Action Required for Emergency Modification/Replacement Sample Clauses

Action Required for Emergency Modification/Replacement. The Owner Utility shall be responsible for initiating modification/replacement procedures following notification that modification/replacement is necessary. Emergency work shall begin as soon as possible in order not to impose unsafe conditions on its surroundings. Should the modification/ replacement work be performed, the Owner Utility shall submit an invoice to the Attaching Utility for the actual cost of work performed within 30 calendar days.
AutoNDA by SimpleDocs
Action Required for Emergency Modification/Replacement. The Owner Utility shall be responsible for initiating modification/replacement procedures following notification. The Owner Utility shall reserve the right to perform the modification/replacement in the event that the Attaching Utility does not meet the emergency modification/replacement performance time requirement. Emergency work shall begin as soon as possible in order not to impose unsafe conditions on its surroundings. Should the modification/ replacement work be performed by the Owner Utility, the Owner Utility shall submit an invoice to the Attaching Utility for the actual cost of work performed within 30 calendar days.

Related to Action Required for Emergency Modification/Replacement

  • Installation requirements As may be further described and set forth in the Scope of services, all installation, integration, and other potentially public works construction activities which may be contemplated by Contractor, shall be performed in accordance with all applicable, laws, rules, and regulations of the District.

  • CFR PART 200 Contract Provisions Explanation Required Federal contract provisions of Federal Regulations for Contracts for contracts with ESC Region 8 and TIPS Members: The following provisions are required to be in place and agreed if the procurement is funded in any part with federal funds. The ESC Region 8 and TIPS Members are the subgrantee or Subrecipient by definition. Most of the provisions are located in 2 CFR PART 200 - Appendix II to Part 200—Contract Provisions for Non-Federal Entity Contracts Under Federal Awards at 2 CFR PART 200. Others are included within 2 CFR part 200 et al. In addition to other provisions required by the Federal agency or non-Federal entity, all contracts made by the non- Federal entity under the Federal award must contain provisions covering the following, as applicable. Contracts for more than the simplified acquisition threshold currently set at $250,000, which is the inflation adjusted amount determined by the Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council (Councils) as authorized by 41 U.S.C. 1908, must address administrative, contractual, or legal remedies in instances where contractors violate or breach contract terms, and provide for such sanctions and penalties as appropriate. Notice: Pursuant to the above, when federal funds are expended by ESC Region 8 and TIPS Members, ESC Region 8 and TIPS Members reserves all rights and privileges under the applicable laws and regulations with respect to this procurement in the event of breach of contract by either party. Does vendor agree? Yes

  • Food Service Waste Reduction Requirements Contractor shall comply with the Food Service Waste Reduction Ordinance, as set forth in San Francisco Environment Code Chapter 16, including but not limited to the remedies for noncompliance provided therein.

  • Construction Requirements (a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required. (b) Electric panel schedules must be brought up to date identifying all new circuits added. (c) All electrical outlets and lighting circuits are to be properly identified. Outlets will be labeled on back side of each cover plate. (d) All electrical and phone closets being used must have panels replaced and doors shut at the end of each day’s work. Any electrical closet that is opened with the panel exposed must have a work person present. (e) All electricians, telephone personnel, etc. will, upon completion of their respective projects, pick up and discard their trash leaving the telephone and electrical rooms clean. If this is not complied with, a clean-up will be conducted by the building janitors and the general contractor will be back-charged for this service. (f) Welding or burning with an open flame will not be done without prior approval of the Building Manager. Fire extinguishers must be on hand at all times. (g) All “anchoring” of walls or supports to the concrete are not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend. (h) All core drilling is not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend. (i) All HVAC work must be inspected by the Building Engineer. The following procedures will be followed by the general contractor: i) A preliminary inspection of the HVAC work in progress will be scheduled through the Building Office prior to the reinstallation of the ceiling grid. ii) A second inspection of the HVAC operation will also be scheduled through the Building Office and will take place with the attendance of the HVAC contractor’s Air Balance Engineer. This inspection will take place when the suite in question is ready to be air-balanced. [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION. iii) The Building Engineer will inspect the construction on a periodic basis as well. (j) All existing thermostats, ceiling tiles, lighting fixtures and air conditioning grilles shall be saved and turned over to the Building Engineer.

  • Certification Requirements The applicant will provide Vista Laboratories, Inc. with all product information for the evaluation of the product to be certified and warrant that the information provided is accurate and complete so that Vista Labs may perform the services requested. If the product was tested at an external laboratory, the applicant must provide the complete test report to Vista Labs. If the external testing facility is not ISO 17025 accredited, or does not have the proper scope, Vista Labs must determine if the test report can be used for certification activities. The applicant’s information is used to perform a product review and evaluation to determine the product’s compliance to the specific certification requested. Throughout the process, the client agrees to make claims regarding certification consistent with the scope of certification. The applicant agrees to supply the required number of product samples, to be determined by Vista Labs, to the laboratory for testing, measurement, and evaluation purposes. The client understands that certain tests may damage or destroy the sample and acknowledge that Vista Labs is not responsible for such damages. Samples will be returned only upon request by the applicant and at the applicant’s expense, after the completion of certification. Samples will be disposed of after six months if not requested for return by applicant. The product is ineligible for certification if it has been modified by the client after testing or certification. Changes to the product must be approved by Vista Laboratories. Vista Labs reserves the right to re- evaluate the product as a result of information that raises questions concerning the conformance of the product. Certified products maintain fulfilment of product requirements if the certification applies to ongoing production. If the client provides copies of the certification documents to other parties, the documents are reproduced in their entirety, or as specified in the certification scheme. In making reference to its product certification in media, such as brochures or advertisement, the client complies with the requirements of the Vista Labs or as specified by the certification scheme. The client complies with any requirements that may be prescribed in the certification scheme relating to the use of marks of conformity, and on all product correspondences and product related information. Vista Labs reserves the right to revise or withdraw the requirements as required in order to maintain conformance with FCC rules and regulations governing the product. The product may continue with certification and receive certification upon demonstration of compliance with the revised requirements, to the satisfaction of Vista Laboratories.

  • Publication Requirements Those seeking to include renderings of more than 10 images from the UND Biometrics Database in reports, papers, and other documents to be published or released must first obtain approval in writing from the UND Principal Investigator. In no case should the face images be used in a way that could cause the original subject embarrassment or mental anguish.

  • REQUIRED FOR PART 2 JOC - PRICING OF Regular Hours Coefficient What is your regular hours coefficient for the RS Means Price Book? (FAILURE TO RESPOND PROHIBITS PART 2 JOC EVALUATION)

  • Additional Termination Requirements (a) In the event the Master Servicer exercises its purchase option as provided in Section 9.01, the Trust Fund shall be terminated in accordance with the following additional requirements, unless the Trustee has been supplied with an Opinion of Counsel, at the expense of the Master Servicer, to the effect that the failure to comply with the requirements of this Section 9.03 will not (i) result in the imposition of taxes on "prohibited transactions" on any REMIC as defined in section 860F of the Code, or (ii) cause any REMIC to fail to qualify as a REMIC at any time that any Certificates are outstanding: (1) Within 90 days prior to the final Distribution Date set forth in the notice given by the Master Servicer under Section 9.02, the Master Servicer shall prepare and the Trustee, at the expense of the "tax matters person," shall adopt a plan of complete liquidation within the meaning of section 860F(a)(4) of the Code which, as evidenced by an Opinion of Counsel (which opinion shall not be an expense of the Trustee or the Tax Matters Person), meets the requirements of a qualified liquidation; and (2) Within 90 days after the time of adoption of such a plan of complete liquidation, the Trustee shall sell all of the assets of the Trust Fund to the Master Servicer for cash in accordance with Section 9.01. (b) The Trustee as agent for any REMIC hereby agrees to adopt and sign such a plan of complete liquidation upon the written request of the Master Servicer, and the receipt of the Opinion of Counsel referred to in Section 9.03(a)(1) and to take such other action in connection therewith as may be reasonably requested by the Master Servicer. (c) By their acceptance of the Certificates, the Holders thereof hereby authorize the Master Servicer to prepare and the Trustee to adopt and sign a plan of complete liquidation.

  • Compliance with Nondiscrimination Requirements During the performance of this contract, the Contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the “Contractor”), agrees as follows:

  • Application Requirements This application shall contain, as a minimum, a sketch showing the location of proposed facilities; a description, sketch, manufacturer’s brochure, etc. of the proposed facilities; and a description of the operation proposed. (11-28-90) 101. -- 199. (RESERVED)‌ 200. OPERATIONAL AGREEMENT.‌‌

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!