All Record Documents, Shop Drawings Sample Clauses

All Record Documents, Shop Drawings and other plans or drawings prepared or submitted by XXXX shall include the following language: “These plans are for official use only and may not be shared with others except as required to fulfill the obligations of the Street Maintenance Program 2011 Project Agreement with the City of Flagstaff.”
AutoNDA by SimpleDocs

Related to All Record Documents, Shop Drawings

  • Record Documents Contractor shall maintain in a safe place at the Site one record copy in hard form or electronically, as preferred by the Owner, of all Drawings, Specifications, Addenda, Written Amendments, Change Orders, Work Change Directives; Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved Samples and a counterpart of all approved Shop Drawings will be available to Architect for reference.

  • Record Drawings A final set of drawings prepared by the Architect that incorporates all changes from all As- Builts, sketches, details, and clarifications.

  • Shop Drawings All drawings, prints, diagrams, illustrations, brochures, schedules, and other data that are prepared by Developer, a subcontractor, manufacturer, supplier, or distributor, that illustrate how specific portions of the Work shall be fabricated or installed.

  • PAYEE DATA RECORD FORM STD 204: This form must be completed by all contractors that are not another state agency or other governmental entity.

  • REVIEW OF CONTRACT DOCUMENTS 4.2.1 The Contractor shall carefully study and compare the Contract Documents and shall immediately report in writing to the Architect and the State any error, inconsistency or omission he may discover. The Contractor shall not be liable to the State or the Architect for any damage resulting from any such errors, inconsistencies or omissions in the Contract Documents. The Contractor shall perform no portion of the Work at any time without Contract Documents or, where required, approved Shop Drawings, Product Data or Samples for such portion of the Work.

  • Quality control records and Documents The Contractor shall hand over a copy of all its quality control records and documents to the Authority’s Engineer before the Completion Certificate is issued pursuant to Clause 12.2. The Contractor shall submit Road Signage Plans to the Authority Engineer for approval at least 6 (six) months prior to expected completion of Project Highway.

  • OGS Contract Documents This Centralized Contract is composed of the following documents:  The Contract (that portion preceding the signatures)  Appendix A - Standard Clauses for New York State Contracts (January 2014)  Appendix B - General Specifications January 2015 22772 Project Based Information Technology Consulting (Statewide)  Appendix C - Contract Modification Procedure  Appendix D – Pricing Schedule  Appendix E – Report of Contract Purchases  Appendix F – Project Based Information Technology Consulting Services Processes and Forms o Attachment 1- Mini-Bid Template o Attachment 2- How to Use This Contract o Attachment 3- Enhancement Request Template o Attachment 4- No Cost Change Request Template o Attachment 5- Mini-Bid Participation Interest Template  Appendix G – Contractor and OGS Information

  • Personnel Record Agencies should reimburse the employee using an employee Expense Reimbursement Document. Then the agency’s Payroll staff should do a one-time override using DBA code 5700 for qualified (non-taxable) expenses and/or DBA code 5800 for non- qualified (taxable) expenses. Using these DBA codes does not create additional pay for the employee, but correctly records these amounts for inclusion on the employee’s W-2. A memo(s) signed by both the agency and the employee, agreeing to the amount of moving expenses to be paid and the portion of which is taxable, shall be placed in the employee’s personnel file.

  • Shop Drawings and Samples a. Record date of receipt of Samples and approved Shop Drawings.

  • INTENT OF CONTRACT DOCUMENTS 1.1 It is the intent of the Contract Documents to describe a functionally complete Project (or portion thereof) to be constructed in accordance with the Contract Documents. Any work, materials or equipment that may reasonably be inferred from the Contract Documents as being required to produce the intended result shall be supplied whether or not specifically called for. When words which have a well-known technical or trade meaning are used to describe work, materials or equipment, such words shall be interpreted in accordance with that meaning. Reference to standard specifications, manuals or codes of any technical society, organization or association or to the laws or regulations of any governmental authority having jurisdiction over the Project, whether such reference be specific or by implication, shall mean the latest standard specification, manual, code, law or regulation in effect at the time the Work is performed, except as may be otherwise specifically stated herein.

Time is Money Join Law Insider Premium to draft better contracts faster.