Active Materials and Client-Supplied Components Sample Clauses

Active Materials and Client-Supplied Components. At least 30 days before the scheduled production date, Client will deliver the Active Materials and any Client-Supplied Components to the Manufacturing Site DDP (incoterms 2010), at no cost to Patheon, in sufficient quantity to enable Patheon to manufacture the desired quantities of Product and to ship Product on the Delivery Date, if the Active Materials and/or Client-Supplied Components are not received 30 days before the scheduled production date, Patheon may delay the shipment of Product by the same number of days as the delay in receipt of the Active Materials and/or Client- Supplied Components. But if Patheon is unable to manufacture Product to meet this new shipment date due to prior third party production commitments, Patheon may delay the shipment until a later date as agreed to by the parties. All shipments of Active Material will be accompanied by certificate(s) of analysis from the Active Material manufacturer confirming the identity and purity of the Active Materials and its compliance with the Active Material specifications. For Active Materials or Client-Supplied Components which may be subject to import or export, Client agrees that its vendors and carriers will comply with applicable requirements of the U.S. Customs and Border Protection Service and the Customs Trade Partnership Against Terrorism (“C- TPAT”).
AutoNDA by SimpleDocs
Active Materials and Client-Supplied Components. At least […***…] before the scheduled production date, Client will deliver the Active Materials and any Client-Supplied Components to the Manufacturing Site DDP, in sufficient quantity to enable Patheon to manufacture the desired quantities of Product and to ship Product on the Delivery Date. Upon receipt of the Active Materials, Patheon will test all Active Materials in accordance with the provisions of the Product Agreement and in accordance with the applicable Quality Agreement. If the Active Materials and/or Client-Supplied Components are not received […***…] before the scheduled production date, Patheon may delay the shipment of Product by the same number of days as the delay in receipt of the Active Materials and/or Client-Supplied Components. But if Patheon is unable to manufacture Product to meet this new shipment date due to prior Third Party production commitments, Patheon may delay the shipment until a later date as agreed to by the Parties, but Patheon will make commercially reasonable efforts to make the shipment as soon as possible. All shipments of Active Material will be accompanied by Certificate(s) of Analysis provided by Client, confirming the identity and purity of the Active Materials and its compliance with the Active Material Specifications set forth in the Product Agreement.
Active Materials and Client-Supplied Components. At least [***] before the scheduled production date (such date to be communicated to Client by Patheon), Client will deliver the Active Materials and any Client-Supplied Components to [***], at no cost to Patheon, with any VAT paid by Client, in sufficient quantity to enable Patheon to manufacture the desired quantities of Product and to ship Product on the Delivery Date. If the Active Materials and/or Client-Supplied Components are not received [***] before the scheduled production date, Patheon may delay the shipment of Product by the same number of days as the delay in receipt of the Active Materials and/or Client-Supplied Components. But if Patheon is unable, despite using commercially reasonable efforts, to manufacture Product to meet this new shipment date due to prior third party production commitments, Patheon may 71086739_10 delay the shipment until a later date as agreed to by the Parties. All shipments of Active Material will be accompanied by certificate(s) of analysis from the Active Material manufacturer and Client, confirming the identity and purity of the Active Materials and its compliance with the Active Material Specifications. For Active Materials or Client-Supplied Components which may be subject to import or export, Client agrees that its vendors and carriers will comply with applicable requirements of the U.S. Customs and Border Protection Service and the Customs Trade Partnership Against Terrorism. If any Active Materials or Client-Supplied Components are imported, then Client will pay any applicable customs duties or VAT and act as importer of record for such imported materials in compliance with the local Customs and VAT requirements applicable in the country of importation. On the date of shipment, the API or Client-Supplied Components will conform to their specifications that Client has given to Patheon and the API and Client-Supplied Components will be adequately contained, packaged, and labeled and will conform to the affirmations of fact on the container.
Active Materials and Client-Supplied Components. At least [...***...] days before the scheduled production date, Client will deliver the Active Materials and any Client-Supplied Components to the Manufacturing Site […***…] (Incoterms 2010), at no cost to Patheon, in sufficient quantity to enable Patheon to manufacture the desired quantities of Product and to ship Product on the Delivery Date. If the Active Materials and/or Client-Supplied Components are not received […***…] days before the scheduled production date, Patheon may delay the shipment of Product by the same number of days as the delay in receipt of the Active Materials and/or Client-Supplied Components. But if Patheon is unable to manufacture Product to meet this new shipment date due to prior third party production commitments, Patheon may delay the shipment until a later date as agreed to by the parties. All shipments of Active Material will be accompanied by certificate(s) of analysis from the Active Material manufacturer and the Client, confirming the identity and purity of the Active Materials and its compliance with the Active Material specifications. At a minimum, Patheon will perform identity testing on each incoming lot of API and a full testing will be performed at least for one batch per year. Additional incoming tests to be performed on the API will be defined in the respective Product Agreement.
Active Materials and Client-Supplied Components. At least 45 days before the scheduled production date, Client will deliver the Active Materials and any Client-Supplied Components to the Manufacturing Site DDP (Incoterms 2010), at no cost to Patheon, with any VAT paid by Client, in sufficient quantity to enable Patheon to manufacture the desired quantities of Product and to ship Product on the Delivery Date. If the Active Materials and/or Client-Supplied Components are not received 45 days before the scheduled production date, Patheon may delay the shipment of Product by the same number of days as the delay in receipt of the Active Materials and/or Client-Supplied Components. If Patheon is unable to manufacture Product to meet this new shipment date due to prior third party production commitments, shipment may be delayed until a later date as agreed to by the parties; provided, that Patheon has used commercially reasonable efforts to reschedule the shipment date as close as possible to the original shipment date. All shipments of Active Material will be accompanied by certificate(s) of analysis from the Active Material manufacturer and Client, confirming the identity and purity of the Active Materials and its compliance with the Active Material specifications. For Active Materials or Client-Supplied Components which may be subject to import or export, Client agrees that its vendors and carriers will comply with applicable requirements of the U.S. Customs and Border Protection Service and the Customs Trade Partnership Against Terrorism (“C-TPAT”).
Active Materials and Client-Supplied Components. Client will at its sole cost and expense, use commercially reasonable efforts to deliver those quantities of Active Materials and Client-Supplied Components to Patheon (in accordance with Section 2.1(f)) sufficient for Patheon to manufacture the desired quantities of Products and to ship Products on the Delivery Date. If applicable, Patheon and the Client will reasonably cooperate to permit the import of the Active Materials into the United States. Client’s obligation will include obtaining the proper release of the Active Materials from U.S. Customs and the FDA. Client or Client’s designated broker will be the “Importer of Record” for Active Materials imported into the United States. The Active Materials and Client-Supplied Components will be held by Patheon on behalf of Client as set forth in this Agreement. Title to the Active Materials and Client-Supplied Components will at all times remain the property of Client. Any Active Materials and Client-Supplied Components received by Patheon will only be used by Patheon to perform the Manufacturing Services and will not be transferred to any third parties without Client’s prior written consent. Patheon will store and handle Active Materials in accordance with cGMPs and requirements applicable to a DEA Schedule II controlled substance. Patheon will store and handle Client-Supplied Components in accordance with Applicable Laws. If any of the Client-Supplied Components are lost, damaged, stolen, destroyed, or otherwise rendered unusable for their intended purpose because they were not stored or handled in accordance with the storage conditions specified by Client in writing and in accordance with Applicable Laws while in Patheon’s custody or control, Patheon will promptly pay to Client the actual replacement cost for these Client-Supplied Components.
Active Materials and Client-Supplied Components. If Patheon has advised Client of the scheduled production date, then, at least [*] days before the scheduled production date, Client will deliver the Active Materials and any Client-Supplied Components to the Manufacturing Site [*] (Incoterms 2010), at no cost to Patheon, in sufficient quantity to enable Patheon to manufacture the desired quantities of Product and to ship Product on the Delivery Date. If the Active Materials and/or Client-Supplied Components are not received [*] days before the scheduled production date, Patheon may delay the shipment
AutoNDA by SimpleDocs
Active Materials and Client-Supplied Components. Client will **** deliver the Active Materials and any Client-supplied Components to the Manufacturing Site DDP (Incoterms 2010) at least **** before the scheduled production date, at no cost to Patheon, in sufficient quantity to enable Patheon to manufacture the desired quantities of Product and to ship Product on the Delivery Date. If the Active Materials and/or Client-supplied Components are not received at least **** before the scheduled production date, Patheon will make commercially reasonable efforts to expedite analytical testing at the Client’s expense to maintain the scheduled production date. If the Active Materials and/or Client-supplied Components are not received at least **** before the scheduled production date and expedited release cannot be accomplished to maintain the scheduled production date (after use of commercially reasonable efforts by Patheon), Patheon may **** ****CERTAIN INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THE OMITTED PORTIONS. ****. ****. All shipments of Active Materials will be accompanied by certificate(s) of analysis from the Active Materials manufacturer and the Client, confirming the identity and purity of the Active Materials and its compliance with the Active Materials specifications.

Related to Active Materials and Client-Supplied Components

  • API If the Software offers integration capabilities via an API, your use of the API may be subject to additional costs or Sage specific policies and terms and conditions (which shall prevail in relation to your use of the API). You may not access or use the API in any way that could cause damage to us or the Software, or in contravention of any applicable laws. We reserve the right in our sole discretion, to: (i) update any API from time to time; (ii) place limitations around your use of any API; and (iii) deny you access to any API in the event of misuse by you or to otherwise protect our legitimate interests.

  • PRODUCT MANUFACTURER'S SUPPLIERS Only those dealers/distributors listed by the manufacturer will be considered authorized to act on behalf of the Product Manufacturer.

  • Product ACCEPTANCE Unless otherwise provided by mutual agreement of the Authorized User and the Contractor, Authorized User(s) shall have thirty (30) days from the date of delivery to accept hardware products and sixty (60) days from the date of delivery to accept all other Product. Where the Contractor is responsible for installation, acceptance shall be from completion of installation. Failure to provide notice of acceptance or rejection or a deficiency statement to the Contractor by the end of the period provided for under this clause constitutes acceptance by the Authorized User(s) as of the expiration of that period. The License Term shall be extended by the time periods allowed for trial use, testing and acceptance unless the Commissioner or Authorized User agrees to accept the Product at completion of trial use. Unless otherwise provided by mutual agreement of the Authorized User and the Contractor, Authorized User shall have the option to run testing on the Product prior to acceptance, such tests and data sets to be specified by User. Where using its own data or tests, Authorized User must have the tests or representative set of data available upon delivery. This demonstration will take the form of a documented installation test, capable of observation by the Authorized User, and shall be made part of the Contractor’s standard documentation. The test data shall remain accessible to the Authorized User after completion of the test. In the event that the documented installation test cannot be completed successfully within the specified acceptance period, and the Contractor or Product is responsible for the delay, Authorized User shall have the option to cancel the order in whole or in part, or to extend the testing period for an additional thirty (30) day increment. Authorized User shall notify Contractor of acceptance upon successful completion of the documented installation test. Such cancellation shall not give rise to any cause of action against the Authorized User for damages, loss of profits, expenses, or other remuneration of any kind. If the Authorized User elects to provide a deficiency statement specifying how the Product fails to meet the specifications within the testing period, Contractor shall have thirty (30) days to correct the deficiency, and the Authorized User shall have an additional sixty (60) days to evaluate the Product as provided herein. If the Product does not meet the specifications at the end of the extended testing period, Authorized User, upon prior written notice to Contractor, may then reject the Product and return all defective Product to Contractor, and Contractor shall refund any monies paid by the Authorized User to Contractor therefor. Costs and liabilities associated with a failure of the Product to perform in accordance with the functionality tests or product specifications during the acceptance period shall be borne fully by Contractor to the extent that said costs or liabilities shall not have been caused by negligent or willful acts or omissions of the Authorized User’s agents or employees. Said costs shall be limited to the amounts set forth in the Limitation of Liability Clause for any liability for costs incurred at the direction or recommendation of Contractor.

  • Materials and Supplies The cost of materials and supplies is allowable. Purchases should be charged at their actual prices after deducting all cash discounts, trade discounts, rebates, and allowances received. Withdrawals from general stores or stockrooms should be charged at cost under any recognized method of pricing, consistently applied. Incoming transportation charges are a proper part of materials and supply costs.

  • Product Supply 5.1 In the event that Eisai notifies Radius of its desire to purchase bulk substance of Compound from Radius, Radius shall supply Eisai with all amount of such bulk substance of Compound, which meets specifications for the Product determined by Radius in the course of its Development activities pursuant to this Agreement, required by Eisai for commercial sales of Product in Japan With respect to Eisai clinical development activities for Product in Japan, upon Eisai’s request, Radius shall supply Eisai the bulk substance of Compound for * Confidential Treatment Requested by the Registrant. Redacted Portion Filed Separately with the Commission. the conduct of the Eisai Development activities in the amounts and at the times determined by the SC, having reference to the quantity of the bulk substance of Compound required for clinical trials in Japan. Radius shall charge [*] for applicable bulk substance of Compound. Radius shall ship such bulk substance of Compound, FOB point of manufacturing. 5.2 In the event that Eisai notifies Radius of its desire to purchase Semi-Product from Radius which meets specifications determined by Radius in the course of its Development activities pursuant to this Agreement, Radius shall supply Eisai with all amount of Semi-Product required by Eisai for commercial sales of Product in Japan. With respect to Eisai clinical development activities for Product in Japan, upon Eisai’s request, Radius shall supply Eisai Semi-Product for the conduct of the Eisai Development activities in the amounts and at the times determined by the SC, having reference to the quantity of Semi-Product required for clinical trials in Japan. Radius shall charge [*] for Semi-Product. Radius shall ship such Semi-Product, FOB point of manufacturing. 5.3 The Parties agree that they shall, in good faith, discuss, negotiate and execute necessary agreements containing mutually acceptable terms, including but not limited to, a supply agreement for either bulk substance of Compound or Semi-Product as well as a quality control agreement of either bulk substance of Compound or Semi-Product, in the event that Eisai notifies Radius as set forth in Article 5.1 or 5.2. 5.4 As manufacturer of the Product, Radius shall be responsible for: (a) the control of the quality of the Product promoted and sold under the Radius trademarks; as provided in Article 2.3; and (b) ensuring that all bulk substance of Compound or Semi-Product supplied to Eisai pursuant to this Article 5 shall be manufactured in accordance with the applicable good manufacturing practices (GMP) and shall meet the then applicable specifications for the bulk substance of Compound or Semi-Product; and Radius warrants that all bulk substance of Compound or Semi-Product supplied to Eisai pursuant to this Article 5 shall be manufactured in accordance with the applicable GMP and * Confidential Treatment Requested by the Registrant. Redacted Portion Filed Separately with the Commission. shall meet the then applicable specifications for the bulk substance of Compound or Semi-Product and will be free from defects in material and workmanship. Radius shall resolve any product liability issues in the Territory relating to the Product and shall resolve any product liability issues in Japan relating to the Product or the bulk substance of Compound or Semi-Product, as the case may be, supplied to Eisai pursuant to this Article 5 in the event and to the extent related to a breach of the warranty set forth in Article 5.4(b) at its own expense and subject to Article 5.5. 5.5 Radius’ obligations with respect to product liability in the Territory and Japan shall include the following responsibilities, each to be taken at Radius’ expense: (a) Radius shall report, at its expense, to appropriate authorities, in accordance with local requirements, all adverse events related to use of the Product in the Territory or Japan. Eisai shall provide to Radius, upon Radius’ request, reasonable assistance in connection with the reporting of all of adverse events, responding to safety queries and assessing safety issues, in each case, to the extent related to the Product in Japan. Adverse events shall be recorded in a single, centralized database, which shall be held and owned by Radius. Radius will provide, upon request by Eisai, any safety information in Radius’ control and reasonably required by Eisai in connection with the development and commercialization of the Product in Japan and all reasonable assistance in responding to safety queries related to the Product and in assessing safety issues related to the Product in Japan. Details of safety reporting activities relating to the Product will be addressed in a pharmacovigilance contract, which the Parties shall enter into after the Effective Date. (b) In the event that (i) Radius determines that an event, incident, or circumstance may result in the need for a recall or other removal of the Product or any lot or lots thereof from the market; (ii) any regulatory authority in the Territory threatens to remove a Product from the market; or (iii) any regulatory authority in the Territory requires distribution of a “Dear Doctor” letter or its equivalent regarding the use of Product, Radius shall promptly advise Eisai in writing, and shall provide Eisai with copies of all relevant correspondence, notices and the like. Notwithstanding anything the contrary herein, Radius shall have final authority to make all decisions relating to any recall, market withdrawal or other corrective action with respect to the Product in the Territory. After establishing SC pursuant to Article 3.5, all decisions relating to any recall, market withdrawal or other corrective action with respect to the Product shall be decided by the SC as set forth in Article 3.6; provided that in the event that the Parties take different positions with respect to recall, market withdrawal or other corrective action with respect to the Product, then Radius shall have the right to cease supplying bulk substance of Compound or Semi-Product to Eisai for Japan if, after good faith discussions with Eisai, Radius reasonably believes that that continued supply to Eisai exposes Radius to liability as a result of its decision with respect to the Territory. If Radius elects to cease supply, it will terminate supply in an orderly manner, as soon as practical and in accordance with a schedule agreed to by Eisai and Radius. In the event of a recall, market withdrawal or other corrective action with respect to the Product in Japan, and at Radius’ request, Eisai shall provide reasonable assistance to Radius, at Radius’ cost and expense, in conducting any such recall, market withdrawal or other corrective action with respect to the Product in Japan. 5.6 THE WARRANTY IN SECTION 5.4(b) IS IN LIEU OF ANY OTHER WARRANTY WITH RESPECT TO THE PRODUCT, BULK SUBSTANCE OF COMPOUND OR SEMI-PRODUCT SUPPLIED BY RADIUS HEREUNDER, WHETHER EXPRESS OR IMPLIED, WRITTEN OR ORAL (INCLUDING, WITHOUT LIMITATION, ANY WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE).

  • Third Party Materials The Application may display, include, or make available third-party content (including data, information, applications, and other products, services, and/or materials) or provide links to third-party websites or services, including through third- party advertising ("Third-Party Materials"). You acknowledge and agree that Company is not responsible for Third-Party Materials, including their accuracy, completeness, timeliness, validity, copyright compliance, legality, decency, quality, or any other aspect thereof. Company does not assume and will not have any liability or responsibility to you or any other person or entity for any Third-Party Materials. Third-Party Materials and links thereto are provided solely as a convenience to you, and you access and use them entirely at your own risk and subject to such third parties' terms and conditions.

  • Products Products available under this Contract are limited to Software, including Software as a Service, products and related products as specified in Appendix C, Pricing Index. Vendor may incorporate changes to their product offering; however, any changes must be within the scope of products awarded based on the posting described in Section 1.B above. Vendor may not add a manufacturer’s product line which was not included in the Vendor’s response to the solicitation described in Section 1.B above.

  • Defective Products A defective product may be returned to PRECISIONARY INSTRUMENTS within thirty (30) days of the delivery date for a refund of the original purchase price with the following amendments/fees. To return a defective product, please contact our Customer Service Department and follow the Return of Products Instructions below.

  • Third Party Components The Products and Services may contain third party components (including open source software) subject to separate license agreements. To the limited extent a third party license expressly supersedes this XXXX, such third party license governs Customer’s use of that third party component.

  • Product Labeling The labeling of all Licensed Products sold or offered for sale under this Agreement shall expressly state that the Licensed Product is manufactured under a license from the Medicines Patent Pool.