Phase II. A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data...
Phase II. Phase II shall consist of the periodic review of the documents prepared by the Design Professional in coordination with the CM/GC to ensure that the Construction Documents are proper and correct developments of the Using Agency’s Program. Major Deliverables: Periodic Design Compatibility Reviews Periodic Cost Analysis Updates Review/recommendation on DP invoices Professional Services: Engineering and design review services Budget and costing services Project management services
Phase II. The CONSULTANT shall physically re-inspect all bridges in accordance with time frames outlined in APPENDIX C (Schedule) and provide the LPA with one (1) hard copy of draft report and two (2) hard copies of the final report, accompanied by necessary maps, evaluations and recommendations. The CONSULTANT shall submit one (1) copy of the Final Report to ERMS, County Bridge Inspection Reports. The title page of each copy of the revised report shall include the signature, date and seal of the Professional Engineer in charge of the bridge inspection. Revised report and master list composition and preparation shall be in accordance with the requirements of PHASE I along with the following additional information:
Phase II. Phase II of the Work shall consist of the remainder of the Work as described in Exhibit A, to commence upon issuance of a notice (the "Full Notice to Proceed") and to continue until Final Completion unless the Agreement is earlier terminated in accordance with Article 22. The Parties acknowledge that the Full Notice to Proceed will not be issued unless and until the COL is received.
Phase II. Upon commencement of the Phase II, Contractor agrees to cause the Project to be constructed and installed in accordance with the General Construction Provisions which are attached hereto as Exhibit C. The Contractor agrees that it will cause the construction and installation of the Project to be diligently performed. The District and the Contractor may approve changes in the Plans and Specifications for the Project as provided in the Construction Provisions. The Contractor will cooperate at all times with the District in bringing about the timely completion of the Project. The definition and description of the Project contained herein may be amended by the District from time to time as provided in the Construction Provisions, Extra Work/Modifications.
Phase II. If the Contractor elects to enter Phase II, then during such Phase II of the Exploration Period the Contractor shall drill one (1) well into the Campanian/Santonian or to a total depth of five thousand, five hundred (5,500) meters sub-sea in the Contract Area.
Phase II. The parties acknowledge that this Agreement is not exclusive and GPPC shall have the right to provide consulting services regarding the marketing of the DCC services of Member, GPPC, any of GPPC’s Affiliates, or of any third party, subject to the provisions of Section 5.4 above. During the Term of this Agreement, GPPC may choose to develop the functionality of its own processing platform, or use a third person’s processing platform to enable GPPC to support certain functions in the clearing and settlement of DCC Transactions (“Phase II”). At such time as it is ready to begin implementing Phase II, GPPC shall inform Planet Payment of its plans and the parties shall discuss how Phase II may be integrated into the Acquirer Program. Nothing herein shall prohibit GPPC from implementing Phase II, and Planet Payment agrees that it will use its commercially reasonable efforts to provide assistance to GPPC to implement Phase II, provided that Planet Payment shall not have any obligation whatsoever to assist GPPC in any way in specifying, designing or implementing functions similar to any of Planet Payment’s functions provided hereunder relating to the conversion, calculation, reporting or reconciliation of cross-currency Transactions. Nothing herein shall oblige Planet Payment to disclose, transfer or license any of its IP to GPPC for the purposes of Phase II. Planet Payment shall not charge GPPC for such assistance, unless GPPC requests modifications or enhancements to the Planet Payment Platform to facilitate Phase II, in which case Planet Payment shall only charge GPPC for its actual and out of pocket costs incurred in connection with such modifications or enhancements. The parties shall use good faith efforts to modify the parties’ respective obligations under this Agreement relating to processing of Transactions (but without any change to their respective Revenue Shares) to reflect the reallocation of their respective functions following implementation of Phase II.
Phase II. As used herein, “Phase II” shall mean design and development, including (i) delivery of breadboard instruments; and (ii) delivery of LSR Instrument Prototypes.
Phase II. Commence Phase II trials of the Licensed Products by [ ]* but in no event later than [ ]*.
Phase II. If the Coordinating Committee has determined, based upon Phase I monitoring and evaluation or Phase III periodic monitoring, that Juvenile Project Survival is less than 91% or Juvenile Dam Passage Survival (measured or calculated) is less than 95%, the District shall move to Phase II for that Plan Species.