AIRCRAFT TYPE AND COEFFICIENT Sample Clauses

AIRCRAFT TYPE AND COEFFICIENT. Type of Aircraft Aircraft Coefficient Formula (Units) B747 3.00 A330 2.00 B777 1.90 A300 1.60 B757/A330-200/B737-900ER 1.50 A310/A320 1.25 B737-800 1.10 B727/B737-400?MD82/A319 1.00 YAK-42D 0.80 B737-200/300/500/F100 0.70 F28-4000 0.60 BAE-146/F70 0.50 F28-1000 0.45 ATR72/MA 60 0.40 F50 0.35 F27 0.30 BN-2/DHC-6 0.15 Iran
AutoNDA by SimpleDocs

Related to AIRCRAFT TYPE AND COEFFICIENT

  • TECHNICAL TASKS Products that require a draft version are indicated by marking “(draft and final)” after the product name in the “Products” section of the task/subtask. If “(draft and final)” does not appear after the product name, only a final version of the product is required. Subtask 1.1 (Products) describes the procedure for submitting products to the CAM.

  • Aircraft This peril includes self-propelled missiles and spacecraft.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Trunk Group Architecture and Traffic Routing The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows:

  • Check Meters Developer, at its option and expense, may install and operate, on its premises and on its side of the Point of Interconnection, one or more check meters to check Connecting Transmission Owner’s meters. Such check meters shall be for check purposes only and shall not be used for the measurement of power flows for purposes of this Agreement, except as provided in Article 7.4 below. The check meters shall be subject at all reasonable times to inspection and examination by Connecting Transmission Owner or its designee. The installation, operation and maintenance thereof shall be performed entirely by Developer in accordance with Good Utility Practice.

  • Spare Parts 14.1 As specified, the supplier may be required to provide any or all of the following materials, notifications, and information pertaining to spare parts manufactured or distributed by the supplier:

Time is Money Join Law Insider Premium to draft better contracts faster.