Additional Study Assessments Sample Clauses

Additional Study Assessments. Additional effectiveness assessments will be conducted throughout the course of the study. Refer to the MOP and Table 3-1 for details on each of these assessments.
AutoNDA by SimpleDocs

Related to Additional Study Assessments

  • Conformity Assessment 1. The Parties recognize that a broad range of mechanisms exists to facilitate the acceptance of conformity assessment procedures and results thereby, including:

  • Self-Assessment (a) Subject to clause 4.4(b), for Services that are Self-Assessable:

  • Diagnostic Assessment 6.3.1 Boards shall provide a list of pre-approved assessment tools consistent with their Board improvement plan for student achievement and which is compliant with Ministry of Education PPM (PPM 155: Diagnostic Assessment in Support of Student Learning, date of issue January 7, 2013).

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Review of assessment The assessment of the applicable percentage should be subject to annual review or earlier on the basis of a reasonable request for such a review. The process of review shall be in accordance with the procedures for assessing capacity under the Supported Wage System.

  • Feasibility Study Buyer will, at Buyer's expense and within ____ days from Effective Date ("Feasibility Study Period"), determine whether the Property is suitable, in Buyer's sole and absolute discretion, for ___________________ use. During the Feasibility Study Period, Buyer may conduct a Phase I environmental assessment and any other tests, analyses, surveys and investigations ("Inspections") that Buyer deems necessary to determine to Buyer's satisfaction the Property's engineering, architectural and environmental properties; zoning and zoning restrictions; subdivision statutes; soil and grade; availability of access public roads, water, and other utilities; consistency with local, state and regional growth management plans, availability of permits, government approvals, and licenses; and other inspections that Buyer deems appropriate to determine the Property's suitability for the Buyer's intended use. If the Property must be rezoned, Buyer will obtain the rezoning from the appropriatx xxxernment agencies. Seller will sign all documents Buyer is required to file in connection with development or rezoning approvals. Seller gives Buyer, its agents, contractors and assigns, the right to enter the Property at any time during the Feasibility Study Period for the purpose of conducting inspections; provided, however, that Buyer, its agents, contractors and assigns enter the Property and conduct inspections at their own risk. Buyer will indemnify and hold Seller harmless from xxxxes, damages, costs, claims and expenses of any nature, including attorney's fees, expenses and liability incurred in application for rezoning or related proceedings, and from liability to any person, arising from the conduct of any and all inspections of any work authorized by Buyer. Buyer will not engage in any activity that xxxxx result in a construction lien being filed against the Property without Seller's prior written consent. If this transaction does not close, Buyer will, at Buyer's expense, (1) repair all damages to the Property resulting from the Inspections and return the Property to the condition it was in prior to conduct of the Inspections, and (2) release to Seller all reports and other work generated as a result of the Inspections. Buyer will deliver written notice to Seller prior to the expiration of the Feasibility Study Period of Buyer's determination of whether or not the Properxx xx acceptable. Buyer's failure to comply with this notice requirement will constitute acceptance of the Property as suitable for Buyer's intended use in its "as is" condition. If the Property is unacceptable to Buyer and written notice of this fact is timely delivered to Seller, this Contract will be deemed terminated as of the day after the Feasibility Study period ends and Buyer's deposit(s) will be returned after Escrow Axxxx receives proper authorization form all interested parties.

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in xxxxx, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.

  • Evaluation Cycle: Formative Assessment A) A specific purpose for evaluation is to promote student learning, growth and achievement by providing Educators with feedback for improvement. Evaluators are expected to make frequent unannounced visits to classrooms. Evaluators are expected to give targeted constructive feedback to Educators based on their observations of practice, examination of artifacts, and analysis of multiple measures of student learning, growth and achievement in relation to the Standards and Indicators of Effective Teaching Practice.

  • Study An application for leave of absence for professional study must be supported by a written statement indicating what study or research is to be undertaken, or, if applicable, what subjects are to be studied and at what institutions.

  • Security Assessments Upon advance written notice by the JBE, Contractor agrees that the JBE shall have reasonable access to Contractor’s operational documentation, records, logs, and databases that relate to data security and the Contractor’s Information Security Program. Upon the JBE’s request, Contractor shall, at its expense, perform, or cause to have performed an assessment of Contractor’s compliance with its privacy and data security obligations. Contractor shall provide to the JBE the results, including any findings and recommendations made by Contractor’s assessors, of such assessment, and, at its expense, take any corrective actions.

Time is Money Join Law Insider Premium to draft better contracts faster.