Aim of Task 2 Sample Clauses

Aim of Task 2. 2 In order to gain knowledge about cascading effects in past events, it is necessary to use a systematic and structured method for description and analysis. Such a method was the delivery of Task 2.1. The aim of Task 2.2, in accordance with the DoW of the CascEff project, is to apply the developed methodology on selected past events with cascading effects and give a review of cascading effects in these events. The aim of Task 2.3 is then to investigate additional cases and to construct a database with the data gained by applying the method. It should be noted that the process used for developing the method is based on an iterative process (see e.g. Checkland, 1993) in accordance with Deliverable 2.1, see Figure 1.1. Hence by applying the method in more cases studies during Task 2.2, the method has been slightly modified in the light of applications and evaluations, which is further described in Section 2.3. Create method Use method Modify method Evaluate method Figure 1.1. The iterative method development process (Adapted from Checkland (1993)).
AutoNDA by SimpleDocs
Aim of Task 2. 1‌ In order to gain knowledge about cascading effects, a systematic and structured methodology for describing and analysing past incidents involving cascading effects needs to be developed, which is the aim of Task 2.1. From the DoW of the CascEff-project, the goal of Task 2.1 is to develop a methodology to study past incidents involving cascading effects which will be applicable to incidents where multi-sectorial and trans-boundary consequences have arisen. An important part of this methodology should also be to enable capturing conditions that enable, aggregate or mitigate the cascading effects. This methodology should then be used in Task 2.2 and 2.3 to study and analyse past incidents.

Related to Aim of Task 2

  • Přetrvávající platnost Tento odstavec 1.3 “Zdravotní záznamy a Studijní data a údaje” zůstane závazný i v případě zániku platnosti či vypršení platnosti této Smlouvy.

  • Přetrvající platnost This Section 3 “

  • Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Geotechnical Engineer « »« » « » « » « » « »

  • NASPO ValuePoint eMarket Center a. In July 2011, NASPO ValuePoint entered into a multi-year agreement with SciQuest, Inc. whereby SciQuest will provide certain electronic catalog hosting and management services to enable eligible NASPO ValuePoint’s customers to access a central online website to view and/or shop the goods and services available from existing NASPO ValuePoint Cooperative Contracts. The central online website is referred to as the NASPO ValuePoint eMarket Center.

  • Civil Engineer « »« » « » « » « » « »

  • Construction Phase Services 3.1.1 – Basic Construction Services

Time is Money Join Law Insider Premium to draft better contracts faster.