Attentional Matrices Sample Clauses

Attentional Matrices. Selective visual attention will be measured using attentional matrices (see Appendix §11.8) at baseline and follow up. In both cohorts the test will be the same. Three matrices of numbers will be administered; each constituting 13 rows of 10 numbers from 0-9 arranged randomly. The participant will be asked to cross out target numbers and the administrator will record the time of completion. Improvement will be assessed by statistically significant improvement in completion time.
AutoNDA by SimpleDocs
Attentional Matrices. If we take into account that the score range is 0-60, and the cut-off value is 30, at the end of the DOREMI project a score of at least 44 is expected. Subjects producing a number of words lower than 30 are expected to be less than 18%.
Attentional Matrices. This is also referred to as: evaluation of selective visual attention [264--107]. Three matrices of numbers were administered; each is constituted by 13 rows of 10 numbers from 0 to 9 randomly arranged. The subject must cross out as fast as possible target numbers. The maximum time for each matrix is 45 seconds. It’s possible to complete the task after the time (45 sec), scoring the numbers crossed and recording the actual time of completion. If the subject takes less than 45 sec., you write down the time. Score range 0-60 Show the 1st matrix and say: "Now you'll have to mark with a pencil all the numbers corresponding to those shown in the top of the matrix." The line A is used as an example. If the person proves that he understood the task, go on. The function of line B is run-in. You must start to count the time only from the line I. You are not allowed to correct dams already made. VI) 4 1 7 4 7 6 9 1 8 3 VI) 4 1 7 4 7 6 9 1 8 3 VI) 4 1 7 4 7 6 9 1 8 3

Related to Attentional Matrices

  • Attachment A, Scope of Services The scope of services is amended as follows:

  • DEVELOPMENT OR ASSISTANCE IN DEVELOPMENT OF SPECIFICATIONS REQUIREMENTS/ STATEMENTS OF WORK

  • General Criteria (a) If general criteria are required as part of the Application, only one (1) set shall be completed. General criteria measure the quality of the Land Manager’s overall OHV program. The Applicants shall answer these questions with respect to the entirety of the OHV operation, including all trails and areas available for OHV Recreation, not just specific Projects or Project Areas. (b) General criteria include, but are not limited to, the following: (1) OHV Opportunity and services provided, (2) Agency contribution to the overall cost of managing and delivering the OHV Opportunity, (3) Management of natural and Cultural Resources, (4) Effective education of rules/regulations, and (5) Past performance in completing and administering Xxxxx funded Projects. (c) Non-land manager Applicants required to complete the general criteria shall cooperate with the Land Manager(s) to obtain the information necessary to complete the general criteria section of the Application. Note: Authority cited: Sections 5001.5 and 5003, Public Resources Code. Reference: Sections 5024.1, 5090.32 and 5090.50, Public Resources Code.

  • General Description of Services The A-E will be contacted by County Project Management staff on an “as-needed” basis as projects arise to provide A-E for professional services. Requirements will be discussed by both Parties and A-E shall prepare a written Scope Statement that will include the specific work to be performed, including the costs and time required to complete the project/task. Orange County Project Management staff will then review the A-E’s Scope Statement, proceed with negotiation of task costs and when satisfied, issue a Contract Task Order (“CTO”) against this Contract. The A-E shall serve as lead of a design team that may include other construction design professionals working together to ensure that the original design is carried through to the finished product, with no alterations in materials or design that would lead to safety issues or compromise the quality of the building or building component. Other team members who may be retained by the lead to support a project as a consultant may include but are not limited to landscape architects, lighting designers, data consultants, security consultants, controls engineers, commissioning consultants, traffic engineers, surveyors, estimators, special inspection, etc. The A-E shall be responsible for the preparation of comprehensive building assessments, designs, drawings, specifications, cost estimates, and reports within the scope of the CTO. In the preparation of construction drawings and specification, the A-E shall also responsible for: A. Obtaining data by reviewing record drawings, visiting the site of the construction and by conferences with the User/Client and facility maintenance staff or by other actions as necessary to develop the design; B. Checking of shop drawings, submittals, materials and other data submitted by the Construction Contractor for approval; C. Furnishing consultation and advice to County to clarify the intent of the drawings and specifications and on questions that may arise during the construction of the project; D. Space planning, programming and code compliance review and upgrades; E. The meeting of submittal dates included in the Scope Statement of the Contract Task Order, including the work of consultants; F. Coordination with various agencies having authority of jurisdiction for planning services, entitlement, fire life safety, CEQA, ADA, etc.; G. Construction administration services, testing and commissioning; H. Close out services, as-built plans, material lists, project acceptance, etc. I. The coordination of the various elements of the design to assure compatibility of architectural, structural, electrical, mechanical/plumbing, and other design features; J. Other services as specifically included in the Contract Task Order related to project Initiation, Planning/Design, Bid/Award, Construction and Closeout. The A-E shall restrict themselves to the Scope Statement of the Contract Task Order. Any changes in the Scope Statement shall require prior written authorization by County.

  • File Management and Record Retention relating to CRF Eligible Persons or Households Grantee must maintain a separate file for every applicant, Eligible Person, or Household, regardless of whether the request was approved or denied. a. Contents of File: Each file must contain sufficient and legible documentation. Documents must be secured within the file and must be organized systematically.

  • Orientation and In-Service Program The Hospital recognizes the need for a Hospital Orientation Program of such duration as it may deem appropriate taking into consideration the needs of the Hospital and the nurses involved.

  • Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.

  • Hot Weather Guidelines For the purposes of site based discussions regarding the need to plan and perform work during expected periods of hot weather, the following issues shall be considered in conjunction with proper consideration of Occupational Health and Safety issues.

  • Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.

  • General Scope of Services Contractor promises and agrees to furnish all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately supply professional services, as more particularly described in Exhibit B (Statement of Work and Misc. Documents) attached hereto and incorporated herein by reference (collectively “Services”). All Services shall be subject to, and performed in accordance with, this Contract, the exhibits attached hereto and incorporated herein by reference, and all applicable local, state and federal laws, rules and regulations.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!