AIR CONDITIONING AND HEATING NOTE Sample Clauses

AIR CONDITIONING AND HEATING NOTE. Coverage available on Heating and Air Conditioning units up to a 5-ton capacity. AHS will pay up to $1,500 per contract term for access, diagnosis and repair or replacement of any geothermal and/ or water source heat pumps, glycol, hot water, or steam circulating system. Where covered repairs require access to Air Conditioning and Heating ductwork, AHS will provide access to ductwork only through unobstructed walls, ceilings or floors, and will return access openings to a rough finish. 1. AIR CONDITIONING INCLUDING DUCTWORK COVERED: All components and parts of the following air conditioning systems: Ducted central electric split and package units – Geothermal – Wall air conditioners – Mini-splits. With regard to ductwork, except as otherwise noted herein, the following are covered: Plenums – Dampers – Damper-only controls – Leaks or breaks in ductwork (sheet metal, duct board, and flex duct including vapor barrier) from heating and/or air conditioning unit(s) including registers or grills. NOT COVERED: Outside or underground piping, well pump, and well pump components for geothermal and/or water source heat pump – Window units – Water towers – Chillers, chiller components, and water lines – Legally mandated diagnostic testing when replacing heating or cooling equipment.
AutoNDA by SimpleDocs

Related to AIR CONDITIONING AND HEATING NOTE

  • Heating, Ventilating and Air Conditioning General Office Area: The building shall be equipped with a combination heating, ventilation and air conditioning system. The system shall have ducted supply and return air. The space above the ceiling shall not be used as a supply or return plenum. The systems shall be sized in accordance with the

  • Heating and Air Conditioning Xxxxxx agrees to furnish to Lessee heating and air conditioning equipment and maintain same in satisfactory operating condition at all times for the Premises during the term of the Lease at the expense of Lessor. Xxxxxx agrees that thermostats in the Premises will be set to maintain an average zone temperature of 75 degrees Fahrenheit during the heating and cooling seasons.

  • Heating, Ventilation and Air Conditioning Landlord shall furnish to the Premises heating, ventilation and air-conditioning (“HVAC”) in accordance with the Design Standards set forth in Exhibit D during Ordinary Business Hours. Landlord shall have access to all air-cooling, fan, ventilating and machine rooms and electrical closets and all other mechanical installations of Landlord (collectively, “Mechanical Installations”), and Tenant shall not construct partitions or other obstructions which may interfere with Landlord’s access thereto or the moving of Landlord’s equipment to and from the Mechanical Installations. No Tenant Party shall at any time enter the Mechanical Installations or tamper with, adjust, or otherwise affect such Mechanical Installations. Landlord shall not be responsible if the HVAC System fails to provide cooled or heated air, as the case may be, to the Premises in accordance with the Design Standards by reason of (i) any equipment installed by, for or on behalf of Tenant, which has an electrical load in excess of the average electrical load and human occupancy factors for the HVAC System as designed, or (ii) any rearrangement of partitioning or other Alterations made or performed by, for or on behalf of Tenant. Tenant shall install, if missing, blinds or shades on all windows, which blinds and shades shall be subject to Landlord’s approval, and shall keep operable windows in the Premises closed, and lower the blinds when necessary because of the sun’s position, whenever the HVAC System is in operation or as and when required by any Requirement. Tenant shall cooperate with Landlord and shall abide by the rules and regulations which Landlord may reasonably prescribe for the proper functioning and protection of the HVAC System. Tenant acknowledges that the server room in the Premises currently has three heat pumps installed, being two 4-ton units, and one 2.5-ton unit (the “Existing Heat Pumps”). The 2.5-ton unit is currently connected and operational. Tenant shall determine whether it is satisfied with the condition of the Existing Heat Pumps and Landlord shall not have any responsibility or liability for the condition, operation, maintenance, repair or replacement of the Existing Heat Pumps. Tenant may operate the Existing Heat Pumps. Tenant shall be responsible for, and pay directly for, all necessary maintenance and repairs to the Existing Heat Pumps. Tenant shall reimburse Landlord monthly for the cost of all utility services used to operate the Existing Heat Pumps within 10 Business Days after receipt of Landlord’s invoice for such amount. Landlord may measure Tenant’s usage of such utility services by either a sub-meter or by other reasonable methods such as by temporary check meters or by survey. Tenant, at its cost, may replace the Existing Heat Pumps with one or more new heat pumps, provided, however, that the capacity of such replacement heat pump(s) shall not exceed the 10.5-ton capacity cooling capacity of the Existing Heat Pumps.

  • Air Conditioning If the Apartment has been provided with a ledge for split air conditioning system with suitable provision for keeping outdoor units of the AC system and also the route to take refrigerant piping, which the Allottee shall have to strictly follow while installing AC units

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

  • Heating The Hirer shall ensure that no unauthorised heating appliances shall be used on the premises when open to the public without the consent of the management committee. Portable Liquefied Propane Gas (LPG) heating appliances shall not be used.

  • Sprinkler System If there now is or shall be installed in said building a "sprinkler system" the Tenant agrees to keep the appliances thereto in the demised premises in repair and good working condition, and if the New York Board of Fire Underwriters or the New York Fire Insurance Exchange or any bureau, department or official of the State or local government requires or recommends that any changes, modifications, alterations or additional sprinkler heads or other equipment be made or supplied by reason of the Tenant's business, or the location of partitions, trade fixtures, or other contents of the demised premises, or if such changes, modifications, alterations, additional sprinkler heads or other equipment in the demised premises are necessary to prevent the imposition of a penalty or charge against the full allowance for a sprinkler system in the fire insurance rate as fixed by said Exchange or by any fire insurance company, the Tenant will at the Tenant's own expense, promptly make and supply such changes, modifications, alterations, additional sprinkler head or other equipment. As additional rent hereunder the Tenant will pay to the Landlord, annually in advance, throughout the term 100%, toward the contract price for sprinkler supervisory service.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Ventilation Where noxious or poisonous gases may accumulate, the City shall provide proper protection and ventilation. Proper lighting and ventilation shall be provided for all enclosed working spaces. All work in enclosed and confined spaces shall be performed in accordance with applicable Federal, State and local regulations. Spray painting shall be done only by qualified painters.

  • Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (000) 000-0000. The irrigation system shall be designed, and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!