For more information visit our privacy policy.Noise The Hirer shall ensure that the minimum of noise is made on arrival and departure, particularly late at night and early in the morning. The Hirer shall, if using sound amplification equipment, make use of any noise limitation device provided at the premises and comply with any other licensing condition for the premises.
Noise Abatement Contractor shall operate, conduct, or construct without violating the City’s Noise Abatement Ordinance codified in the SDMC.
Pressure The System user is not entitled to deliver natural gas to Gas Connect Austria at the Entry Point Überackern 7-fields at a pressure of below 64 bar. Normal cubic meter (Nm³) is a cubic meter of natural gas at 273.15 K (= 0°C) and 101,325 kPa (=1.01325 bara). The natural gas delivered by the System User at the Entry Point Xxxxxxxxxx for transportation must be in line with the following chemical and physical specifications:
Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.
Smoke Free Environment The Lessor shall make all parts of the leased premise smoke-free. "
Abnormally Low Tenders 35.1 An Abnormally Low Tender is one where the Tender price, in combination with other constituent elements of the Tender, appears unreasonably low to the extent that the Tender price raises material concerns with the Procuring Entity as to the capability of the Tenderer to perform the Contract for the offered Tender price. 35.2 In the event of identification of a potentially Abnormally Low Tender by the evaluation committee, the Procuring Entity shall seek written clarification from the Tenderer, including a detailed price analyses of its Tender price in relation to the subject matter of the contract, scope, delivery schedule, allocation of risks and responsibilities and any other requirements of the tendering document. 35.3 After evaluation of the price analysis, in the event that the Procuring Entity determines that the Tenderer has failed to demonstrate its capability to perform the contract for the offered Tender price, the Procuring Entity shall reject the Tender.
Explosives Explosives or other highly flammable substances shall not be stored or used on Railroad's property without the prior written approval of Railroad.
Spares/bunkers, etc The Sellers shall deliver the Vessel to the Buyers with everything belonging to her on board and on shore. All spare parts and spare equipment including spare tail-end shaft(s) and/or spare propeller(s)/propeller blade(s), if any, belonging to the Vessel at the time of inspection used or unused, whether on board or not shall become the Buyers’ property, but spares on order are to be excluded. Forwarding charges, if any, shall be for the Buyers’ account. The Sellers are not required to replace spare parts including spare tail-end shaft(s) and spare propeller(s)/propeller blade(s) which are taken out of spare and used as replacement prior to delivery, but the replaced items shall be the property of the Buyers. The radio installation and navigational equipment shall be included in the sale without extra payment if they are the property of the Sellers. Unused stores and provisions shall be included in the sale and be taken over by the Buyers without extra payment. The Sellers have the right to take ashore crockery, plates, cutlery, linen and other articles bearing the Sellers’ flag or name, provided they replace same with similar unmarked items. Library, forms, etc., exclusively for use in the Sellers’ vessel(s), shall be excluded without compensation. Captain’s, Officers’ and Crew’s personal belongings including the slop chest are to be excluded from the sale, as well as the following additional items (including items on hire): The Buyers shall take over the remaining bunkers and unused lubricating oils in storage tanks and sealed drums and pay the current net market price (excluding barging expenses) at the port and date of delivery of the Vessel. Payment under this Clause shall be made at the same time and place and in the same currency as the Purchase Price.
Inclement Weather 16.1 The parties are committed to working together to minimize the impact of inclement weather. The employer will ensure reasonable allowance is included in contracts taking into account historic weather conditions and forecast rainfall. 16.2 Inclement weather means the existence of rain or abnormal climatic conditions (whether hail, extreme cold, high wind, severe dust storm, extreme heat (as defined in clause 14), poor air quality (as defined in clause 15), or the like or any combination of these conditions) where it is not reasonable or it is unsafe for employees to continue working in those conditions. 16.3 The employer or its representative, when requested by the employees or their representative, must confer within a reasonable time (which does not exceed 60 minutes) for the purpose of determining whether or not the conditions referred to in clause 16.2 apply. 16.4 The time work stops due to inclement weather and the resumption of work after a period of inclement weather has ended will be recorded by the employer. 16.5 When inclement weather conditions exist, an affected employee is not required to start or continue to work where it is unreasonable or unsafe to do so. In cases where emergency work is required or it is necessary to complete a concrete pour already commenced to a practical stage, work may occur or continue provided that such work does not give rise to a reasonable concern on the part of an employee undertaking the work of an imminent risk to their health or safety. 16.6 Where emergency work or a concrete pour is completed in accordance with clause 16.5, work will be paid at the rate of 200% of the ordinary hourly rate calculated to the next hour, and in the case of wet weather, the employee will be provided with adequate wet weather gear. If an employee’s clothes become wet as a result of working in the rain the employee will be allowed to go home for the remainder of the day without loss of pay. 16.7 Where an employee is not able to perform any work at any location because of inclement weather, the employee will receive payment at the ordinary hourly rate for ordinary hours. Payment for time lost due to inclement weather is subject to a maximum of 32 hours pay in any 4-week period for each employee. Payment is subject to adherence to the terms of clause 16. 16.8 An employee working on a Job Share arrangement pursuant to clause 30—Job Share, that is affected by inclement weather, will be entitled to payment from the 32-hour inclement weather bank on a pro rata basis. 16.9 Employees accumulated inclement weather bank shall not be deducted whilst they remain on site. 16.10 Inclement weather occurring during overtime will not be taken into account for the purposes of clause 16 and employees will not be entitled to any payment for stoppages because of inclement weather that occurs outside of ordinary hours. 16.11 Employees on a portion of a site not affected by inclement weather must continue to work even though employees working on other areas of the site may have stopped work because of inclement weather. 16.12 Subject to the availability of alternative work in an employee’s classification, an employer may require employees to transfer: (a) from a location on a site where it is unreasonable and/or unsafe to work because of inclement weather, to another area on the same site, where it is reasonable and safe to work; and/or (b) from a site where it is unreasonable and/or unsafe to work because of inclement weather, to another site, where it is reasonable and safe to work, and where the employer, where necessary, provides transport. 16.13 Remaining on site where, because of inclement weather, the employees are prevented from working: (a) for more than an accumulated total of 4 hours of ordinary time in any one day; or (b) after the main meal break, for more than half of the ordinary work time; or (c) during the final 2 hours of the normal workday for more than an accumulated total of one hour; the employer will not be entitled to require the employees to remain on site beyond the expiration of any of the above circumstances. However, where genuine training has been agreed in writing between the parties, then the course maybe completed in extraordinary circumstances. 16.14 Where the employees are in the sheds, because they have been rained off, or because it is at starting time, morning tea, or lunch time, and it is raining, they will not be required to go to work in a dry area or to be transferred to another site unless: (a) the rain stops; or (b) a covered walkway has been provided; or (c) the sheds are under cover and the employees can get to the dry area without going through the rain; or (d) adequate protection is provided. 16.15 Protection must, where necessary, be provided for the employees’ tools.
Insulation In exterior walls? Yes No Unknown In ceiling/attic? Yes No Unknown In any other areas? Yes No Where? Comments: