Assessment of Pumping Systems. The Concessionaire shall undertake a detailed condition and performance assessment of the existing pumping systems for raw water transmission, treated water transmission and boosters if any and assess the efficiency of the existing pumping regime. It shall undertake an energy audit of each pumping installation and assess the overall pumping regime and storage arrangements. This will allow the Concessionaire to develop a plan for optimizing the performance of the pumping units and system in the CIP so as to save energy consumption and extend the life of the units.

Related to Assessment of Pumping Systems

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.

  • Management of Special and Technical Environment Each certificated support person demonstrates an acceptable level of performance in managing and organizing the special materials, equipment and environment essential to the specialized programs.

  • Responsibility for Environmental Contamination 5.20.1 Neither Party shall be liable to the other for any costs whatsoever resulting from the presence or release of any Environmental Hazard that either Party did not introduce to the affected Work Location. Both Parties shall defend and hold harmless the other, its officers, directors and employees from and against any losses, damages, claims, demands, suits, liabilities, fines, penalties and expenses (including reasonable attorneys' fees) that arise out of or result from (i) any Environmental Hazard that the Indemnifying Party, its contractors or agents introduce to the Work Locations or (ii) the presence or release of any Environmental Hazard for which the Indemnifying Party is responsible under Applicable Law. 5.20.2 In the event any suspect materials within Qwest-owned, operated or leased facilities are identified to be asbestos containing, CLEC will ensure that to the extent any activities which it undertakes in the facility disturb such suspect materials, such CLEC activities will be in accordance with applicable local, state and federal environmental and health and safety statutes and regulations. Except for abatement activities undertaken by CLEC or equipment placement activities that result in the generation of asbestos-containing material, CLEC does not have any responsibility for managing, nor is it the owner of, nor does it have any liability for, or in connection with, any asbestos-containing material. Qwest agrees to immediately notify CLEC if Qwest undertakes any asbestos control or asbestos abatement activities that potentially could affect CLEC personnel, equipment or operations, including, but not limited to, contamination of equipment.

  • Environmental and Safety Matters (a) Except as set forth in Section (i) of the ENVIRONMENTAL SCHEDULE, the Company has complied with and is currently in compliance in all material respects with all Environmental and Safety Requirements the non-compliance with which will or threatens to impose a material liability on the Company, and the Company has not received any oral or written notice, report or information regarding any liabilities (whether accrued, absolute, contingent, unliquidated or otherwise) or any corrective, investigatory or remedial obligations arising under Environmental and Safety Requirements which relate to the Company or any of its properties or facilities. (b) Except as set forth in Section (ii) of the ENVIRONMENTAL SCHEDULE, without limiting the generality of the foregoing, the Company has obtained and complied with, and is currently in compliance in all material respects with, all material permits, licenses and other authorizations that are required pursuant to any Environmental and Safety Requirements for the occupancy of its properties or facilities or the operation of its businesses. (c) Except as set forth in Section (iii) of the ENVIRONMENTAL SCHEDULE, neither this Agreement nor the consummation of the transactions contemplated by this Agreement shall impose any obligations on the Company for site investigation or cleanup, or notification to or consent of any government agencies or third parties under any Environmental and Safety Requirements (including, without limitation, any so called "transaction-triggered" or "responsible property transfer" laws and regulations). (d) Except as set forth in Section (iv) of the ENVIRONMENTAL SCHEDULE, none of the following exists at any property or facility owned, occupied or operated by the Company: (1) underground storage tanks or surface impoundments; (2) asbestos-containing materials friable; or (3) materials or equipment containing friable polychlorinated biphenyls. (e) Except as set forth in Section (v) of the ENVIRONMENTAL SCHEDULE, the Company has not treated, stored, disposed of, arranged for or permitted the disposal of, transported, handled or Released any Hazardous Materials, or owned, occupied or operated any facility or property, so as to give rise to liabilities of the Company for response costs, natural resource damages or attorneys fees pursuant to CERCLA or any -38- other Environmental and Safety Requirements. (f) Without limiting the generality of the foregoing, to the knowledge of the Company, no facts, events or conditions relating to the past or present properties, facilities or operations of the Company shall prevent, hinder or limit in any material respect continued compliance with Environmental and Safety Requirements, give rise to any corrective, investigatory or remedial obligations pursuant to Environmental and Safety Requirements or give rise to any other liabilities (whether accrued, absolute, contingent, unliquidated or otherwise) pursuant to Environmental and Safety Requirements (including, without limitation, those liabilities relating to onsite or offsite Releases or threatened Releases of Hazardous Materials, substances or wastes, personal injury, property damage or natural resources damage). (g) Except as set forth in Section (vii) of the ENVIRONMENTAL SCHEDULE, the Company has not, either expressly or by operation of law, assumed or undertaken any liability or corrective, investigatory or remedial obligation of any other Person relating to any Environmental and Safety Requirements. (h) No Environmental Lien has attached to any property owned, leased or operated by the Company.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • COMMERCIAL REUSE OF SERVICES The member or user herein agrees not to replicate, duplicate, copy, trade, sell, resell nor exploit for any commercial reason any part, use of, or access to 's sites.

  • PRE-CONSTRUCTION PHASE SERVICES The Pre-Construction Phase shall be deemed to commence upon the date specified in a written Notice to Proceed with Pre-Construction Phase Services issued by Owner and shall continue through completion of the Construction Documents and procurement of all major Subcontractor agreements. Contractor is not entitled to reimbursement for any costs incurred for Pre-Construction Phase Services performed before issuance of the written Notice to Proceed. Pre-Construction Phase Services may overlap Construction Phase Services. Contractor shall perform the following Pre-Construction Phase Services:

  • Connecting Transmission Owner’s Scope of Work and Responsibilities The Connecting Transmission Owner will design, construct, own, operate and maintain all Connecting Transmission Owner’s Interconnection Facilities, except as otherwise stated above and in the Project Specific Specifications. The Connecting Transmission Owner will complete all engineering reviews, field verifications and witness testing, etc. in accordance with the ESBs and the Project Specific Specifications. Connecting Transmission Owner shall provide the revenue metering CT/PT units and meter socket enclosure. The Connecting Transmission Owner shall: • provide, run, and wire both ends of the color-coded cable for the revenue metering instrument transformer secondary wiring; • perform all terminations; and • supply and install the meter. The revenue meter may require a communications link to the RTU. The Connecting Transmission Owner will specify and run those communications cables. The Connecting Transmission Owner shall complete all wiring, testing and commissioning of the RTU.

  • Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.