Agricultural Pump Flow Metering Program Sample Clauses

Agricultural Pump Flow Metering Program. Identify the temporal and spatial data requirements for the agricultural pump flow metering program. Identify and prioritize metering locations for inclusion in the agricultural pump metering program. Develop SOPs for agricultural pump flow metering, including upgrades to current systems and for new installations. Specify instrumentation and equipment.
AutoNDA by SimpleDocs
Agricultural Pump Flow Metering Program. Contractor will review the existing flow metering network to identify and understand the temporal and spatial data requirements for the agricultural pump flow metering program. The methods and equipment being used for metering will be reviewed and recommendations for improvements and/or expansion of data collection will be made to help assure accuracy is being maintained and the needs of the GSP are being met. Contractor will identify and prioritize metering locations for inclusion in the agricultural pump metering program. Meter equipment/installation standards and standard operating procedures (SOPs) will be provided by Contractor through engineered drawings, details, and specifications, inspections, and field verifications for District implementation of meter replacement program. Instrumentation and equipment will be specified. Implementation of the Agricultural Pump Flow Metering Program (Flow Meter Replacement Project) is included in Task 6.3. Deliverables: • Site Visit Summary Documentation • Engineering Packet including Drawings, Details, and Specifications

Related to Agricultural Pump Flow Metering Program

  • Computer Equipment Recycling Program If this Contract is for the purchase or lease of computer equipment, then Contractor certifies that it is in compliance with Subchapter Y, Chapter 361 of the Texas Health and Safety Code related to the Computer Equipment Recycling Program and the Texas Commission on Environmental Quality rules in 30 TAC Chapter 328.

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • Television Equipment Recycling Program If this Contract is for the purchase or lease of covered television equipment, then Contractor certifies that it is compliance with Subchapter Z, Chapter 361 of the Texas Health and Safety Code related to the Television Equipment Recycling Program.

  • Substance Abuse Program The SFMTA General Manager or designee will manage all aspects of the FTA-mandated Substance Abuse Program. He/she shall have appointing and removal authority over all personnel working for the Substance Abuse Program personnel, and shall be responsible for the supervision of the SAP.

  • TOOL STORAGE 1. A company shall provide on all construction jobs in towns and cities, and elsewhere where reasonably necessary and practicable (or if requested buy the employee), a suitable and secure waterproof lock-up solely for the purpose of storing employees’ tools, and on multi-storey and major projects the company shall provide, where possible, a suitable lock-up for employees’ tools within a reasonable distance of the work area of large groups of employees.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!