapak Fasa 1, Kuala Lumpur xxx mempunyai alamat surat-xxxxxxxx xx Xxxx Xx. 0-0, Xxxxxx Impian Apartment, Xxxxx 0/00X, Xxxxx Xxxxxx, 00000 Xxxxx Xxxxxx, Xxxxxxx Xxxxxxxxxxx Xxxxx Xxxxxx. Harta ini dijual “keadaan seperti mana sediada” dengan harga rizab sebanyak RM 300,000.00 (RINGGIT MALAYSIA: TIGA RATUS RIBU SAHAJA) xxx tertakluk kepada syarat-syarat Jualan xxx melalui penyerahan hakkan dari Pemegang Serahak, tertakluk kepada kelulusan di perolehi oleh pihak Pembeli daripada pihak berkuasa, jika ada, termasuk semua terma, syarat xxx perjanjian yang dikenakan xxx mungkin dikenakan oleh Pihak Berkuasa yang berkenaan. Pembeli bertanggungjawab sepenuhnya untuk memperolehi xxx mematuhi syarat-syarat berkenaan daripada Pihak Berkuasa yang berkenaan, jika ada xxx semua xxx xxx perbelanjaan ditanggung xxx dibayar oleh Xxxxx Xxxxxxx.Pembeli atas talian (online) juga tertakluk kepada terma-terma xxx syarat-syarat terkandung dalam xxx.xxxxxxxxxxxxxxxx.xxx Pembeli yang berminat adalah dikehendaki mendeposit kepada Pelelong 10% daripada harga rizab dalam bentuk Bank Draf atau Cashier’s Order di atas nama RHB Bank Berhad sebelum lelongan awam xxx xxxx xxxx xxxxxx hendaklah dibayar dalam tempoh sembilan puluh (90) hari dari tarikh lelongan kepada RHB Bank Berhad melalui Bank Draf / XXXXXX. Butir-butir pembayaran melalui XXXXXX, xxxx berhubung dengan Tetuan Zahrin Emrad & Sujaihah. Untuk maklumat lanjut, xxxx berhubung dengan TETUAN ZAHRIN EMRAD & SUJIAHAH, yang beralamat di Suite 10.3, 10th Floor, Xxx Xxxx Building, Xx.00, Xxxxx Xxxx Xxxxxx, 00000 Xxxxx Xxxxxx. Tel: 00-0000 0000 / Fax: 00-0000 0000. [ Ruj: ZES/ZHR/RHB-FC/16250-17/0614-pae ], peguamcara bagi pihak pemegang xxxxx xxx atau pelelong yang tersebut dibawah.

  • Post-IPO Warrants The Post-IPO Warrants, when and if issued, shall have the same terms and be in the same form as the Public Warrants except as may be agreed upon by the Company.

  • COVID-19 Employees of Contractor and/or persons working on its behalf, including, but not limited to, subcontractors (collectively, “Contractor Personnel”), while performing services under this Agreement and prior to interacting in person with City employees, contractors, volunteers, or members of the public (collectively, “In-Person Services”) must be fully vaccinated against the novel coronavirus 2019 (“COVID-19”). “Fully vaccinated” means that 14 or more days have passed since Contractor Personnel have received the final dose of a two-dose COVID-19 vaccine series (Moderna or Pfizer-BioNTech) or a single dose of a one-dose COVID-19 vaccine (Xxxxxxx & Xxxxxxx/Xxxxxxx) and all booster doses recommended by the Centers for Disease Control and Prevention. Prior to assigning Contractor Personnel to perform In-Person Services, Contractor shall obtain proof that such Contractor Personnel have been fully vaccinated. Contractor shall retain such proof for the document retention period set forth in this Agreement. Contractor shall grant medical or religious exemptions (“Exemptions”) to Contractor Personnel as required by law. If Contractor wishes to assign Contractor Personnel with Exemptions to perform In- Person Services, Contractor shall require such Contractor Personnel to undergo weekly COVID-19 testing, with the full cost of testing to be borne by Contractor. If Contractor Personnel test positive, they shall not be assigned to perform In-Person Services or, to the extent they have already been performing In-Person Services, shall be immediately removed from those assignments. Furthermore, Contractor shall immediately notify City if Contractor Personnel performing In-Person Services (1) have tested positive for or have been diagnosed with COVID-19, (2) have been informed by a medical professional that they are likely to have COVID-19, or (3) meet the criteria for isolation under applicable government orders.